Post on 24-Mar-2022
INTRODUCTION
BOUCHAMAOUI A&R INDUSTRIES
(BI) is an international recognized
construction company covering a large
spectrum of activities in North Africa..
Based in Tunisia, BI provides a full Procurement, Fabrication and
Construction services mainly to Oil & Gas Industry, Industrial Plants and also
to HV Electrical Power Installation.
PRODUCTS & SERVICES
High Voltage Overhead Towers &
Underground Electric Lines.
Pipeline Construction.
Oil & Gas Installations (Production and
treatment facilities )
LNG Multiproduct Storage facilities
BI Quality and HSE Management System is certified in accordance with
standards for all of its activities and projects :
INTEGRATED MANAGEMENT SYSTEM
Quality Management System
ISO 9001 : 2015
Environmental Management System
ISO 14001: 2015
Health and Safety Management System
OHSAS 18001 : 2007
HUMAN RESOURCES
Bouchamaoui Industries employs specialists in the fields of:
Project Management
Engineering & Design
Quality & Safety Management
Finance & Cost control.
Human Resources
Procurement
Construction
Therefore, the Company provides a complete and efficient range of services
for all types of industry and in any location.
DÉSIGNATION OF MACHINE NUMBER
Sidebooms CAT 583 8
Sidebooms CAT 561 10
Excavators from 22 to 45 T 25
Cold Bending Machines (4’’- 42’’) 4
Automatic Welding Trucks (20 “ 42’’) 3
Horizontal Directional Drilling 1
Auger boring Machines (6’’ - 42’’) 2
Backhoes 10
Front wheel loaders (2 - 3.5 m3) 4
Bulldozers D7 & D8 2
Cranes (25 T, 2 x 45 T, 70 T, 80 T) 5
BI possesses an extensive range of equipment which allows the company to
undertake all types of works such as:
EQUIPMENT & FACILITIES
DÉSIGNATION OF MACHINE NUMBER
Low bed trailers from 30 T to 70 T 4
Trucks 6 x 4 & 6 x 6 10
Trucks 10 T 1
Trucks 3.5 T 3
Pick ups 4 x 2 & 4 x 4 80
Minibuses 4
Diesel Welding Generators 20
Electric Welding Machines 120
Electric Generators 35 KV- 650 KV 16
Concrete Batching 45 m3/h 1
EQUIPMENT & FACILITIES
During more than half a century of experience, BI has successfully completed
numerous projects with major Clients such as :
MAJOR CLIENTS
PROJECT
370 Km 24”
Gas Pipeline
Nawara– Gabes
Client
ETAP
OMV
Location
Nawara - Gabes
Completion Date
2019
Project Overview
Gas Pipeline EPC project (In JV With MS Italy) for
the interconnection of Nawara CPF to the GTP
Gabes the projet include :
Western Gas Pipeline from Nawara to Gabès GTP
(370 Km 24”)
2 pig stations (launchers & receivers).
12 block valve stations.
Control and Telecommunications Systems
Photovoltaic system Installation
Pipeline Construction
Click Here For Video Presentation
PROJECT
50 Km 12”
Gas Pipeline
Tataouine
Client
STEG
Location
Tataouine
Completion Date
In Progress
Pipeline Construction
Project Overview
Gas Pipeline Construction for the supply
of natural gas in Tataouine, the projet
include :
• 50 Km PPL construction of 12 Inch
• Pig stations & valve stations.
• Mechanical Works , Electrical Works,
Civil Works…
• PHOTOVOLTAIC system Installation
• FOC Installation
PROJECT
57 Km 20”
16 Km 24”
Gas Pipeline
Tunis - Beja
Client
STEG
Location
Tunis - Beja
Completion Date
In Progress
Pipeline Construction
Project Overview
Gas Pipeline Construction (EPC
project) between Tunis and Beja, the
projet include :
• 57 Km PPL construction of 20 Inch
• 16 Km PPL construction of 24 Inch
• Pig stations & valve stations.
