Post on 27-Jul-2020
Oklahoma State Regents for Higher Education
Annual Campus Master Plan Submission Summary Form
June 12, 2013
Institution or Agency: The University of Oklahoma – 760
Total number of records submitted: 55 Total number of records requiring new State Dollars (long format): 11 Total number of “Self-funded” projects submitted: 44 Contact Person’s Name: Michael K. Moorman, Director Architectural and
Engineering Services Contact Person’s Phone Number: 405-325-6006 Please return this form to the attention of Sheri Mauck by June 12, 2013, or as soon as your institution completes the data entry of all projects. You may return the form by fax to (405) 225-9230, by email to smauck@osrhe.edu or by mail to 655 Research Parkway, Suite 200, Oklahoma City, OK 73104.
THE UNIVERSITY OF OKLAHOMA May 9-10, 2013
15.0
AGENDA ITEM 15 ISSUE: CAMPUS MASTER PLAN OF CAPITAL IMPROVEMENT
PROJECTS – ALL ACTION PROPOSED:
President Boren recommends the Board of Regents approve the revised Campus Master Plan of Capital Improvement Projects for the Norman, Oklahoma City and Tulsa campuses of the University. BACKGROUND AND/OR RATIONALE:
The Oklahoma State Regents for Higher Education have requested that each institution in the State system submit in June of each year an update of the Campus Master Plan of Capital Improvement Projects. Following approval by the State Regents at their June meeting, the Campus Master Plan will be submitted to the State Long Range Capital Planning Commission as required by statute. The Commission is charged with the responsibility of preparing a five-year State Capital Plan which is submitted in December of each year to the Governor, Speaker of the House of Representatives and President Pro-Tempore of the Senate.
The development of the Capital Improvement Plan for the Norman, Oklahoma City and Tulsa campuses has been completed following a review of current capital needs by executive officers. Attached for consideration and approval by the Board are prioritized project lists for each campus along with project descriptions providing additional information about each of the projects included in the plan. The projects for each campus are prioritized in groups as follows.
I. Highest priority projects for which State funding is requested;
II. Projects which are currently in planning, design or are under construction and for which funding has been identified in full or in part; and
III. High priority projects, funding not currently available.
New projects which have not previously been approved by the Board are shown in the
listings and descriptions in boldface type.
May 9-10, 2013
1
CAMPUS MASTER PLAN OF CAPITAL IMPROVEMENT PROJECTS FOR THE NORMAN CAMPUS I. HIGHEST PRIORITY PROJECTS FOR WHICH STATE FUNDING IS REQUESTED, NORMAN CAMPUS Priority Estimated Number Project Name Total Cost 1 Hester Hall Renovation for College of International Studies $ 13,500,000 2 Fine Arts Center, Rupel Jones Theatre Renovation 5,000,000 3 Classroom Renovation and Improvements 3,000,000 4 Radar Innovations Laboratory 15,800,000 5 Campus Bicycle/Pedestrian Paths 2,000,000 6 Physical Sciences Center Life Safety Improvements 4,000,000 7 Bizzell Memorial Library, Neustadt Wing Lower Level 1 5,000,000 Renovation 8 Research Campus Infrastructure 5,000,000 9 Research and Instructional Equipment 4,000,000 10 Information Technology Improvements 6,000,000 11 Asset Preservation Projects – Level III 32,000,000 II. PROJECTS IN PLANNING, DESIGN OR CONSTRUCTION, FUNDING IDENTIFIED IN FULL OR IN PART, NORMAN CAMPUS Estimated Number Project Name Total Cost 12 Asset Preservation – Level II 13,000,000 13 Multi-Tenant Office Facility No. 4 at Research Campus 36,500,000 (Four Partners Place) 14 Multi-Tenant Office Facility No. 5 at Research Campus 28,000,000 (Five Partners Place) 15 Devon Energy Hall Clean Room 3,000,000 16 Jan Marie and Richard J. Crawford University Club Renovation 4,500,000 17 Scholars Walk/Asp Avenue Reconstruction 10,300,000
May 9-10, 2013
2
18 Arezzo, Monastero Delle Clarisse di Santa Chiara 14,000,000 19 S. J. Sarkeys Complex, Huston Huffman Center Addition 15,000,000 and Locker Rooms Renovation 20 Utility Plant #4 73,000,000 21 Catlett Music Center, Paul F. Sharp Concert Hall Organ 16,000,000 22 Stephenson Life Sciences Research Center, Protein Production 700,000 Core Facility 23 Oklahoma Memorial Union Market 1,700,000 24 Oklahoma Memorial Union Technology Store 2,000,000 25 Acquisition of Property 10,000,000 26 Water Innovative Research Laboratory 15,000,000 27 Headington Hall Student Housing 75,000,000 28 Parking Expansion 5,000,000 29 Campus Streets and Drives 9,500,000 30 Max Westheimer Airport Improvements 13,400,000 31 Bud Wilkinson House/Wagner Dining Hall Renovations 14,000,000 32 Jimmie Austin OU Golf Club Improvements 6,000,000 33 Charlie Coe Golf Learning Center and Team Practice Facilities 4,000,000 34 Gaylord Family-Oklahoma Memorial Stadium Improvements, Phase VI 9,000,000 35 L. Dale Mitchell Baseball Park Expansion and Improvements 4,000,000 36 Softball Facility Expansion and Improvements 4,000,000 37 McCasland Field House Renovation and Improvements, Phase III 5,200,000 38 Varsity Rowing Practice Center 6,500,000 39 Boathouse 6,500,000 40 Emergency Repairs, Renovations and Equipment and 2,540,697 Technology Acquisitions, 2012-13 41 Emergency Repairs, Academic and Administrative Renovations, 1,842,930 and Equipment and Technology Acquisitions, 2013-2014
May 9-10, 2013
3
III. HIGH PRIORITY PROJECTS, FUNDING NOT CURRENTLY AVAILABLE, NORMAN CAMPUS Estimated Number Project Name Total Cost 42 S. J. Sarkeys Complex Addition for Health and Exercise Science $ 10,000,000 43 Chemistry Building Renovation 10,000,000 44 Repository of Art, Public Affairs and History Collections 6,000,000 45 Cate Center Residence Halls Window Replacement 800,000 46 Biological Sciences Building 80,000,000 47 Life Sciences Center, Phase II 50,000,000 48 Armory Renovation 12,000,000 49 Multi-Tenant Light Industrial Facilities, Phase I 16,000,000 50 Kessler Farm Interdisciplinary Field Laboratory 3,000,000 51 Central Theatrical Set and Costume Design Facility 2,000,000 52 School of Art Facilities at Research Campus 10,900,000 53 College of Continuing Education Office Building 32,000,000 54 Fred Jones Art Center Renovation for the School of Art 8,000,000 55 University Research Campus-North Infrastructure Improvements 7,500,000
May 9-10, 2013
4
CAMPUS MASTER PLAN OF CAPITAL IMPROVEMENT PROJECTS FOR THE OKLAHOMA CITY CAMPUS I. HIGHEST PRIORITY PROJECTS FOR WHICH STATE FUNDING IS REQUESTED, OKLAHOMA CITY CAMPUS Priority Estimated Number Project Name Total Cost 1 Campus Fire Sprinkler Systems $ 2,000,000 2 Academic and Administrative 4,426,000 Construction/Renovations 3 Academic and Administrative 21,774,000 Equipment 4 Campus ADA Improvements 872,000 II. PROJECTS IN PLANNING, DESIGN OR CONSTRUCTION, FUNDING IDENTIFIED IN FULL OR IN PART, OKLAHOMA CITY CAMPUS Estimated Number Project Name Total Cost
5 Peggy and Charles Stephenson Cancer Center $ 137,500,000 6 Harold Hamm Diabetes Center Renovation 2,500,000 7 Dentistry Curriculum Redesign & Patient Delivery 20,776,000 System Facilities Remodel, Phases I, II and III
8 Peggy and Charles Stephenson Cancer Center Phase I Clinical 1,128,000 Trials Expansion 9 Basic Sciences Education Building Air Entrainment Project 1,000,000 10 Rogers Building 5th Floor Remodel for IT Office Space 800,000 11 Asset Preservation Improvements 15,232,000 12 Research Park Acquisition 85,000,000 III. HIGH PRIORITY PROJECTS, FUNDING NOT CURRENTLY AVAILABLE, OKLAHOMA CITY CAMPUS Estimated Number Project Name Total Cost 13 Renovation of East and West Lecture Halls in the BSEB $ 1,000,000
May 9-10, 2013
5
14 Public Health Auditorium Renovation 1,700,000 15 Operations Center 6,200,000 16 East Parking Structure 12,000,000 17 David L Boren Student Union 4th Floor Addition 3,000,000
18 Biomedical Sciences Building Laboratory Modernization Project 6,000,000
19 College of Nursing Building Updates 12,000,000 20 G. Rainey Williams Pavilion Renovation and Modernization 3,900,000
May 9-10, 2013
6
CAMPUS MASTER PLAN OF CAPITAL IMPROVEMENT PROJECTS FOR THE TULSA CAMPUS I. HIGHEST PRIORITY PROJECTS FOR WHICH STATE FUNDING IS REQUESTED, TULSA CAMPUS Priority Estimated Number Project Name Total Cost 1 Academic and Administrative $ 2,405,000 Renovations & Equipment 2 Campus Infrastructure 7,511,000 Improvements II. PROJECTS IN PLANNING, DESIGN OR CONSTRUCTION, FUNDING IDENTIFIED IN FULL OR IN PART, TULSA CAMPUS Estimated Number Project Name Total Cost 3 Wayman Tisdale Specialty Health Clinic $18,700,000 4 Schusterman Center Clinic Outpatient Surgery Procedure Suite 300,000
5 OU Physicians Clinical Facilities 2,500,000
III. HIGH PRIORITY PROJECTS, FUNDING NOT CURRENTLY AVAILABLE, TULSA CAMPUS Estimated Number Project Name Total Cost
6 Digital Radiography (DR) Unit $ 93,000 7 Exterior Campus Enhancements 1,500,000 8 Simulation Center 3,750,000 9 Campus Parking Enhancements 400,000 10 Library Phase II 7,575,000 11 East Side Parking Facility 9,000,000
May 9-10, 2013
7
CAMPUS MASTER PLAN OF CAPITAL IMPROVEMENT PROJECTS PROJECT DESCRIPTIONS, NORMAN CAMPUS: The following pages contain additional information about each of the capital projects contained in the preceding Campus Master Plan of Capital Improvements Projects for the Norman Campus. I. HIGHEST PRIORITY PROJECTS FOR WHICH NEW STATE FUNDING IS
REQUESTED, NORMAN CAMPUS 1 Hester Hall Renovation for College of International Studies: This project will provide
limited new construction and the total renovation of Hester Hall for the College of International Studies. The new construction will include an addition on the west façade of the three story element. This addition will become the front door of the College and house a two-story lobby, elevator and open stair. Two new stair towers will be constructed to improve building circulation and provide adequate emergency egress. The three-story element of the building will be renovated to house the Dean’s office, staff offices and a quiet study area on the first floor, with faculty offices and small conference and seminar rooms on the second and third floors. The one-story element will house International Student Services and Education Abroad as well as three classrooms, a seminar room, a formal conference room and the college living room. This project also will update the life safety, HVAC and electrical systems, renovate existing and add new restrooms, and improve accessibility. New windows will be installed and the existing brickwork will be tuckpointed to improve the appearance of the exterior. The estimated total project cost is $13,500,000, with new State funds requested.
2 Fine Arts Center, Rupel J. Jones Theatre Renovation: This project will include
renovation of interior spaces and the supporting mechanical and electrical systems necessary for the continued use of the Rupel Jones Theatre. Stage rigging and flooring will be refurbished, lighting and audio equipment will be upgraded, and curtains replaced. In addition, theatre seating will be replaced and other patron facilities renovated. The estimated total project cost is $5,000,000, with new State funds requested.
3 Classroom Renovation and Improvements: The University's Classroom Renovation Task
Force has recommended implementation of basic minimum standards for classroom configuration in order to address overcrowding and inadequate seating, and to provide the technology necessary for a quality teaching and learning environment. An aggressive program is underway to bring the current 140 centrally scheduled classrooms, comprising over 140,000 net square feet of space, up to the basic standards. This project will provide funding of $3,000,000 for renovations and instructional equipment in a number of classrooms identified as most critically in need of improvement. New State funds are requested.
4 Radar Innovations Laboratory: The Radar Innovations Laboratory will be located on the
University Research Campus south of One Partners Place and east of the National Weather Center. The approximately 36,000-gross-square-foot building will create open working space for research efforts pertaining to the design, assembly and testing of radar system components. The building will provide office space for 20 researchers and up to 60 graduate students, with supporting fabrication shops and test areas. Two anechoic chambers, one for low frequency research and one for high frequency research, will be
May 9-10, 2013
8
installed within the test area. The estimated total project cost is $15,800,000, with new State funds requested.
5 Campus Bicycle/Pedestrian Paths: This project will provide funding of $2,000,000 for
implementation of a bicycle/multimodal transportation system throughout campus. When fully developed, this system will interconnect the campus community and link with the City of Norman beyond. New State funds are requested
6 Physical Sciences Center Life Safety Improvements: This project will include fire
sprinkler and alarms systems, emergency lighting, and other life safety improvements in several areas of the Physical Sciences Center. The estimated total project cost is $4,000,000, with new State funds requested.
7 Bizzell Memorial Library, Neustadt Wing Lower Level 1 Renovation: This project
involves a complete renovation and modernization of approximately 18,000 gross square feet on the Lower Level 1 of the 1983 Neustadt Wing addition. The design supports collaborative student learning spaces, creates classroom and changeable work space areas and includes a variety of individual and group study areas including seminar space, group meeting areas, computer laboratory and facility research areas. The existing Bookmark Café will be renovated and customer seating areas expanded. Restrooms on the floor will also be remodeled and made ADA compliant. The estimated total project cost is $5,000,000, with new State funds requested.
8 Research Campus Infrastructure: The University’s efforts to develop the Research
Campus continues. Some of the remaining infrastructure is in poor condition, and in many instances has been out of use for an extended period of time. The Master Plan for the area is being updated and will be implemented as new building projects are identified. The infrastructure improvements include utilities; site clearing; construction of roads, drives and parking; and information technology systems expansion. This project will provide additional funding of $5,000,000 to prepare the Research Campus for the next phase of development. New State funds are requested.
9 Research and Instructional Equipment: Funds are to be used to purchase new equipment
for teaching and research programs. Purchases are needed to replace, modernize and augment equipment used in classroom and laboratory instruction and in research programs. Part of the equipment will be used to support the teaching and research activities of newly hired faculty including some who will occupy endowed chairs. Funding in the amount of $4,000,000 is proposed from new State funds.
10 Information Technology Improvements: A number of information technology
improvements are needed to address data protection needs at the Norman campus. This project would modernize network security infrastructure by providing high performance firewalls, intrusion prevention systems, network access management, mobile device encryption, compliance management, and secure code analysis enabling the University to manage the risk of data loss and misuse of University resources. New State funds of $6,000,000 are requested.
11 Asset Preservation Projects – Level III: Capital requirements for the preservation of the
University’s facilities and infrastructure have been listed and categorized, including estimates of project costs. The work included in this group of asset preservation projects has been identified as Level III (i.e., condition will allow some further delay, however its delay will result in increased maintenance and operations costs). The projects include deferred maintenance projects, energy conservation work, new and upgraded elevators,
May 9-10, 2013
9
lighting upgrades, roof repair and replacement projects, accessibility improvements, and utility upgrades. The estimated total cost for these projects is $32,000,000 with funding proposed from new State funds.
II. PROJECTS IN PLANNING, DESIGN OR CONSTRUCTION, FUNDING IDENTIFIED
IN FULL OR IN PART, NORMAN CAMPUS 12 Asset Preservation Projects – Level II: Capital requirements for the preservation of the
University’s facilities and infrastructure have been listed and categorized, including estimates of project costs. The work included in this group of asset preservation projects has been identified as Level II (i.e., condition will allow for only a short delay) and is critical in order for University departments to carry out their mission. The projects include deferred maintenance projects, roof repair and replacement projects, new and upgraded elevators, accessibility improvements, and utility upgrades. The estimated total cost for these projects is $13,000,000 with funding from institutional resources and general revenue bond proceeds.
13 Multi-Tenant Office Facility No. 4 at Research Campus (Four Partners Place): This
project will provide approximately 75,000 square feet of space, including general office space for University research programs and which may be leased to entities wishing to locate near other technology resources at the Research Campus. Also included in the new facility will be a Data Center which will consolidate the University’s high performance and mission critical computing assets into a dedicated and secure facility. The new Data Center is intended to house the equipment for the OU Supercomputing Center for Education & Research (OSCER), Department of Physics and Astronomy high energy physics research, and Information Technology’s Network Operations Center. Necessary infrastructure and parking areas associated with the new building will also need to be constructed as part of the project. The estimated total project cost is approximately $36,500,000 to be funded from general revenue bond proceeds.
14 Multi-Tenant Office Facility No. 5 at Research Campus (Five Partners Place): This new
four-story building will provide approximately 100,000 square feet of space, including general office space for University research programs and space which may be leased to entities wishing to locate at the Research Campus. Necessary infrastructure associated with the new building will also need to be constructed as part of the project. The estimated total project cost is approximately $28,000,000 to be funded from general revenue bond proceeds.
15 Devon Energy Hall Clean Room: This project will modify space in Devon Energy Hall
for research that can be conducted only in a highly clean environment. A clean room facility, operated as a University-wide shared resource, will provide capabilities that currently do not exist on campus. The availability of such a facility will substantially enhance opportunities for future research grant funding. The estimated total project cost is approximately $3,000,000 with funding from general revenue bond proceeds.
16 Jan Marie and Richard J. Crawford University Club Renovation: This project will
completely renovate the existing University Club space to make it more efficient, to provide additional and improved kitchen space permitting a larger variety of foods to be prepared and served to patrons, and to make significant improvements to the aesthetic design of the space. As a part of the project, public restrooms serving the club which are located off the adjacent public corridor will be renovated, as will the public corridor. Additionally, the Frontier Room, the Weitzenhoffer Room and the Heritage Room located across the corridor to the west of the club will be refurbished as a part of the
May 9-10, 2013
10
project. The estimated total project cost is $4,500,000 with funding from private sources, general revenue bond proceeds and Section 13/New College funds.
17 Scholars Walk/Asp Avenue Reconstruction: This project will reconstruct VanVleet Oval
into a pedestrian mall north from Lindsey Street to tie into the Brooks Pedestrian Mall. The new mall, to be called Scholars Walk, will feature plaques recognizing the most outstanding honors received by the University’s graduates. The first two statues honoring the University’s most prominent faculty will also be included in this project. In addition, Asp Avenue between Brooks Mall and Lindsey Street will also be reconstructed to become a two-way street with on-street bus loading, staging, and parking as well as a cul-de-sac near Brooks Mall for a turn-around. To accommodate the anticipated improvements in these areas, it will be necessary to relocate the bus staging and transfer area from Asp Avenue and Brooks Street to a new location. Also, a portion of the Botany-Microbiology greenhouse facility will be demolished and the facility will be reconfigured. The estimated total project cost is $10,300,000, with funding to be provided from private sources, general revenue bond proceeds and Section 13/New College funds.
18 Arezzo, Monastero Delle Clarisse di Santa Chiara: This project involves the extensive
renovation of a former monastery in Arezzo, Italy, to create dormitory space for approximately 50 students in combinations of single and double occupancy rooms with bath facilities. The approximately 30,000-gross-square-foot building will also include three classrooms, a library, a dining facility and small kitchen. In addition, a faculty-in-residence apartment and limited administrative space will be created. The project will provide complete utility infrastructure including life safety systems. The exterior of the building will be restored and a new landscaped garden area will be created. Total costs for the renovation are anticipated to be approximately $14,000,000, with funding from private and discretionary resources.
19 S. J. Sarkeys Complex, Huston Huffman Center Addition and Locker Rooms Renovation:
This project involves an approximately 20,000-gross-square-foot addition at Huston Huffman Center for expansion of the general recreation and exercise space in the facility. In addition, the existing men’s and women’s locker rooms would be renovated and modernized. The estimated total project cost is $15,000,000, with funding of $5,000,000 from general revenue bonds supported by student facility fees and $10,000,000 from other sources to be determined.
20 Utility Plant #4: This new utility plant is intended to augment the existing Chilled Water
Plants 1 and 2. With the rapid growth of the campus, the existing plants are nearing full capacity and can no longer be expanded due to site and piping limitations. The new plant was originally identified as a need in the 1997 Norman Campus Utilities Master Plan. The plant will be centrally located just north of the Huston Huffman Center, and will provide chilled water, steam and electricity for expanding campus facilities. The estimated total project cost is $73,000,000, with funding of $72,250,000 from University bond funds and $750,000 from chilled water assessment fees.
21 Catlett Music Center, Paul F. Sharp Concert Hall Organ: This project involves expansion
of the Paul F. Sharp Concert Hall and associated renovations needed to allow for the installation of the University’s Moller organ. Also included is the estimated cost to restore and install the organ (approximately $5,000,000). The estimated total cost is $16,000,000, with funding from private sources.
22 Stephenson Life Sciences Research Center, Protein Production Core Facility: The
renovation plan includes reconfiguration of a two-module laboratory area in the
May 9-10, 2013
11
Stephenson Life Sciences Research Center, on the second floor adjacent to the Macromolecular X-ray and Crystallization Laboratory, creating a Protein Production Core Facility. The renovation for this new facility is associated with a National Institutes of Health grant received to establish a Center of Biomedical Research Excellence in Structural Biology. The reconfiguration will result in a secure stand-alone laboratory with central hallway access. An equipment alcove will be created with additional wall and floor space for laboratory equipment. Also, a number of modifications to existing lab modules adjacent to the PPCF and in other building locations will be made to accommodate the new faculty hired in association with a NIH grant and to relocate the displaced research groups. The estimated total cost for the project is $700,000 with funding provided from NIH grant funds ($220,000) and from the Office of the Vice President for Research ($480,000).
23 Oklahoma Memorial Union Market: This project involves renovation of the space
formerly occupied by Wendy’s to create a modern food services market, providing popular healthy meal, snack and beverage choices. The estimated total project cost is $1,700,000, with funding from Food Services.
24 Oklahoma Memorial Union Technology Store: This project involves renovation of
the space formerly occupied by the Union bookstore to create areas for computer and electronic device sales, accessory sales, support and service for devices. The project will include a training room for workshops and one-on-one training as well as open demonstration space to showcase innovative new technology for students and faculty. The estimated total project cost is $2,000,000, with funding from discretionary University resources.
25 Acquisition of Property: The project will allow the University to facilitate the
strategic and desirable acquisitions of real property as deemed necessary to support the mission of the University. The proposed total budget is $10,000,000, with funding from revenue bond proceeds and other sources.
26 Water Innovative Research Laboratory: The proposed new facility will serve as a
visible front door to the University’s water-related education, research and outreach programs, will showcase water conservation and expand community and global awareness. It will operate as center for collaborative investigative research, provide water-related public services and provide both student and public hands-on education and training. It is anticipated that the building may include offices, laboratories, laboratory support, a water quality testing facility, an active learning classroom, demonstration watershed, display and visualization technology, video-conferencing capabilities, and public learning spaces. The preliminary budget for total project costs is $15,000,000. Funding for preliminary planning and design has been identified from University sources.
27 Headington Hall Student Housing: The proposed new facilities will house students and
student athletes in a combination of two- and four-bed units totaling approximately 380 beds. The building is planned to be a mid-rise structure, with central dining, laundry facilities, computer labs, study rooms, and other support facilities on the ground floor. The project will also include a Faculty-In-Residence apartment. The total project cost is $75,000,000. Funding will be provided through a combination of private and other Athletics Department funds and revenue bonds.
28 Parking Expansion: This project provides ongoing funding for a number of parking lot
projects and includes demolition, site preparation and lot construction. The total project
May 9-10, 2013
12
budget is $5,000,000 with funding from Parking and Transportation auxiliary funds and revenue bond funds.
29 Campus Streets and Drives: This project provides for the repair and resurfacing of a
variety of campus streets, drives, parking areas and other paved surfaces in need of refurbishment. The total project budget is $9,500,000 with funding from general revenue bond proceeds.
30 Max Westheimer Airport Improvements: This project provides for a variety of
improvements to the Max Westheimer Airport that will be required to support its continued maintenance and development. The anticipated work includes the following: (1) construct and light new (west) taxiway; (2) rehabilitate any and all airport pavements to include runways, taxiways, taxi-lanes, aprons and ramp areas (3) construct new air traffic control tower; (4) upgrade security camera system; (5) infrastructure development for north and/or south airport property; (6) update the airport master plan; (7) update the airport layout drawing; (8) expand Terminal Building parking; (9) reconstruct fuel lane and taxi lane adjacent to South Ramp; (10) improve drainage, (11) install/replace runway/taxiway lights and signs as necessary; and (12) other improvements and repairs. The estimated cost of these project elements is $13,400,000 to be funded from a combination of Federal Aviation Administration and Oklahoma Aeronautics Commission grants and airport auxiliary funds, as well as general revenue bonds.
31 Bud Wilkinson House/Wagner Dining Hall Renovation: A study has been
undertaken to assess the viability of repurposing these two buildings for other functions upon the relocation of student housing and dining to Headington Hall. The Athletic Academic Services program is proposed to be relocated from the second floor of the Gaylord Family-Oklahoma Memorial Stadium into Bud Wilkinson House. The existing 29,650 square foot building would be expanded to approximately 42,000 square feet to accommodate the program’s current and future academic needs. The facility would also feature a central stairway and elevator, new façade, and upgrades to restrooms and mechanical and electrical systems. Wagner Dining Hall is proposed to be renovated into a banquet facility for use by the University O-Club and would also serve as a central study hall for student athletes. The remodel would include new interior finishes in the dining area, new equipment designed for catered events in the kitchen, new restrooms, and new mechanical and electrical systems. The estimated total project cost is $14,000,000. Funding for preliminary planning has been identified from Athletics Department sources.