• Mechanical Works / Electrical
Works, Civil Works…
• FOC Installation
• SCADA system Installation
Mornaguia – Mjez Elbeb 16 km 24 Inch
Mjez Elbeb - Béja 57 km 20 Inch
PROJECT
95 Km 20”
75 Km 8”
Gas Pipeline
Feriana – Gafsa
Client
STEG
Location
Coal mines in
Gafsa valley
Completion Date
2016
Project Overview
Gas Pipeline EPC project for the
interconnection of Coal mines in the
Gafsa valley the projet include :
• 95 Km of 20”
• 75 Km of 8”
• Pig stations & valve stations.
• Facility & metering system.
Pipeline Construction
PROJECT
155 Km 12”
Gas Pipeline
Gabés – Djerba -
Zarzis
Client
STEG
Location
Gabés – Djerba -
Zarzis
Completion Date
2016
Project Overview
150 Km of 12” Pipeline from Gabés
to Zarziz
Construction , Testing &
commissioning of 155 Km of 12''
pipeline from Gabés to Zarzis
including:
2 pig stations (launchers &
receivers).
5 block valve stations.
Facility & metering system.
Pipeline Construction
Pipeline Construction
PROJECT
8” Pipeline from
Hannibal Gas Plant
TRAPSA terminal
Client
BG TUNISIA
Location
Hannibal Gas Plant-
TRAPSA Terminal
Completion Date
2006
Project Overview
Engineering, Procurement,
Construction , Testing &
commissioning of 8'' pipeline from
Hannibal Gas Plant – TRAPSA
Terminal.
58 Km of 8’’ condensate
pipeline and associated works
from Hannibal plant (sfax) to
Trapsa Terminal(Skhira).
2 pig stations (launchers
&receives).
33 block valve stations block
valve stations.
Facility & metering system.
PROJECT
LPG & Gas
Pipeline
Client
BG TUNISIA
Location
Sfax/Gabes
Completion Date
2009
Project Overview
Hasdrubal Project : 260 Km of
6’’ LPG Pipeline From hanibal
Gas plant to Gabes
20 Km of 18’’ Multiphase and
Gas Pipelines From hanibal
Gas plant to Ben Sahloul
PROJECT
Gas Pipeline
Client
ENI
Location
Oued Zar
Completion Date
2008
Project Overview
Engineering, procurement and construction of 4 Km
6 "
Pipeline Interconnection from Djebel Grouz to
pipeline 10" STEG
10 Km of 12" Flowline Construction From Oued Zar
to Trapsa
9 Km of 12" Pipeline Construction From Oued Zar
to Trapsa
Pipeline Construction
PROJECT
Gas Pipeline
Client
ENI
Location
El Borma
Completion Date
2007
Project Overview
13km of 8 " Pipeline
Construction Oued Zar El
Borma including EPC manifold
& related piping HP at Oued
Zar.
Pipeline Construction
PROJECT
Pipelines Gaz
Client
PERENCO
Location
Oum Chiah -
Gabes
Completion Date
2006
Project Overview
Project Engineering, procurement
and construction
Loop 10 ’’ Gaz Pipeline from OUM
CHIAH
Gaz to LPG Gaz plant LL
PROJECT
Gas pipelines
interconnection
Client
STEG
Location
Tunis &
Suburbains
Completion Date
2000-2004
Project Overview
Gas pipeline looping:
10 Km of 20" diam pipeline and
related civil works at El Mourouj.
12 Km of 8" diam pipeline and
related civil works at Jbel El
Oust.
5 Km of 4'' diam pipeline and
related civil works in Denden city.
4 Km of 12" diam pipeline and
related civil works from La
Goulette to Radés, including 500
m of horizontal drilling.
13 Km of 20” diameter , 11.2
mm thick pipe+ fiber optic cable
.
5 km of 16 “ diameter , 9.2 mm
thick pipe .
PROJECT
LPG
Recovery
system
Client
STEG
Location
El Borma –
Gabes
Completion Date
1985
Project Overview
300 Km of 6” pipeline transporting
L.P.G from El Borma production
field to the fractionating plant in
Gabes .
50 Km of 6” flow lines .
The construction of the pipeline
included in field coating, pipe
laying through rocky mountains and
major rivers, special points,
installation of pig launchers &
receivers and cathodic protection
etc.