32 Jimmie Austin OU Golf Club Improvements: This project provides a variety of
improvements for the Jimmie Austin Golf Course. Improvements include a relocated maintenance facility, new clubhouse, residential cottages and various course and practice area renovations. Also included are much needed projects to upgrade the irrigation system infrastructure and to repair erosion problems in Bishop Creek and adjoining holes. The project will be developed incrementally over an extended time period. The initial project phase is estimated to cost approximately $6,000,000 with funding from private sources and general revenue bond proceeds.
33 Charlie Coe Golf Learning Center and Team Practice Facilities: The Athletic
Department has identified various team support areas that are needed at the Charlie Coe Golf Learning Center. The improvements include additional equipment storage and workout areas as well as improvement of the practice area. The estimated total project cost is $4,000,000, with funding to be provided from a combination of private and other Athletics Department funds.
May 9-10, 2013
13
34 Gaylord Family Oklahoma Memorial Stadium Improvements, Phase VI: This project
will include continued renovations to the west mezzanine and refurbishment of the east side suites, the Santee Lounge and the Kerr McGee Stadium Club. Also included are maintenance, repairs, and improvements to the east stadium structure. The estimated total cost for the project is $9,000,000, with funding to be provided from Athletics capital funds.
35 L. Dale Mitchell Baseball Park Expansion and Improvements: The Athletic Department
has reviewed and identified the need for updates and improvements to spectator seating, fan amenities, and team facilities at L. Dale Mitchell Baseball Park, with an estimated total cost of $4,000,000, with funding to be provided from a combination of private and other Athletics Department funds.
36 Softball Facility Expansion and Improvements: The Athletic Department has reviewed
and identified the need for updates and improvements to spectator seating, fan amenities, team facilities, and parking expansion and other site improvements at the Softball Facility, with an estimated total cost of $4,000,000, with funding to be provided from a combination of private and other Athletics Department funds.
37 McCasland Field House Renovation and Improvements, Phase III: The primary elements
of this phase of the project are modifications for improved energy efficiency, including window and skylight replacement, and for improved accessibility, including walks and paving around the building’s exterior; structural repairs; roof replacement; and masonry restoration. The estimated total project cost for this phase is$5,200,000, with funding to be provided from a combination of private and other Athletics Department funds.
38 Varsity Rowing Practice Center: Plans call for construction of an approximately 24,000-
square-foot building to provide space to house indoor practice facilities for the women’s intercollegiate rowing team and to consolidate various Athletics Department storage needs. The rowing team facilities will include a rowing tank, team room and meeting spaces, a workout area, lockers/showers, and storage and laundry areas. The proposed new facility is estimated to require a total project budget of approximately $6,500,000, with funding to be provided from private funds within Athletics Department capital accounts.
39 Boathouse: The proposed new boathouse will be located in Oklahoma City near other
existing and future facilities on the Oklahoma River. The facility will include space for storage of shells, oars, ergometers, and other equipment; a changing/locker area with showers; a multi-purpose area for team meetings, workout, etc; a small training/treatment room; an entry lobby and hospitality area; restrooms for men and women; and access to the waterfront. The total estimated cost is $6,500,000, with funding from a combination of private funds and Athletics Department capital funds.
40 Emergency Repairs, Renovations, and Equipment and Technology Acquisitions,
2012-13: This project involves the expenditure of $2,540,697 in FY 2013 Section 13 and New College Funds for emergency repairs to various campus facilities, academic and administrative offices, classroom and laboratory renovations, and equipment and technology acquisitions. These project funds will allow for the implementation of projects as needed in support of a number of capital projects throughout the course of the fiscal year.
41 Emergency Repairs, Academic and Administrative Renovations, and Equipment
and Technology Acquisitions, 2013-14: This project involves the expenditure of
May 9-10, 2013
14
$1,842,930 in FY 2014 Section 13 and New College Funds for emergency repairs to various campus facilities, academic and administrative offices, classroom and laboratory renovations, and equipment and technology acquisitions. These project funds will allow for the implementation of projects as needed in support of a number of capital projects throughout the course of the fiscal year.
III. HIGH PRIORITY PROJECTS, FUNDING NOT CURRENTLY AVAILABLE,
NORMAN CAMPUS 42 S. J. Sarkeys Complex Addition for Health and Exercise Science: This project will
consolidate Department of Health and Exercise Science faculty and students in one location with adequate space. The planned addition to the building will be sized to include approximately 19,550 gross square feet constructed to the south of the existing facility. The addition will provide new lab space, classrooms, and faculty offices, by expanding the existing basement and first floor. The project also includes modifications to the western façade that provides a new front entrance to the building off of Asp Avenue and ties the existing building into the new construction. The total estimated total project cost is $10,000,000.
43 Chemistry Building Renovation: As new facilities for the Department of Chemistry and
Biochemistry are constructed, spaces in existing facilities will be vacated and reprogrammed for other instructional and research uses. Renovation will be required to reconfigure space, upgrade building systems and improve accessibility. The estimated total project cost is approximately $10,000,000.
44 Repository of Art, Public Affairs and History Collections: This proposed new 15,000-
gross-square-foot facility would provide environmentally controlled warehouse space for storage of special arts and humanities collections. Possible building users would be the Carl Albert Center, Western History Collections, Gaylord College of Mass Communications and Journalism, Fred Jones Jr. Museum of Art and the Political Communications Center. The estimated total cost is $6,000,000.
45 Cate Center Residence Halls Window Replacement: New energy-efficient replacement
windows will be installed in Cate Center #2 and #3. In addition to providing energy cost savings, replacement of the windows will provide greater security and enhance the buildings’ appearance. The estimated total project cost is $800,000.
46 Biological Sciences Building: Many of the teaching and research facilities utilized by the
departments of Biology and Microbiology and Plant Biology, and the Oklahoma Biological Survey are outdated and insufficient to meet the needs of undergraduate teaching, research and current safety standards. In addition, the wide dispersal in multiple locations of the activities and faculty in the biological sciences is another significant impediment to accommodating dramatic growth in student numbers and the achievement of goals. The envisioned building would allow centralization of critical facilities and personnel. The plan would provide a new greenhouse and a superior learning environment for students including a new modern lecture hall, modernized research facilities, and open spaces for students, faculty and staff that will enhance opportunities for cross-disciplinary research collaborations and larger group projects. The estimated total project cost is $80,000,000.
47 Life Sciences Center, Phase II: This project will complete the program requirements
necessary to support the instructional and research activities of the Department of Chemistry and Biochemistry, and will ultimately consolidate and integrate the teaching
May 9-10, 2013
15
and student services programs with the research programs to be constructed as Phase I. Phase II will contain approximately 100,000 gross square feet and will provide the department with state-of-the-art teaching laboratories for General, Analytical, Physical, Biological, Quantitative and Organic chemistry; teaching laboratory support and chemical stock room meeting the current life-safety requirements for storage and handling of hazardous materials; student advising and student services areas including an Information Commons, group study spaces and computer lab; and a 150-seat seminar auditorium. The project will also construct a parking structure. The estimated total project cost is $50,000,000.
48 Armory Renovation: This project, with an estimated project cost of $12,000,000, will
renovate the current Armory building to provide much needed and up-to-date classroom space required to teach classes in military science. The project will also make needed code, life safety and accessibility improvements to the building and update the building’s mechanical and electrical systems.
49 Multi-Tenant Light Industrial Facilities, Phase I: This project will provide high bay light
industrial space and office space for University research programs and which may be leased to entities wishing to locate near other technology resources at the University Research Campus. This phase will construct two pods, containing a total of approximately 73,000 gross square feet of space. Planning will include defined areas for additional pods. Necessary infrastructure and parking areas associated with the new buildings will also need to be constructed as part of the project. The estimated total project cost is approximately $16,000,000.
50 Kessler Farm Interdisciplinary Field Laboratory: Dr. Ed Kessler has deeded to The
University of Oklahoma approximately 350 acres of land southwest of Norman to be used as a field research facility. There have been numerous meteorological experiments on the farm over past years. This project is planned to construct a field laboratory building that will provide for preparation of samples prior to bringing them back to the Norman Campus. Also included is a subsequent phase will create a class and meeting area and temporary living quarters to allow researchers to stay at the laboratory while collecting specimens or data. The estimated total project cost is approximately $3,000,000.
51 Central Theatrical Set and Costume Design Facility: This project, with an estimated
project cost of $2,000,000, will construct a facility on the Research Campus which will house a central theatrical set and costume design facility for use by the University’s School of Drama and the Weitzenhoffer Department of Musical Theater.
52 School of Art Facilities at Research Campus: This project will provide improved
facilities for the School of Art and will be located adjacent to the School’s existing Ceramics Studio and Kiln Facility located at the Research Campus. Programs and functions currently utilizing space in the Fred Jones Jr. Memorial Art Center, the Charles M. Russell Center and two World War II vintage buildings at the University Research Campus-North would be consolidated in the new facility. Containing approximately 32,000 square feet of space with an associated project cost of approximately $10,900,000, this new facility would provide space for the School’s sculpture programs, graduate student and faculty studio spaces, and laboratory and studio spaces for the photography program.
53 College of Continuing Education Office Building: A new facility is proposed to replace
old and out-of-date facilities currently in use by the College of Continuing Education. A new building, to be located near existing CCE facilities, would provide expanded
May 9-10, 2013
16
superior quality space to house the College’s programs. Approximately 150,000 gross square feet of flexible office space would provide areas for various program and administrative offices. Necessary infrastructure and a parking structure associated with the new building will also need to be constructed as part of the project. The estimated total project cost is approximately $32,000,000.
54 Fred Jones Art Center Renovation for the School of Art: This project will include
extensive renovation of interior spaces and the supporting mechanical, electrical, and computer and telecommunications systems necessary to modernize the art school facilities. In addition, the facility will be brought into compliance with current fire, life safety, and accessibility codes. Academic spaces for art instruction and other areas will be upgraded for current use and to meet current environmental isolation and health standards. Exterior repairs will be made to restore the building to good condition. The estimated project cost is $8,000,000.
55 University Research Campus-North Infrastructure Improvements: The establishment and
growth of the University Research Campus-North is dependent upon the development of an infrastructure foundation for the property. The University Research Campus-North is comprised of approximately 1,100 acres and organized into two basic elements: Swearingen Research Park and Max Westheimer Airport. This project involves the enhancement and addition to existing infrastructure systems on the east side of the property. Improvements include road construction and repair, street lighting and sidewalks, sewer mains, water distribution systems, storm water detention pond construction, perimeter and street landscaping, construction of primary entrances, and the demolition of several structures necessary to prepare sites for development. The estimated cost for these improvements totals $7,500,000.
May 9-10, 2013
17
PROJECT DESCRIPTIONS, OKLAHOMA CITY CAMPUS: The following pages contain additional information about each of the capital projects contained in the preceding Campus Master Plan of Capital Improvements Projects for the Oklahoma City Campus. I. HIGHEST PRIORITY PROJECTS FOR WHICH NEW STATE FUNDING IS
REQUESTED, OKLAHOMA CITY CAMPUS 1 Campus Fire Sprinkler Systems: This project involves the installation of fire sprinkler
systems across the OUHSC campus including the Biomedical Sciences Building, Library and College of Public Health Building. At the time of their completion, several buildings on campus were not required by code to have full fire protection systems. The project includes the design and installation of fire sprinkler systems and upgrades to fire pumps as necessary. The estimated total project cost is $2,000,000, with funding proposed from new State or bond funds.
2 Academic and Administrative Construction/Renovations: This project involves academic
and administrative construction and renovation projects campus wide. Projects include, flooring for the College Pharmacy building, expansion of College of Pharmacy academic and faculty space, and renovation to student facilities, classrooms, support facilities, and laboratories in various campus buildings. The estimated total project cost is $4,426,000 with funding proposed from new State, grant, Section 13 and New College Funds, and/or department or institutional funds.
3 Academic and Administrative Equipment: This project involves the purchase of
academic and administrative equipment, including instructional, research and clinical equipment as well as moveable interior furnishings. The equipment is necessary to support the teaching, research and service missions of the Health Sciences Center. Equipment will be purchased for the Colleges of Allied Health, Public Health, Dentistry, Medicine, Nursing, and Pharmacy; for the Stanton L. Young Biomedical Research Center and the Information Technology department. The estimated total project cost is $21,774,000 with funding proposed from State, grant, Section 13 and New College Funds, and/or department or institutional funds.
4 Campus ADA Improvements: This project involves the completion of Americans with
Disabilities Act improvements. The priorities established under Phases VI-VIII will be completed and include parking and building access, interior pathways, signage, and other improvements. This will involve all campus facilities. The estimated total project cost is $872,000, with funding proposed from new State or Section 13 and New College Funds.
II. PROJECTS IN PLANNING, DESIGN OR CONSTRUCTION, FUNDING
IDENTIFIED IN FULL OR IN PART, OKLAHOMA CITY CAMPUS 5 Peggy and Charles Stephenson Cancer Center: This project involves the construction of
the Peggy and Charles Stephenson Cancer Center for adults and a separate facility for children at a total project cost of $137,500,000. The seven-story, 213,000 gross square feet adult facility is complete. Minor construction and installation of the Proton Therapy Center equipment and other minor purchases will be necessary using project funds through the Fall of 2013. The facility houses multi-disciplinary clinics, infusion center, space for clinical trials, Radiation Oncology including the Proton Therapy Center with two vaults (one shelled), imaging and related ancillary diagnostic and treatment services,
May 9-10, 2013
18
patient education space, conference rooms, and building support spaces. The 24,600 gross square feet shelled space for the pediatric cancer facility at the OU Children’s Physicians Building is complete. Funding for the Peggy and Charles Stephenson Cancer Center includes bond proceeds supported by the State Tobacco Tax, State appropriations, 2005 OCIA Bond Issue and from private, University and/or other sources. The separately funded pediatric facility involves the use of State appropriated funds and departmental or other funds.
6 Harold Hamm Diabetes Center Renovation: This project involves renovation of the
Harold Hamm Diabetes Center. The building was purchased in 2008 and is in need of renovation to accommodate the Harold Hamm Diabetes Center clinics. Previous phases have been completed renovating 9,400 square feet of clinical space on the 1st and 2nd floors. Current plans will renovate 12,100 square feet on the 1st and 3rd floors and improve the North entrance walkways and driveway. Additional phases will be planned in coordination with needs. The estimated total project cost is $2,500,000 with funding from State and/or other funds.
7 Dentistry Curriculum Redesign & Patient Delivery System Facilities Remodel, Phases I,
II and III: This project involves renovation and reconfiguration of the clinical and administrative areas of the Dental Clinical Sciences Building to be completed in three phases. This is in response to new accreditation standards that support a substantial redesign of the pre-doctoral curriculum and correlated patient care delivery system in the College of Dentistry. The current pre-doctoral curriculum is compressed, inflexible, complex and poorly sequenced. In addition, the current mechanism for screening and assigning patients, treatment planning cases, and providing care is inefficient and cumbersome for patients, students and faculty. In order to address a significant number of these issues, a substantial renovation and reconfiguration of administrative and clinical space is required, along with the purchase and/or replacement of equipment and furniture. Furthermore, areas of the first floor will be renovated to create additional classrooms and student locker and gathering areas. Phase I will renovate the clinical and teaching areas of the third floor and create additional classrooms and student locker and gathering areas on the first floor for approximately $12,100,000; Phase II will renovate the clinical and teaching areas of the second and fourth floors for approximately $4,102,000; and Phase III will renovate the faculty and administrative areas of the fifth floor for approximately $4,574,000. The estimated total project cost is $20,776,000.
8 Peggy and Charles Stephenson Cancer Center Phase I Clinical Trials Expansion:
This project involves the renovation of approximately 5,200 gross square feet to create additional space for the Phase I Clinical Trials on the third floor of the Peggy and Charles Stephenson Cancer Center. The current space for the Phase I Clinical Trials area is already at full capacity and additional space is needed to allow continued growth in the number of trials supported by the Peggy and Charles Stephenson Cancer Center. The estimated total project cost is $1,128,000 with funding from institutional funds.
9 Basic Sciences Education Building Air Entrainment Project: This project will correct
deficiencies associated with exhaust stacks located on the roof of the Basic Sciences Education Building (BSEB). The exhaust stacks on the roof of the BSEB may not properly prevent reentry of the exhausted gases from chemical and biological hoods and other sources. An architectural and engineering study recommended modifications and options that are currently under review. The total cost is estimated not to exceed $1,000,000 with funding proposed from new State, grant, Section 13 and New College Funds, and/or department or institutional funds.
May 9-10, 2013
19
10 Rogers Building 5th Floor Remodel for IT Office Space: This project involves purchasing furniture and equipment to outfit the new office space on the 5th floor of the Rogers Building for Information Technology. Currently IT occupies office space in several locations across the campus. This project will address current space challenges and facilitate the consolidation of IT office space into a single location, fostering an improved collaborative environment to better serve the campus community. Specifically, this project brings IT Applications Services together with IT Operations, Engineering and Security. The estimated total project cost is $800,000.
11 Asset Preservation Improvements: This project involves deferred maintenance and
facility infrastructure improvements to protect the substantial capital assets of the Health Sciences Center. The project involves capital renewal in all major campus facilities, including subsystem repairs and replacements, upgrades to and/or replacement of existing elevators and air handlers, up-grade of fire alarm systems, replacement of the floor in the Stanton L. Young Biomedical Research Center North BSL3 lab, restroom remodels and upgrades, and containment and removal of asbestos. The estimated total cost is $15,232,000, with funding proposed from new State, bond, Section 13 and New College Funds, and/or institutional funds. A five year plan is being implemented to address high priority building improvements with Section 13 and New College Funds and institutional funds. This includes the use of $2,757,000 in previous years Section 13 and New College Funds.
12 Research Park Acquisition: This project is for the purchase of the Presbyterian
Health Foundation Research Park located west of Lincoln Boulevard between N.E. 8th Street and N.E. 4th Street. The purchase includes more than 700,000 square feet of modern biomedical research lab and office space supported by state-of-the-art communications and infrastructure systems. This transaction furthers the shared goal of the University and the Presbyterian Health Foundation to grow biomedical research in the State of Oklahoma to benefit healthcare across the State and nationwide. The University’s purchase of this property will establish a continuing affiliation dedicated to supporting biomedical research, enhancing the infrastructure available to support increasingly successful University research activities and will also support biomedical research companies in their efforts to commercialize new equipment and technologies. The estimated total project cost is $85,000,000, with funding from general obligation bonds and University funds.
III. HIGH PRIORITY PROJECTS, CURRENT FUNDING NOT AVAILABLE,
OKLAHOMA CITY CAMPUS 13 Renovation of East and West Lecture Halls in the BSEB: This project involves the
renovation of approximately 6,100 square feet of the East and West lecture halls at the Basic Sciences Education Building. The renovation of this space is required to be able to increase the medical school class size to 200 students per year. Work will include removing outdated and unnecessary projection booths, revising the ceiling, adding seating in the rear and front of each lecture hall and installing full fire sprinkler coverage in all areas involved in the renovation. Completion of this project will finalize the renovation of the Basic Sciences Education Building. The current estimated total project cost is $1,000,000 with funding proposed from State, grant, Section 13 and New College Funds, and/or department or institutional funds.
14 Public Health Auditorium Renovation: This project involves the renovation of 4,024
square feet of auditorium space in the College of Public Health Building. The 365 seat auditorium will provide state-of-the art distance education and audiovisual technical
May 9-10, 2013
20
capability to support symposia and town hall meetings as the largest auditorium on the University of Oklahoma Health Sciences Center campus. Renovation will include seating, carpeting and fixtures. The estimated total project cost is $1,700,000.
15 Operations Center: This project involves the construction of a 42,100 gross square feet
facility. The facility will house OUHSC Operations, Site Support and related shops, Motor Pool, and other offices. These departments will be relocated from the old Service Center Building. The estimated total project cost is $6,200,000.
16 East Parking Structure: This project involves the construction of a 750 space parking
structure on the east side of the campus. The parking garage is necessary given new construction and growth of the campus. The estimated total project cost is $12,000,000.
17 David L Boren Student Union 4th Floor Addition: This project involves the construction
of a fourth floor addition consisting of approximately 12,000 gross square feet at the David L. Boren Student Union. The fourth floor addition will be constructed to accommodate additional student service’s needs. The estimated total project cost is $3,000,000. The funding involves the use of bond proceeds supported by a student facility fee.
18 Biomedical Sciences Building Laboratory Modernization Project: This project involves
the renovation of approximately 30,000 square feet in the Biomedical Sciences Building. The renovations will eliminate inefficient 1970’s design and construction features, including single pane exterior glazing, perimeter racetrack hallways, and non-modular laboratory design. The project will improve the energy efficiency of the building and provide much needed additional renovated laboratory space with increased space and operational efficiencies. The estimated total project cost is $6,000,000.
19 College of Nursing Building Upgrades: This project involves purchasing equipment,
desks, chairs, and cabling for the College of Nursing Building. These updates are necessary to provide Nursing students with an up-to-date learning environment in order to properly prepare the students of today for the career of tomorrow. All distance education rooms, classrooms and multimedia rooms in the College of Nursing Building are in need of permanent projection screens, fixed furniture with adequate electrical connections to power laptops, mounted projectors connected to lectern podiums, distance education equipment, cameras, and codecs. The estimated total project cost is $12,000,000.
20 G. Rainey Williams Pavilion Renovation and Modernization: This project involves
the renovation of approximately 129,000 square feet of academic office space and expansion and modernization of restrooms in the G. Rainey Williams Pavilion due to the age and condition of the current facility. The estimated total project cost is $3,900,000.
May 9-10, 2013
21
PROJECT DESCRIPTIONS, TULSA CAMPUS: The following pages contain additional information about each of the capital projects contained in the preceding Campus Master Plan of Capital Improvements Projects for the University of Oklahoma - Tulsa Campus. I. HIGHEST PRIORITY PROJECTS FOR WHICH NEW STATE FUNDING IS
REQUESTED, TULSA CAMPUS 1 Academic and Administrative Renovations and Equipment: This project involves various
renovation projects and the purchase of equipment for the Schusterman Center. The project includes renovation for academic and administrative units, including the OU-Tulsa President’s Office, cafeteria remodeling, Innovations Commons, addition of a small kitchenette and for campus-wide Information Technology. Renovations and the acquisition of equipment will involve offices, research laboratories, and video technology. The estimated total cost is $2,405,000 in new State or other funds.
2 Campus Infrastructure Improvements: This project involves various physical plant
projects. They include replacement of 25 to 36-year-old, inefficient chillers that have reached their useful life expectancy. Additionally, the project includes replacement of the aging Uninterrupted Power Supply (UPS) that serves the network and telephone systems, roof replacement on several buildings, rebuilding of older PAUs (primary air units) in the main building, card key system upgrade, asbestos abatement, water pipe replacement, building pressurization and humidity control, covering switchyard and condition space, parking lots, replacing all windows in building 1 and carpet, replacing amplifiers and all smoke detectors and adding new ramps for ADA-compliancy. The estimated total cost is $7,511,000. Funding would be provided from bond issues or new State funds.
II. PROJECTS IN PLANNING, DESIGN OR CONSTRUCTION, FUNDING
IDENTIFIED IN FULL OR IN PART, TULSA CAMPUS 3 Wayman Tisdale Specialty Health Clinic: This project involves the construction of a
45,500 gross square feet building at an estimated total cost of $18,700,000. The clinic will be located in the North Tulsa area to expand medical care. The plan for the advanced outpatient health care facility will include urgent care, advanced MRI and CT services, and chemotherapy. The funding plan involves the use of $1,500,000 from 2006 SB 90XX, $2,875,000 from 2007 state legislation, $13,000,000 from private donations, $1,000,000 from an emergency medicine grant, and $325,000 in other funds.
4 Schusterman Center Clinic Outpatient Surgery Procedure Suite: This project involves an
interior remodel of approximately 3,000 square feet in the first floor of the Schusterman Center Clinic to create an outpatient surgery and endoscopy suite for minor outpatient surgical procedures. The estimated total project cost is $300,000 with funding from departmental funds.
5 OU Physicians Clinical Facilities: This project involves the renovation and
updating of clinical facilities and the furniture, fixtures, and equipment within these areas as needed from the wear of heavy patient traffic as well as clinical space usage being renovated due to a change in the clinical specialty needs. Clinical funds will be used to fund these projects as identified. The estimated total cost is $2,500,000 over 5 years.
May 9-10, 2013
22
III. HIGH PRIORITY PROJECTS, CURRENT FUNDING NOT AVAILABLE, TULSA CAMPUS
6 Digital Radiography (DR) Unit: This project would purchase and install a digital
radiograph with a PACS unit in laboratory space allotted to the Department of Medical Imaging and Radiation Sciences, Tulsa, to replace an outdated unit. The radiography faculty use diagnostic radiographic units and phantoms to teach basic physics, positioning and techniques to students. The current laboratory has an outdated single unit. This unit does not have digital capabilities. Digital imaging is a standard format in the clinical affiliates of the program. A digital unit for teaching is needed to allow students to transition from laboratory practice to affiliate clinical practicum easier and successfully. The College of Allied Health in Tulsa is requesting an up-to-date integrated digital radiography (DR) unit to replace the current out dated unit. No additional shielding is required. The estimated total project cost is $93,000.
7 Exterior Campus Enhancements: This project involves a pedestrian pathway, exterior
signage, repaving of the east parking lot, cooling tower screen, and a landscape garden. The pedestrian pathway will provide safety improvement for access between the main building, Learning Center, and Schusterman Library. The estimated total project cost is $1,500,000.
8 Simulation Center: This project involves the development of 10,000 gross square feet for
a Simulation Center. The Simulation Center will allow for a complete range of simulations in multiple settings, including standardized patients, human patient simulators, task trainers, computer-based and web-based instruction, Virtual Reality Trainers, and other simulated environments. This will involve an integrated computer and video management system to allow for data collection and analysis for the simulated learning experiences. The Center will be used to educate third and fourth-year medical students, Physician Assistant students, residents, and students in nursing and pharmacy. The estimated total project cost is $3,750,000.