Pipeline Construction
PROJECT
EL Franig/ Baguel
Development-
Pipeline project
Client
CMS
NOMECO
Location
Douz
( South Tunisia)
Completion Date
1998
Project Overview
Designed to transport gas and condensate
from two distant fields in the Tunisian desert,
this project was completed in six months. .
Activities included Survey & right of way,
pipe transport & stinting, welding & NDT,
coating, lowering-in and backfilling,
installation of pig scrapers, block valves
hydro-testing, tie-in to existing lines and
pre-commissioning.
Two main segments were included in this
pipeline:
116 km of 10” FBE coated pipe from El
franig wellhead to the CPF.
39.5 Km of 6” FBE coated pipe from
Bagel wellhead to junction point .
PROJECT
LNG Storage
Facilities
CLIENT
SNDP
LOCATION
Gabés
COMPLETION
DATE
2016
Project Overview
Engineering, Procurement, &
Construction of 6 LNG storage
spheres 4000 m3 each including :
Civil work
Mechanical work
Electrical &
Instrumentation
Control System
Fire fighting system
Storage Tanks and Spheres
Click Here For Video Presentation
PROJECT
Réalisation de 11
bacs et réservoirs
en acier.
CLIENT
TIFERT
LOCATION
Skhira –Tunisia
COMPLETION
DATE
2010
Storage Tanks and Spheres
Project Overview
Construction of 11 sulfuric and
phosphoric acid storage tanks for the new
TIFERT production plant in Skhira.
The project includes :
Engineering
Procurement
Prefabrication & Manufacturing
Commissioning
PROJECT
LPG Storage
Terminal
CLIENT
SNDP
LOCATION
Rades –Tunisia
COMPLETION
DATE
2009
Storage Tanks and Spheres
Project Overview
Engineering, Procurement, &
Construction of 4 LNG storage
spheres 4000 m3 each including :
Civil work
Mechanical work
Electrical &
Instrumentation Works
Control System
Fire Fighting system
PROJECT
Multi Product
Storage Tanks
CLIENT
SEPT
LOCATION
Skhira Terminal –
Sfax
COMPLETION
DATE
2004
Storage Tanks and Spheres
Project Overview
Engineering, procurement and
construction of 12 multi product storage
tanks with floating roofs (120 000 m3)
including:
Piping and mechanical works .
Electrical & instrumentation works .
Civil works
DCS & metering system .
Complete fire fighting system .
LOCATION
Southern
Tunisia
PROJECT
Oil Storage
Tanks
Construction
CLIENT
PIONEER
COMPLETION
DATE
2009
Project Overview
Engineering, procurement and
construction. of Two 30.000
BBL Crude Oil Storage Tanks
For The WAHA
The project includes :
Civil works
Mechanical works
Electrical & Instrumentation
Works
Fire Fighting system
Storage Tanks and Spheres
PROJECT
Tank Farm
Client
MINISTRY OF
OIL(IRAK)
Location
El Basra
Terminal -Irak
Completion Date
2002
Project Overview
Design, engineering, procurement and
construction of a tank farm.
The work included :
4 crude oil storage tanks with
floating roofs and a capacity of
58 000 m3 each.
A complete fire fighting system.
All interconnecting piping an
mechanical works.
All electrical & instrumentation
works .
Storage Tanks and Spheres
PROJECT
Sidi Kilani
Oil field
Client
CTKP
Location
Kairouan,
Tunisia
Completion Date
2003
Project Overview
Engineering, Procurement and
installation:
30 000 bbls crude oil tank
A complete fire fighting
system.
A 7 km of fiber glass
pipeline.
A 5 km of 6” pipeline
including tieins & hook –
ups.