9 Campus Parking Enhancements: This project involves street and parking improvements.
Additional on-street and surface parking around campus will be provided, as well as necessary sidewalks and improved signage. Campus landscape beautification projects including tree replacements and additional benches as well as streetscape enhancements will be undertaken. The estimated total cost is $400,000 with funding from Foundation funds.
10 Library Phase II: Following the completion of the OU-Tulsa Schusterman Center Library
construction project in 2011, and keeping with the OU-Tulsa Campus Plan, an anticipated 20,000 square foot expansion of the original building would include many key features that were scaled back or eliminated from Phase I planning. These features would include additional learning clusters and Commons space for students; an information literacy computer lab to keep pace with the library’s expanding educational role on campus; an educational technology center to help faculty and students more fully adopt and better utilize distance education technologies; additional collections space for non-traditional and historic materials; additional group study and student conference rooms; individual study carrels; office space for traveling faculty from Norman and Oklahoma City; improved writing center facilities; and a full-featured library café and reading nook. The estimated total cost is $7,575,000.
11 East Side Parking Facility: This project involves the construction of a parking structure
with up to 500 spaces adjacent to the Learning Center and Library. This project is
May 9-10, 2013
23
needed when all other new facilities, including the Library are completed. The estimated total project cost is $9,000,000.
BRR0161
Printed: 06-17-2013
LONG-RANGE CAPITAL PLANNING COMMISSIONAGENCY SUMMARY BY PRIORITY
Fiscal Years 2015 through 2019
FY - 2015 Budget Request Capital Outlay Summary, Pg. 1
1
2
3
4
5
6
7
8
9
10
11
12
Hester Hall Renov, College Int'l Studies
Fine Arts Ctr, Rupel Jones Theatre Renov
Classroom Renovation and Improvements
Radar Innovations Laboratory
Campus Bicycle/Pedestrian Paths
Physical Sciences Ctr Life SafetyImprov
Bizzell Memorial Library, LL1 Renovation
Research Campus Infrastructure
Research and Instructional Equipment
Information Technology Improvements
Asset Preservation Projects - Level III
Asset Preservation Projects - Level II
760-0201
760-0078
760-0230
760-0301
760-0255
760-0268
760-0317
760-0124
760-0012
760-0020
760-0140
760-0139
0
0
0
0
0
0
0
0
0
0
0
0
13,500,000
5,000,000
3,000,000
15,800,000
2,000,000
4,000,000
5,000,000
5,000,000
4,000,000
6,000,000
32,000,000
0
0
0
0
0
0
0
0
0
0
0
0
13,000,000
Agency: University of Oklahoma
Priority Name of Project: Proj. #FederalFunds
OtherFunds
StateApprop
TotalProject
13,500,000
5,000,000
3,000,000
15,800,000
2,000,000
4,000,000
5,000,000
5,000,000
4,000,000
6,000,000
32,000,000
13,000,000
760
BRR0161
Printed: 06-17-2013
LONG-RANGE CAPITAL PLANNING COMMISSIONAGENCY SUMMARY BY PRIORITY
Fiscal Years 2015 through 2019
FY - 2015 Budget Request Capital Outlay Summary, Pg. 2
13
14
15
16
17
18
19
20
21
22
23
24
25
Multi-Tenant Off Fac #4 at Res Campus
Multi-Tenant Off Fac #5 at Res Campus
Devon Energy Hall Clean Room
Crawford University Club Renovation
Scholars Walk/Asp Avenue Reconstruction
Arezzo, Monastero
Sarkeys Complex, Huffman Add/Locker Rms
Utility Plant #4
Catlett Music, Sharp Concert HallOrgan
Stephenson Life Sci, Protein ProdFac
Oklahoma Memorial Union Market
Oklahoma Memorial Union Technology Store
Acquisition of Property
760-0271
760-0304
760-0293
760-0305
760-0306
760-0308
760-0298
760-0251
760-0299
760-0324
760-0318
760-0319
760-0320
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
36,500,000
28,000,000
3,000,000
4,500,000
10,300,000
14,000,000
15,000,000
73,000,000
16,000,000
700,000
1,700,000
2,000,000
10,000,000
Agency: University of Oklahoma
Priority Name of Project: Proj. #FederalFunds
OtherFunds
StateApprop
TotalProject
36,500,000
28,000,000
3,000,000
4,500,000
10,300,000
14,000,000
15,000,000
73,000,000
16,000,000
700,000
1,700,000
2,000,000
10,000,000
760
BRR0161
Printed: 06-17-2013
LONG-RANGE CAPITAL PLANNING COMMISSIONAGENCY SUMMARY BY PRIORITY
Fiscal Years 2015 through 2019
FY - 2015 Budget Request Capital Outlay Summary, Pg. 3
26
27
28
29
30
31
32
33
34
35
36
37
38
Water Innovative Research Laboratory
Headington Hall Student Housing
Parking Expansion
Campus Streets and Drives
Max Westheimer Airport Improv
Wilkinson House/Wagner Dining Hall Renov
Jimmie Austin OU Golf Club Improvements
Coe Golf Learning Ctr & Team Practice
Gaylord Fam Okla Mem Stadium Impr, Ph VI
L. Dale Mitchell Baseball Park Exp & Imp
Softball Facility Expansion & Improv
McCasland Field House Renov & ImpPh III
Varsity Rowing Practice Center
760-0321
760-0278
760-0241
760-0289
760-0033
760-0322
760-0309
760-0239
760-0310
760-0256
760-0257
760-0273
760-0311
0
0
0
0
10,720,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15,000,000
75,000,000
5,000,000
9,500,000
2,680,000
14,000,000
6,000,000
4,000,000
9,000,000
4,000,000
4,000,000
5,200,000
6,500,000
Agency: University of Oklahoma
Priority Name of Project: Proj. #FederalFunds
OtherFunds
StateApprop
TotalProject
15,000,000
75,000,000
5,000,000
9,500,000
13,400,000
14,000,000
6,000,000
4,000,000
9,000,000
4,000,000
4,000,000
5,200,000
6,500,000
760
BRR0161
Printed: 06-17-2013
LONG-RANGE CAPITAL PLANNING COMMISSIONAGENCY SUMMARY BY PRIORITY
Fiscal Years 2015 through 2019
FY - 2015 Budget Request Capital Outlay Summary, Pg. 4
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Boat House
Emer Repair Renov Equip & Tech Acq 12-13
Emer Repair Renov Equip & Tech Acq 13-14
Sarkeys Complex, Health/Exercise Science
Chemistry Building Renovation
Repository of Collections
Cate Center Window Replacement
Biological Sciences Building
Life Sciences Center, Phase II
Armory Renovation
Multi-Tenant Light Industrial FacPh I
Kessler Farm Interdisciplinary Field Lab
Central Theatrical Set & Costume Design
School of Art Fac at Res Campus
760-0279
760-0312
760-0323
760-0302
760-0259
760-0303
760-0285
760-0292
760-0220
760-0270
760-0272
760-0249
760-0253
760-0236
0
0
0
0
0
0
0
0
0
0
0
2,950,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
6,500,000
2,540,697
1,842,930
10,000,000
10,000,000
6,000,000
800,000
80,000,000
50,000,000
12,000,000
16,000,000
50,000
2,000,000
10,900,000
Agency: University of Oklahoma
Priority Name of Project: Proj. #FederalFunds
OtherFunds
StateApprop
TotalProject
6,500,000
2,540,697
1,842,930
10,000,000
10,000,000
6,000,000
800,000
80,000,000
50,000,000
12,000,000
16,000,000
3,000,000
2,000,000
10,900,000
760
BRR0161
Printed: 06-17-2013
LONG-RANGE CAPITAL PLANNING COMMISSIONAGENCY SUMMARY BY PRIORITY
Fiscal Years 2015 through 2019
FY - 2015 Budget Request Capital Outlay Summary, Pg. 5
53
54
55
College of Continuing Education Off Bldg
Fred Jones Art Ctr Renov-School of Art
Univ Research Campus-No. Infrastructure
760-0222
760-0077
760-0032
0
0
0
0
0
0
32,000,000
8,000,000
7,500,000
Agency: University of Oklahoma
Priority Name of Project: Proj. #FederalFunds
OtherFunds
StateApprop
TotalProject
32,000,000
8,000,000
7,500,000
760
13,670,000 643,713,627 95,300,000 752,683,627Totals:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 74 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
729 Elm Ave
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
30
1
Renovation
This project will provide limited new construction and the total renovation of Hester Hall for the College of International Studies. The new construction will include an addition on the west façade ofthe three story element. This addition will become the front door of the College and house a two-story lobby, elevator and open stair. Two new stair towers will be constructed to improve building circulation and provide adequate emergency egress. The three story element of the building will be
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 75 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
renovated to house the Dean's office, staff offices and a quiet study area on the first floor, with faculty offices and small conference and seminar rooms on the second and third floors. The one-story element will house International Student Services and Education Abroad as well as three classrooms, a seminar room, a formal conference room and the college living room. This project also will update thelife safety, HVAC and electrical systems, renovate existing and add new restrooms, and improve accessibility. New windows will be installed and the existing brickwork will be tuckpointed to improve the appearance of the exterior.
Programs of the College of International Studies have been located in a variety of locations on the Norman Campus. Consolidation in one building will provide opportunities for collaborative efforts andmake these types of initiatives easier to implement. Consolidation will also provide for more effective administration of the College.
This project will provide renovated space to meet the needs of the newly created College of International Studies. For the first time, all international programming, including the International and Area Studies academic program, education abroad, and International Student Services will be housed under one roof. A major priority of the University is internationalization of the University's curriculum and other offerings with the goal of producing students with a keen understanding of other cultures and points of view, necessary to succeed in the global environment of the 21st century.
No
Yes
Part 1 of the project was funded in 2005 from $2,730,463 in State Bonds.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 76 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
Up-to-date equipment to be used for teaching will be available for use by students and faculty.
Educational programs will be adversely affected. If postponed, equipment and renovation will cost more due to inflation.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 77 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
11,200,000
11,200,000
8,600,000
700,000
1,900,000
11,200,000
2,300,000
2,300,000
500,000
1,700,000
100,000
2,300,000
0
0
0
0
13,500,000
0
0
0
0
0
0
0
0
13,500,000
1,200,000
10,300,000
2,000,000
13,500,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 78 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
New State funds requested
Construction Manager, GMP - 05/01/2013
41,571
247.77
10,300,046.67
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 79 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 80 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
Economical building systems should result in more economical operation of this space. There are no additional operating costs associated with this project.
N/A
N/A
The renovation work will provide construction jobs for an approximately 20-month period. Architectural and engineering consultants will be selected to provide planning and documentation for the project. Audio/visual equipment and other furnishings will be purchased for the project.
Michael K. Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 81 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 82 FY-2015 Budget Request
760 06-10-2013
760-0201 Hester Hall Renov, College Int'l Studies
1 4
0 0
4 12
2 6
3 9
3 6
5 10
2 4
51
44.35
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 41 FY-2015 Budget Request
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
563 Elm Avenue
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
30
2
Renovation
This project will include renovation of interior spaces and the supporting mechanical and electrical systems necessary for the continued use of the Rupel Jones Theatre. Stage rigging and flooring will be refurbished, lighting and audio equipment will be upgraded, and curtains replaced. In addition, theatre seating will be replaced and other patron facilities renovated.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 42 FY-2015 Budget Request
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
Making Rupel Jones Theatre safe and bringing this heavily used facility to a higher standard vis-a-vis competing university facilities will bring an importantant advantage for the Weitzenhoffer College of Fine Arts' recruiting, teaching, and performance quality.Theatrical systems will be upgraded to a more professional and safe condition, including wiring and lighting, audio systems, stage lift hydraulics, stage rigging and stage floor. ADA and other code compliance items such as restrooms and elevators will be addressed. When funding allows, theatre seating and other theatre and lobby comfort and aesthetic improvements, including flooring and finisheswill be undertaken.
No
No
Yes. Current theatre technologies will be implemented (audio, intelligent lighting).
Educational programs will be adversely affected. If postponed, equipment and renovation will cost more due to inflation.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 43 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
200,000
200,000
200,000
200,000
4,800,000
4,800,000
800,000
3,700,000
300,000
4,800,000
0
0
0
0
5,000,000
0
0
0
0
0
0
0
0
5,000,000
800,000
3,700,000
500,000
5,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 44 FY-2015 Budget Request
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
New State funds requested
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 45 FY-2015 Budget Request
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 46 FY-2015 Budget Request
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
There are no aditional operating costs associated with this project.
N/A
N/A
The renovation work will provide construction jobs for an approximate 12-month period. Architectural and engineering consultants will be selected to provide planning and documentation for the project. Equipment will be purchased for the project.
Michael K Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 47 FY-2015 Budget Request
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 48 FY-2015 Budget Request
760 06-10-2013
760-0078 Fine Arts Ctr, Rupel Jones Theatre Renov
0 0
0 0
4 12
2 6
3 9
0 0
5 10
3 6
43
37.39
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 99 FY-2015 Budget Request
760 06-10-2013
760-0230 Classroom Renovation and Improvements
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
20
3
Renovation
The University's Classroom Renovation Task Force has recommended implementation of basic minimum standards for classroom configuration in order to address overcrowding and inadequate seating, and to provide the technology necessary for a quality teaching and learning environment. An aggressive program is underway to bring the current 140 centrally scheduled classrooms, comprising over 140,000 net square feet of space, up to the basic standards. This project will provide funding for
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 100 FY-2015 Budget Request
760 06-10-2013
760-0230 Classroom Renovation and Improvements
renovations and instructional equipment in a number of classrooms identified as most critically in need of improvement.
This project will address overcrowding, inadequate seating, and provide the technology necessary for a quality teaching and learning environment. An aggressive program is necessary to bring the current 131centrally scheduled classrooms, comprising over 120,000 net square feet of space, up to the basic standards. This project will begin that process. This project will help a number of schools and departments achieve goals identified in the University's Strategy for Excellence.
n/a
Yes
Section 13 and New College Funds and other University funds have been utilized for classroom renovations over the past several years. The 2005 State Bond provided $2,500,000.
Up-to-date equipment to be used for teaching will be available for use by students and faculty.
Educational programs will be adversely affected. If postponed, equipment and renovation will cost more due to inflation.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 101 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0230 Classroom Renovation and Improvements
0
0
1,550,000
1,550,000
500,000
1,000,000
50,000
1,550,000
1,450,000
1,450,000
400,000
1,000,000
50,000
1,450,000
0
0
3,000,000
0
0
0
0
0
0
0
0
3,000,000
900,000
2,000,000
100,000
3,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 102 FY-2015 Budget Request
760 06-10-2013
760-0230 Classroom Renovation and Improvements
New State funds requested
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 103 FY-2015 Budget Request
760 06-10-2013
760-0230 Classroom Renovation and Improvements
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 104 FY-2015 Budget Request
760 06-10-2013
760-0230 Classroom Renovation and Improvements
New lighting systems should result in more economical operation of classrooms. There are no additional operating costs associated with this project.
N/A
N/A
Renovation will provide construction jobs for an approximate 24-month period. Movable and scientific equipment and furnishings will be purchased for the project.
Michael K. Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 105 FY-2015 Budget Request
760 06-10-2013
760-0230 Classroom Renovation and Improvements
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 106 FY-2015 Budget Request
760 06-10-2013
760-0230 Classroom Renovation and Improvements
2 8
0 0
5 15
1 3
3 9
3 6
5 10
4 8
59
51.30
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 291 FY-2015 Budget Request
760 06-10-2013
760-0301 Radar Innovations Laboratory
Proposed new facility at Research Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
50
4
New
The Radar Innovations Laboratory will be located on the University Research Campus south of One Partners Place and east of the National Weather Center. The approximately 36,000-gross-square-foot building will create open working space for research efforts pertaining to the design, assembly and testing of radar system components. The building will provide office space for 20 researchers and up to 60 graduate students, with supporting fabrication shops and test areas. Two anechoic chambers, one
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 292 FY-2015 Budget Request
760 06-10-2013
760-0301 Radar Innovations Laboratory
for low frequency research and one for high frequency research, will be installed within the test area.
The Radar Innovations Laboratory will serve as the core facility for OU's growing radar program. Currently, 16 faculty members and over 60 students make up this active research center, who are currently spread across campus in several buildings. Bringing this vibrant ground together will greatly enhance collaboration, education, and will take the program to the national level in terms of overall prominence.
No
No
Yes, radar development involves in-depth design, fabrication, and test of complex electronics. The Radar Innovations Laboratory will provide the facilities necessary for such development, including sophisticated anechoic chambers, micro fabrication room, and extensive microwave test areas.
Based on a foundation in weather radar, The University of Oklahoma's overall radar program is now expanding into other areas of radar, including defense, security, and intelligence. With this investment, the program is on the verge of becoming a dominant force on the national stage. The timing is perfect to build this facility, and any delay would stifle the progress, especially in terms
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 293 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0301 Radar Innovations Laboratory
of recruiting excellent faculty and keeping top students in Oklahoma.
15,800,000
15,800,000
12,500,000
1,700,000
1,600,000
15,800,000
0
0
0
0
0
0
15,800,000
0
0
0
0
0
0
0
0
15,800,000
1,700,000
12,500,000
1,600,000
15,800,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
What is the effect of delaying this project or maintenance schedule? (Criteria E)
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 294 FY-2015 Budget Request
760 06-10-2013
760-0301 Radar Innovations Laboratory
New State funds requested
Construction Manager, GMP - 05/01/13
36,092
335.25
12,099,843.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 295 FY-2015 Budget Request
760 06-10-2013
760-0301 Radar Innovations Laboratory
0
374996
374996
0
393764
393764
0
1253475
1253475
0
0
0
2022235
0
0
0
2022235
2022235
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 296 FY-2015 Budget Request
760 06-10-2013
760-0301 Radar Innovations Laboratory
The radar program currently has several industry collaborations with companies such as EEC, Lockheed Martin, Raytheon, Weathernews, and CGI. This role of the University has been a priority and was one of the main reasons to expand the program into all applications of radar. It is important to evolve Oklahoma's economy into high technology, and radar is an area where a good foundation has been build and the pay off is beginning to be realized.
In addition, approximately $12 million of construction work will provide construction jobs for an approximate 12-month period. Architectural and engineering consultants will be selected to provide planning and documentation for the project.
Michael K. Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 297 FY-2015 Budget Request
760 06-10-2013
760-0301 Radar Innovations Laboratory
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 298 FY-2015 Budget Request
760 06-10-2013
760-0301 Radar Innovations Laboratory
0 0
0 0
4 12
5 15
0 0
0 0
5 10
5 10
47
40.87
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 155 FY-2015 Budget Request
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
20
5
This project will provide funding of $2,000,000 for implementation of a bicycle/multimodal transportation system throughout campus. When fully developed, this system will interconnect the campus community and link with the City of Norman beyond.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 156 FY-2015 Budget Request
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
The safety of students, faculty/staff and visitors will be considerably enhanced by implementation of new bikeway facilities and programs which will decrease vehicle congestion and minimize conflicts between bicycles, pedistrians and vehicles. Pedestrian and bicycle travel will become easier, quicker and more convenient via a comprehensive set of non-motorized connections in and around the campus. Project should help to encourage walking and bicycling and curtail the need to construct new parking facilities. In addition, a healthier campus environment will result from improved air quality and a lowering of the overall level of noise.
No
Yes
University revenue bonds 2010, $580,000
No
Safety and health concerns associated with vehicle congestion will not be addressed.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 157 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
150,000
150,000
110,000
40,000
150,000
1,850,000
1,850,000
1,400,000
450,000
1,850,000
0
0
0
0
2,000,000
0
0
0
0
0
0
0
0
2,000,000
0
1,510,000
490,000
2,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 158 FY-2015 Budget Request
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
New State funds requested
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 159 FY-2015 Budget Request
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 160 FY-2015 Budget Request
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
NA
NA
NA
Approximately $1.5 million of work will provide construction jobs for an approximate 12-month period. Architectural and engineering consultants will be selected to provide planning and documentation for the project.
Michael K. Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 161 FY-2015 Budget Request
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 162 FY-2015 Budget Request
760 06-10-2013
760-0255 Campus Bicycle/Pedestrian Paths
2 8
0 0
3 9
2 6
4 12
4 8
5 10
0 0
53
46.09
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 187 FY-2015 Budget Request
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
601 Elm Avenue
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
25
6
Renovation
This project will include fire sprinkler and alarms systems, emergency lighting, and other life safetyimprovements in several areas of the Physical Sciences Center.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 188 FY-2015 Budget Request
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
The safety of students, faculty/staff and visitors to campus is paramount and will be addressed by lifesafety improvements in this high-rise building located in the central campus area.
Yes. Current Life Safety Code would require a building of this type to be fully sprinkled.
Yes
University revenue bond funds in the approximately amount of $240,000 were expended for fire sprinkler,fire alarm and emergency lighting in a portion of the building renovated in 2011/2012.
Yes. Advanced technology will for voice emergency notification in the building.
The high-rise building will remain unsprinkled.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 189 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
0
0
100,000
100,000
100,000
100,000
3,900,000
3,900,000
3,200,000
700,000
3,900,000
0
0
4,000,000
0
0
0
0
0
0
0
0
4,000,000
0
3,200,000
800,000
4,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 190 FY-2015 Budget Request
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
New State funds requested
University staff - 05/01/13
182,963
17.49
3,200,022.87
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 191 FY-2015 Budget Request
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 192 FY-2015 Budget Request
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
NA
NA
NA
Approximately $3.2 million of renovation work will provide construction jobs for an approximate 10-month period. Architectural and engineering consultants will be selected to provide planning and documentation for the project.
Michael K. Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 193 FY-2015 Budget Request
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 194 FY-2015 Budget Request
760 06-10-2013
760-0268 Physical Sciences Ctr Life Safety Improv
2 8
3 12
4 12
1 3
4 12
3 6
5 10
2 4
67
58.26
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 379 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
401 W. Brooks Street
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
25
7
Renovation
This project involves a complete renovation and modernization of approximately 20,000 gross square feet on the Lower Level 1 of the 1983 Neustadt Wing addition. Seating capacity in the space will increase from 224 to approximately 525. The design includes creation of a variety of individual and group study areas including seminar space, group meeting areas, digital humanities laboratory, video creation lab and faculty research areas. The existing Bookmark Café will be renovated and expanded.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 380 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
Restrooms on the floor will also be remodeled and made ADA compliant.
The project will modify the building in order to support collaborative student learning spaces, and creation of an innovative classroom and flexible work space areas. This initial renovation project will be the first step in modernizing the facility and its technology to make it more suitable for use by students and faculty.
The space to be renovated in LL1 currently provides 225 seats for student use. The reconfigured space, while gaining far greater flexibility, will provide support for about 400-425 students. More important than significantly increasing the number of seats, the project extends the ability of the library to support new learning modalities, namely student group and collaborative work. Additional benefit include: Community meeting room which can support lectures, symposia, etc., and thereby extend the Library's ability to engage our community as a part of being the "intellectual commons" of the university; digital scholarship lab which supports new cross-disciplinary work in the humanities and social sciences; and video conferencing capabilities to support collaboration with remote participants or groups.
No
Yes
A fire protection project totaling $4.7 million was completed in Bizzell Library in 2008.
Yes, the project will incorporate the latest in data, fiber and audio-video technologies for lecture rooms, group and individual study areas and for researchers. The 21st Century research library must
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 381 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
support a wide spectrum of rapidly advancing technologies. The LL1 renovation is designed to begin toaddress the gap we experience today. The project advances the University Libraries ability to supportthe following:Improvements in current technology infrastructure (basic infrastructure);Collaborative group work equipmentDigital humanities laboratory developmentVisualization of geographical information systemsAudio recording roomsCollaborative classroomsVideo conferencing
Delaying ths project would compound the shortage of reader and study space in Bizzell. The facility experiences full utilization during the period prior to final examinations. Delaying the project would cause a loss of much needed momentum to promote the long-term vision to modernize the entire Library system at the University of Oklahoma.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 382 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
5,000,000
5,000,000
3,000,000
1,300,000
700,000
5,000,000
0
0
0
0
0
0
5,000,000
0
0
0
0
0
0
0
0
5,000,000
1,300,000
3,000,000
700,000
5,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 383 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
New State funds requested
Project Architects - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 384 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 385 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
N/A
N/A
N/A
The renovation work will provide construction jobs for an approximate 8-month period. Architectural and engineering consultants will provide planning and documentation for the project. Equipment and furnishings will be purchased for the project.
Michael K Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 386 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 387 FY-2015 Budget Request
760 06-12-2013
760-0317 Bizzell Memorial Library, LL1 Renovation
0 0
0 0
4 12
2 6
3 9
4 8
5 10
5 10
55
47.83
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 49 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
University Research Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
30
8
New
The University's efforts to develop the Research Campus continues. Some of the remaining infrastructure is in poor condition, and in many instances has been out of use for an extended period of time. The Master Plan for the area is being updated and will be implemented as new building projects are identified. The infrastructure improvements include utilities; site clearing; construction of roads, drives and parking; and information technology systems expansion.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 50 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
This project will allow critically needed research and teaching space to be constructed. Students and faculty will benefit from a much improved environment for learning and research that is being created at the University Research campus. Economic growth will be continue to be stimulated by development ofprivate and public facilities.
No
Yes
Approximately $20.5 million has been expended on University Research Campus infrastructure improvementsin Fiscal Years 2003 to 2011. Funding for this work was provided from University of Oklahoma sources including revenue bond funds, from a $1.25 million federal grant from the Economic Development Administration, and from 2005 State Bond funds. Additional infrastructure development also has been undertaken in order to connect newly constructed facilities with existing infrastructure systems.