Central Processing Facility
PROJECT
Nawara
Development-
project
Client
ETAP
OMV
Location
Nawara Field
Project Overview
Engineering, procurement, construction,
of Central Processing Facility (In JV
With MS Germany) including Gas &
condensate pipelines interconnection and
related facilities, It included:
Central processing facilities PLANT
with utilities : (The capacity of the
CPF will match the export capacity
of 2.7 MSCMD)
Nine (9) Flowlines with methanol
distribution lines and FOC in trench
line (89 Km of 6”)
Nawara Accommodation Camp
Fiscal metering for gas and
condensate products
Completion Date
In Progress
Central Processing Facility
PROJECT
EL Franig/ Baguel
Development-
project
Client
CMS
NOMECO
Location
Oum Chiah
( South Tunisia)
Project Overview
Engineering, procurement, construction,
commissioning & start-up of El Franig/
Baguel / Central Processing Facility
including Gas & condensate pipelines
interconnection and related facilities, It
included:
Civil work
Mechanical work.
Firefighting system
Transfer pumps
Elec./Instrumentation
116 km of 10” FBE coated pipe from
El franig wellhead to the CPF.
39.5 Km of 6” FBE coated pipe from
Bagel wellhead to junction point .
4 pig launchers & receivers stations
8 Section valve stations
Central Processing Facility
PROJECT
EZZAOUIA Oil
Field Development
Client
MARATHON
OIL LTD
Location
ZARZIS
Project Overview
Construction of Central Production
Facility including :
* Civil works,buildings, piping, tanks,
electrical and instrumentation &
control.
Construction of Storage and loading
terminal including civil works,
buildings, piping,tanks (main tank with
220 000 bbl capacity),
* Installation of cathodic protection
system .
* Installation of heat tracing system .
Project Overview
High Voltage tower installation
including civil work, tower
erection and cable stringing of :
• 83 Km of 150 KV Single
Circuit Line
HIGH VOLTAGE TOWER TRANSMISSION LINES
CLIENT
STEG-JYOTI
LOCATION
MDHILA -
TOZEUR
COMPLETION DATE
2012
PROJECT
HIGH VOLTAGE
TOWER
CLIENT
STEG - JYOTI
Project Overview
High Voltage tower installation
including civil work, tower
erection and cable stringing of:
• 127 Km of 225 KV
• 274 Km of 150 KV
• 375 Km of 90 KV
PROJECT
HIGH VOLTAGE
TOWER
COMPLETION DATE
2008
HIGH VOLTAGE TOWER TRANSMISSION LINES
Client
STEG -KEC
Project Overview
High Voltage tower installation
including civil work, tower
erection and cable stringing of:
• 220 Km of 400 KV
• 70 Km of 225 KV
• 150 Km of 150 KV
PROJECT
HIGH VOLTAGE
TOWER
COMPLETION DATE
2006
HIGH VOLTAGE TOWER TRANSMISSION LINES
Project Overview
Construction of 225/400 KV Over
head Power Transmission Line
Interconnection between Tunisia &
Libya
• 334 Km of 400/225 KV Over head.
CLIENT
STEG
LOCATION
SFAX -
MEDENINE
COMPLETION DATE
2001
PROJECT
HIGH VOLTAGE
TOWER
HIGH VOLTAGE TOWER TRANSMISSION LINES
Project Overview
133 km 225 KV burried cable
including all Civil works
3 km of Horizontal drilling
under channels (1 x 1000 m)
(8 x 150-450m)
* Cable laying and
connection
CLIENT
STEG/
PIRELLI-NEXANS
LOCATION
TUNIS & BIZERTE
COMPLETION DATE
2006
PROJECT
HIGH VOLTAGE
UNDERGROUND CABLES
Project Overview
• 4,7 Km of 225 KV
(Goulette/Mnihla)
• 27 km of HV underground
cable laying
CLIENT
STEG/
NEXANS-PRYSMIAN
LOCATION
TUNIS-GOULETTE -
MNIHLA
COMPLETION DATE
2009 & 2011
PROJECT
HIGH VOLTAGE
UNDERGROUND CABLES
HIGH VOLTAGE TOWER TRANSMISSION LINES
PROFILCOMPANY INFORMATION
Company Name BOUCHAMAOUI A&R INDUSTRIES
Capital : 19 327 400 TND
Date : 05 Juin 1995
Type : Limited Company
Trade Register N° : 102566V
Head Office: 55, Rue 8600, Z.I. Charguia I – Tunis Aéroport – 2035 Tunis
Tel/Fax/Website +216 71 206 850 /+216 71 206 855 / www.bouchamaoui.net