Yes. Vital new facilities have recently been completed or are under construction at the Research Campus. The National Weather Ctr houses federal NOAA research programs as well as the University's meteorological research programs. The Stephenson Research & Technology Ctr has been designed to be a catalyst and showcase for modern cross-disciplinary research. Occupants of the building include OU's world-class faculty and program in gene sequencing and in functional genomics and the Okla Super Computer for Education and Research. Two facilities were recently completed, and a third is under construction, creating space leased to a private firms, e.g., one that utilizes and develops sophisticated weather information/analyses systems. The Stephenson Life Sciences Research Ctr is currently under construction. To support this growth, it is necessary that infrastructure be planned and constructed to provide utilities, roads, parking and telecommunications for the new facilities.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 51 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
Development of the University Research Campus, which has been jump started by initial construction of the National Weather Center, the Stephenson Research and Technology Center and the Multi-tenant OfficeFacilities, will be delayed. It is extremely important that the momentum of this early development bemaintained in order to attract new technologies and economic enterprises to the state.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
What is the effect of delaying this project or maintenance schedule? (Criteria E)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 52 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0124 Research Campus Infrastructure
0
0
0
0
2,500,000
2,500,000
2,250,000
250,000
2,500,000
2,500,000
2,500,000
2,250,000
250,000
2,500,000
5,000,000
0
0
0
0
0
0
0
0
5,000,000
0
4,500,000
500,000
5,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 53 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
New State funds requested
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 54 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 55 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
N/A
N/A
New businesses located at the University Research Park should have a positive impact on state tax revenue.
The combination of technological advances from expanded public and private research and the associatedopportunities for employment, in conjunction with an increase in the number of graduates from high quality University programs, will enhance economic development within the State. A number of construction contracts will provide associated construction jobs. Engineering consultants will provide planning and documentation for the infrastructure projects.
Michael K Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 56 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 57 FY-2015 Budget Request
760 06-10-2013
760-0124 Research Campus Infrastructure
3 12
0 0
4 12
5 15
3 9
4 8
5 10
5 10
76
66.09
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 1 FY-2015 Budget Request
760 06-10-2013
760-0012 Research and Instructional Equipment
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
10
9
Funds are to be used to purchase new equipment for teaching and research programs. Purchases are needed to replace, modernize and augment equipment used in classroom and laboratory instruction and inresearch programs. Part of the equipment will be used to support the teaching and research activitiesof newly hired faculty including some who will occupy endowed chairs.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 2 FY-2015 Budget Request
760 06-10-2013
760-0012 Research and Instructional Equipment
This project will replace, modernize and augment equipment used in classroom and laboratory instructionand in research programs. This equipment will help a number of schools and departments achieve goals identified in the University's Strategy for Excellence.
No
Yes
Section 13 and New College Funds in an annual amount of $300,000 or more have been allocated in severalrecent years for research and instructional equipment.
Up-to-date equipment to be used for teaching and research will be available for use by students and faculty.
Educational programs will be adversely affected. If postponed, equipment will cost more due to inflation.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 3 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0012 Research and Instructional Equipment
0
0
0
0
0
0
4,000,000
4,000,000
4,000,000
4,000,000
4,000,000
0
0
0
0
0
0
0
0
4,000,000
4,000,000
0
0
4,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 4 FY-2015 Budget Request
760 06-10-2013
760-0012 Research and Instructional Equipment
New State funds requested
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 5 FY-2015 Budget Request
760 06-10-2013
760-0012 Research and Instructional Equipment
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 6 FY-2015 Budget Request
760 06-10-2013
760-0012 Research and Instructional Equipment
N/A
N/A
N/A
N/A
Michael K Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 7 FY-2015 Budget Request
760 06-10-2013
760-0012 Research and Instructional Equipment
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 8 FY-2015 Budget Request
760 06-10-2013
760-0012 Research and Instructional Equipment
2 8
0 0
3 9
0 0
3 9
3 6
5 10
4 8
50
43.48
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 9 FY-2015 Budget Request
760 06-10-2013
760-0020 Information Technology Improvements
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
10
10
A number of information technology improvements are needed to address data protection needs at the Norman campus. This project would modernize network security infrastructure by providing high performance firewalls, intrusion prevention systems, network access management, mobile device encryption, compliance management, and secure code analysis enabling the University to manage the riskof data loss and misuse of University resources.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 10 FY-2015 Budget Request
760 06-10-2013
760-0020 Information Technology Improvements
This project will help to accomplish one of the key goals identified by the University. It is necessaryto keep computer services and capabilities up to date to meet the academic and research requirements ofthe University. It is also neccessary to secure the University's data resources, including student andemployee personal data.
No
No
Project increases the technological capabilities of The University of Oklahoma enabling further securenetwork and wireless connection of computing resources and sharing of computer generated data. Equipment and systems will be purchased promoting private-sector development of advanced telecommunications and computing technologies.
Needed computer equipment and software will not be available to meet the academic and research needs of the University. Inflation will cause project costs to increase.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 11 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0020 Information Technology Improvements
0
0
0
0
0
0
6,000,000
6,000,000
6,000,000
6,000,000
6,000,000
0
0
0
0
0
0
0
0
6,000,000
6,000,000
0
0
6,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 12 FY-2015 Budget Request
760 06-10-2013
760-0020 Information Technology Improvements
New State funds requested
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 13 FY-2015 Budget Request
760 06-10-2013
760-0020 Information Technology Improvements
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 14 FY-2015 Budget Request
760 06-10-2013
760-0020 Information Technology Improvements
N/A
N/A
N/A
Computer equipment will be purchased from vendors.
Michael K Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 15 FY-2015 Budget Request
760 06-10-2013
760-0020 Information Technology Improvements
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 16 FY-2015 Budget Request
760 06-10-2013
760-0020 Information Technology Improvements
2 8
0 0
3 9
0 0
2 6
0 0
5 10
5 10
43
37.39
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 66 FY-2015 Budget Request
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Appropriated
30
11
Renovation
Capital requirements for the preservation of the University's facilities and infrastructure have been listed and categorized, including estimates of project costs. The work included in this group of asset preservation projects has been identified as Level III (i.e., condition will allow some further delay, however its delay will result in increased maintenance and operations costs). The projects include deferred maintenance projects, energy conservation work, new and upgraded elevators, lighting
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 67 FY-2015 Budget Request
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
upgrades, roof repair and replacement projects, accessibility improvements, and utility upgrades.
Life safety, accessibility for disabled individuals, and user comfort (including enhanced lighting) will be addressed through implementation of this project.
Life safety code and ADA accessibility issues will be addressed.
No
Delay will result in increased maintenance and operations costs.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 68 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
0
0
0
0
0
0
32,000,000
32,000,000
9,500,000
20,850,000
1,650,000
32,000,000
32,000,000
0
0
0
0
0
0
0
0
32,000,000
9,500,000
20,850,000
1,650,000
32,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 69 FY-2015 Budget Request
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
New State funds requested
University staff and engineering consultant - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 70 FY-2015 Budget Request
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
a. Please give a dollar estimate of the annual operational savings generated by or increasesrequired by this project for the next five years.
Type of DollarSavings
State Dollars:
Federal Dollars:
Other Dollars:
Total:
Net Total:
FY - 2015 FY - 2016
FY - 2017 2018
2019 & Total
Type of Dollar
Increases
State Dollars:
Federal Dollars:
Ohter Dollars:
Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 71 FY-2015 Budget Request
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
N/A
N/A
N/A
Contracts and purchase orders will be awarded for purchase and installation of equipment. Engineeringconsultants will be selected to provide project documentation.
Michael K Moorman 4053256006
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Fiscal Impact: (Criteria A)
b. Explain changes in operating costs and number of state employees as a result of funding this project.
c. Will the agency be able to fund operating costs and employee increases without additional state
d. Explain the impact on state tax revenue or fee revenue, if any.
Detail the private sector economic impact or job creation for the area location of the project and/or the State. Specify both temporary jobs (e.g. Construction) and permanent jobs. Show how estimates were obtained.
Contact person: Contact phone number:
appropriations?
(Criteria D)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 72 FY-2015 Budget Request
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Additional comments:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 73 FY-2015 Budget Request
760 06-11-2013
760-0140 Asset Preservation Projects - Level III
3 12
0 0
2 6
1 3
3 9
0 0
5 10
0 0
40
34.78
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Criteria/Rating ScaleScoreRange
Score A
Weight B
Total(A*B)
A. Overall fiscal impact/cost effectiveness 0 - 05 4
B. Legal obligation and mandates/addresses public
health/safety
0 - 05 4
C. Impact on service to the public 0 - 05 3
D. Economic impact/job creation -02 - 05 3
E. Urgency of maintenance needs/addresses public
health/safety
0 - 05 3
F. Whether prior phases have been funded or
partially funded
0 - 05 2
G. Departmental priority 01 - 05 2
H. Impact on the use of technology -02 - 05 2
Total Rating Points
Total Percentage Points (Total Rating Pts/115*100)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 58 FY-2015 Budget Request
760 06-11-2013
760-0139 Asset Preservation Projects - Level II
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
30
12
Renovation
Capital requirements for the preservation of the University's facilities and infrastructure have been listed and categorized, including estimates of project costs. The work included in this group of asset preservation projects has been identified as Level II (i.e., condition will allow for only a short delay) and is critical in order for University departments to carry out their mission. The projects include deferred maintenance projects, roof repair and replacement projects, new and upgraded
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 59 FY-2015 Budget Request
760 06-11-2013
760-0139 Asset Preservation Projects - Level II
elevators, accessibility improvements, and utility upgrades.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 60 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0139 Asset Preservation Projects - Level II
5,400,000
5,400,000
4,000,000
1,000,000
400,000
5,400,000
5300000
5,300,000
1,000,000
4,000,000
300,000
5,300,000
2,300,000
2,300,000
600,000
1,600,000
100,000
2,300,000
0
0
0
0
0
13,000,000
0
0
0
0
0
13,000,000
2,600,000
9,600,000
800,000
13,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 61 FY-2015 Budget Request
760 06-11-2013
760-0139 Asset Preservation Projects - Level II
Revolving funds and University revenue bond funds
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 203 FY-2015 Budget Request
760 06-10-2013
760-0271 Multi-Tenant Off Fac #4 at Res Campus
301 David L. Boren Blvd
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
50
13
New
This project will provide approximately 79,975 square feet of space, including general office space for University research programs and which may be leased to entities wishing to locate near other technology resources at the Research Campus. Also included in the new facility will be a Data Center which will consolidate the University's high performance and mission critical computing assets into a dedicated and secure facility. The new Data Center is intended to house the equipment for the OU
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 204 FY-2015 Budget Request
760 06-10-2013
760-0271 Multi-Tenant Off Fac #4 at Res Campus
Supercomputing Center for Education & Research (OSCER), Department of Physics and Astronomy high energy physics research, and Information Technology's Network Operations Center. Necessary infrastructure and parking areas associated with the new building will also need to be constructed as part of the project.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 205 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0271 Multi-Tenant Off Fac #4 at Res Campus
36,500,000
36,500,000
29,500,000
1,200,000
5,800,000
36,500,000
0
0
0
0
0
0
0
0
0
0
0
36,500,000
0
0
0
36,500,000
1,200,000
29,500,000
5,800,000
36,500,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 206 FY-2015 Budget Request
760 06-10-2013
760-0271 Multi-Tenant Off Fac #4 at Res Campus
University revenue bond funds
Actual construction contract - 05/01/13
79,975
368.86
29,499,578.50
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 315 FY-2015 Budget Request
760 06-10-2013
760-0304 Multi-Tenant Off Fac #5 at Res Campus
University Research Campus, proposed new facility
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
14
New
This new four-story building will provide approximately 100,000 square feet of space, including general office space for University research programs and space which may be leased to entities wishing to locate at the Research Campus. Necessary infrastructure associated with the new building will also need to be constructed as part of the project.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 317 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0304 Multi-Tenant Off Fac #5 at Res Campus
23,000,000
23,000,000
20,000,000
3,000,000
23,000,000
5,000,000
5,000,000
100,000
4,000,000
900,000
5,000,000
0
0
0
0
0
0
0
0
0
28,000,000
0
0
0
28,000,000
100,000
24,000,000
3,900,000
28,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 318 FY-2015 Budget Request
760 06-10-2013
760-0304 Multi-Tenant Off Fac #5 at Res Campus
University revenue bond funds
Construction Manager, GMP - 05/01/13
108,937
220.31
23,999,910.47
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 267 FY-2015 Budget Request
760 06-10-2013
760-0293 Devon Energy Hall Clean Room
110 W. Boyd Street
Norman
Statewide
44
16
3
8
Pending
50
15
Renovation
This project will modify space in Devon Energy Hall for research that can be conducted only in a highly clean environment. A clean room facility, operated as a University-wide shared resource, will provide capabilities that currently do not exist on campus. The availability of such a facility will substantially enhance opportunities for future research grant funding.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 269 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0293 Devon Energy Hall Clean Room
3,000,000
3,000,000
2,500,000
200,000
300,000
3,000,000
0
0
0
0
0
0
0
0
0
0
0
3,000,000
0
0
0
3,000,000
200,000
2,500,000
300,000
3,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 270 FY-2015 Budget Request
760 06-10-2013
760-0293 Devon Energy Hall Clean Room
University revenue bond funds
Actual construction contract - 05/10/13
3,000
833.33
2,499,990.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 323 FY-2015 Budget Request
760 06-10-2013
760-0305 Crawford University Club Renovation
900 Asp Avenue
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
30
16
Renovation
This project will completely renovate the existing University Club space to make it more efficient, toprovide additional and improved kitchen space permitting a larger variety of foods to be prepared and served to patrons, and to make significant improvements to the aesthetic design of the space. As a part of the project, public restrooms serving the club which are located off the adjacent public corridor will be renovated, as will the public corridor. Additionally, the Frontier Room, the
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 324 FY-2015 Budget Request
760 06-10-2013
760-0305 Crawford University Club Renovation
Weitzenhoffer Room and the Heritage Room located across the corridor to the west of the club will be refurbished as a part of the project.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 325 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0305 Crawford University Club Renovation
500,000
1,500,000
2,500,000
4,500,000
2,800,000
1,000,000
700,000
4,500,000
0
0
0
0
0
0
0
0
0
0
500,000
1,500,000
2,500,000
0
0
4,500,000
1,000,000
2,800,000
700,000
4,500,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 326 FY-2015 Budget Request
760 06-10-2013
760-0305 Crawford University Club Renovation
University revenue bond ($1,500,000), private funds ($500,000), Section 13/NC ($2,500,000)
Construction Manager, GMP - 05/01/13
10,000
280.00
2,800,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 331 FY-2015 Budget Request
760 06-11-2013
760-0306 Scholars Walk/Asp Avenue Reconstruction
Main Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
25
17
This project will reconstruct VanVleet Oval into a pedestrian mall north from Lindsey Street to tie into the Brooks Pedestrian Mall. The new mall, to be called Scholars Walk, will feature plaques recognizing the most outstanding honors received by the University's graduates. The first two statueshonoring the University's most prominent faculty will also be included in this project. In addition, Asp Avenue between Brooks Mall and Lindsey Street will also be reconstructed to become a two-way
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 332 FY-2015 Budget Request
760 06-11-2013
760-0306 Scholars Walk/Asp Avenue Reconstruction
street with on-street bus loading, staging, and parking as well as a cul-de-sac near Brooks Mall for aturn-around. To accommodate the anticipated improvements in these areas, it will be necessary to relocate the bus staging and transfer area from Asp Avenue and Brooks Street to a new location. Also,a portion of the Botany-Microbiology greenhouse facility will be demolished and the facility will be reconfigured.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 333 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0306 Scholars Walk/Asp Avenue Reconstruction
500,000
7,050,000
2,750,000
10,300,000
8,800,000
100,000
1,400,000
10,300,000
0
0
0
0
0
0
0
0
0
0
500,000
7,050,000
2,750,000
0
0
10,300,000
100,000
8,800,000
1,400,000
10,300,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 334 FY-2015 Budget Request
760 06-11-2013
760-0306 Scholars Walk/Asp Avenue Reconstruction
Private funds ($500,000), University revenue bond funds ($7,050,000), Section 13/NC funds ($2,750,000)
Project Construction Manager - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 339 FY-2015 Budget Request
760 06-12-2013
760-0308 Arezzo, Monastero
Via di San Domenico 78
Arezzo, Italy
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
18
Renovation
This project involves the extensive renovation of a former monastery in Arezzo, Italy, to create dormitory space for approximately 50 students in combinations of single and double occupancy rooms with bath facilities. The approximately 30,000-gross-square-foot building will also include three classrooms, a library, a dining facility and small kitchen. In addition, a faculty-in-residence apartment and limited administrative space will be created. The project will provide complete utility
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 340 FY-2015 Budget Request
760 06-12-2013
760-0308 Arezzo, Monastero
infrastructure including life safety systems. The exterior of the building will be restored and a newlandscaped garden area will be created.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 341 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0308 Arezzo, Monastero
2,650,500
1,549,500
4,200,000
3,200,000
1,000,000
4,200,000
6,500,000
6,500,000
700,000
4,800,000
1,000,000
6,500,000
3,300,000
3,300,000
800,000
1,700,000
800,000
3,300,000
0
0
0
0
0
0
2,650,500
0
0
0
11,349,500
14,000,000
1,500,000
9,700,000
2,800,000
14,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 342 FY-2015 Budget Request
760 06-12-2013
760-0308 Arezzo, Monastero
Private funds ($2,650,500), other University sources ($11,349,500)
University staff - 05/01/13
34,000
285.29
9,699,860.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 275 FY-2015 Budget Request
760 06-12-2013
760-0298 Sarkeys Complex, Huffman Add/Locker Rms
1401 Asp Avenue
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
30
19
Addition
This project involves an approximately 20,000-gross-square-foot addition at Huston Huffman Center for expansion of the general recreation and exercise space in the facility. In addition, the existing men's and women's locker rooms would be renovated and modernized.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 277 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0298 Sarkeys Complex, Huffman Add/Locker Rms
100,000
100,000
100,000
100,000
4,900,000
8,800,000
13,700,000
700,000
11,000,000
2,000,000
13,700,000
1,200,000
1,200,000
400,000
300,000
500,000
1,200,000
0
0
0
0
0
0
0
5,000,000
0
0
10,000,000
15,000,000
1,100,000
11,300,000
2,600,000
15,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 278 FY-2015 Budget Request
760 06-12-2013
760-0298 Sarkeys Complex, Huffman Add/Locker Rms
University revenue bond funds ($5,000,000), other University funds ($10,000,000)
University staff and Construction Manager - 05/01/13
20,000
565.00
11,300,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 139 FY-2015 Budget Request
760 06-10-2013
760-0251 Utility Plant #4
1330 Jenkins Avenue
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
50
20
New
This new utility plant is intended to augment the existing Chilled Water Plants 1 and 2. With the rapid growth of the campus, the existing plants are nearing full capacity and can no longer be expanded due to site and piping limitations. The new plant was originally identified as a need in the1997 Norman Campus Utilities Master Plan. The plant will be centrally located just north of the Huston Huffman Center, and will provide chilled water, steam and electricity for expanding campus
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 140 FY-2015 Budget Request
760 06-10-2013
760-0251 Utility Plant #4
facilities.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 141 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0251 Utility Plant #4
72,250,000
750,000
73,000,000
67,250,000
50,000
5,700,000
73,000,000
0
0
0
0
0
0
0
0
0
0
0
72,250,000
0
0
750,000
73,000,000
50,000
67,250,000
5,700,000
73,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 142 FY-2015 Budget Request
760 06-10-2013
760-0251 Utility Plant #4
University bond funds ($72,250,000) and utility infrastructure assessement on other construction projects ($750,000)
Actual construction contract - 05/01/13
40,000
1,656.25
66,250,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 283 FY-2015 Budget Request
760 06-11-2013
760-0299 Catlett Music, Sharp Concert Hall Organ
500 W. Boyd Street
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
21
Addition
This project involves expansion of the Paul F. Sharp Concert Hall and associated renovations needed toallow for the installation of the University's Moller organ.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 285 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0299 Catlett Music, Sharp Concert Hall Organ
200,000
200,000
200,000
200,000
10,000,000
10,000,000
8,000,000
2,000,000
10,000,000
5,800,000
5,800,000
300,000
4,000,000
1,500,000
5,800,000
0
0
0
0
0
0
16,000,000
0
0
0
0
16,000,000
300,000
12,000,000
3,700,000
16,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 286 FY-2015 Budget Request
760 06-11-2013
760-0299 Catlett Music, Sharp Concert Hall Organ
Private funds
University staff and project architects - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 436 FY-2015 Budget Request
760 06-11-2013
760-0324 Stephenson Life Sci, Protein Prod Fac
101 Stephenson Parkway
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
30
22
Renovation
The project includes reconfiguration of a two-module laboratory area in the Stephenson Life Sciences Research Center, on the second floor adjacent to the Macromolecular X-ray and Crystallization Laboratory, creating a Protein Production Core Facility. The renovation for this new facility is associated with a National Institutes of Health grant received to establish a Center of Biomedical Research Excellence in Structural Biology. The reconfiguration will result in a secure stand-alone
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 437 FY-2015 Budget Request
760 06-11-2013
760-0324 Stephenson Life Sci, Protein Prod Fac
laboratory with central hallway access. An equipment alcove will be created with additional wall and floor space for laboratory equipment. Also, a number of modifications to existing lab modules adjacent to the PPCF and in other building locations will be made to accommodate the new faculty hiredin association with a NIH grant and to relocate the displaced research groups.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 438 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0324 Stephenson Life Sci, Protein Prod Fac
700,000
700,000
550,000
25,000
125,000
700,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
700,000
700,000
25,000
550,000
125,000
700,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 439 FY-2015 Budget Request
760 06-11-2013
760-0324 Stephenson Life Sci, Protein Prod Fac
Grant funds ($220,000), VP for Research funds ($480,000)
Construction Manager, GMP - 05/01/13
4,030
136.47
549,974.10
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 388 FY-2015 Budget Request
760 06-11-2013
760-0318 Oklahoma Memorial Union Market
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
15
23
Renovation
This project involves renovation of the space formerly occupied by Wendy's to create a modern food services market, providing popular healthy meal, snack and beverage choices.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 390 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0318 Oklahoma Memorial Union Market
1,700,000
1,700,000
1,300,000
200,000
200,000
1,700,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1,700,000
1,700,000
200,000
1,300,000
200,000
1,700,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 391 FY-2015 Budget Request
760 06-11-2013
760-0318 Oklahoma Memorial Union Market
Food Services funds
University staff - 05/01/2013
4,000
325.00
1,300,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 396 FY-2015 Budget Request
760 06-12-2013
760-0319 Oklahoma Memorial Union Technology Store
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
15
24
Renovation
This project involves renovation of the space formerly occupied by the Union bookstore to create areasfor computer and electronic device sales, accessory sales, support and service for devices. The project will include a training room for workshops and one-on-one training as well as open demonstration space to showcase innovative new technology for students and faculty.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 398 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0319 Oklahoma Memorial Union Technology Store
2,000,000
2,000,000
1,100,000
450,000
450,000
2,000,000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2,000,000
2,000,000
450,000
1,100,000
450,000
2,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 399 FY-2015 Budget Request
760 06-12-2013
760-0319 Oklahoma Memorial Union Technology Store
Discretionary University resources
Construction Manager, GMP - 05/01/2013
5,264
208.97
1,100,018.08
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 404 FY-2015 Budget Request
760 06-11-2013
760-0320 Acquisition of Property
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
25
The project will allow the University to facilitate the strategic and desirable acquisitions of real property as deemed necessary to support the mission of the University.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 406 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0320 Acquisition of Property
7,200,000
7,200,000
7,200,000
7,200,000
2,800,000
2,800,000
2,800,000
2,800,000
0
0
0
0
0
0
0
0
0
7,200,000
0
0
2,800,000
10,000,000
0
0
10,000,000
10,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 407 FY-2015 Budget Request
760 06-11-2013
760-0320 Acquisition of Property
University revenue bonds ($7,200,000); other discretionary University funds ($2,800,000)
University staff - 05/01/2013
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 412 FY-2015 Budget Request
760 06-11-2013
760-0321 Water Innovative Research Laboratory
University Research Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
26
New
The proposed new facility will serve as a visible front door to the University's water-related education, research and outreach programs, will showcase water conservation and expand community and global awareness. It will operate as center for collaborative investigative research, provide water-related public services and provide both student and public hands-on education and training. It is anticipated that the building may include offices, laboratories, laboratory support, a water quality
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 413 FY-2015 Budget Request
760 06-11-2013
760-0321 Water Innovative Research Laboratory
testing facility, an active learning classroom, demonstration watershed, display and visualization technology, video-conferencing capabilities, and public learning spaces.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 414 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0321 Water Innovative Research Laboratory
800,000
800,000
200,000
600,000
800,000
14,200,000
14,200,000
1,700,000
11,500,000
1,000,000
14,200,000
0
0
0
0
0
0
0
0
0
14,200,000
0
0
800,000
15,000,000
1,700,000
11,700,000
1,600,000
15,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 415 FY-2015 Budget Request
760 06-11-2013
760-0321 Water Innovative Research Laboratory
University staff - 05/01/2013
40,000
292.50
11,700,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 227 FY-2015 Budget Request
760 06-11-2013
760-0278 Headington Hall Student Housing
100 East Lindsey
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
50
27
New
The proposed new facilities will house students and student athletes in a combination of two- and four-bed units totaling approximately 380 beds. The building is planned to be a mid-rise structure, with central dining, laundry facilities, computer labs, study rooms, and other support facilities on the ground floor. The project will also include a Faculty-In-Residence apartment.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 229 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0278 Headington Hall Student Housing
27,085,000
40,000,000
7,915,000
75,000,000
53,500,000
5,000,000
16,500,000
75,000,000
0
0
0
0
0
0
0
0
0
0
27,085,000
40,000,000
0
0
7,915,000
75,000,000
5,000,000
53,500,000
16,500,000
75,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 230 FY-2015 Budget Request
760 06-11-2013
760-0278 Headington Hall Student Housing
Private funds ($27,085,000), University revenue bond funds ($40,000,000), Athletics funds ($7,915,000)
Construction Manager lump sum contract - 05/01/13
232,000
230.60
53,499,200.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 123 FY-2015 Budget Request
760 06-11-2013
760-0241 Parking Expansion
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
15
28
This project provides ongoing funding for a number of parking lot projects and includes demolition, site preparation and lot construction.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 125 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0241 Parking Expansion
1,000,000
1,000,000
800,000
200,000
1,000,000
1,000,000
1,000,000
2,000,000
1,700,000
300,000
2,000,000
2,000,000
2,000,000
1,600,000
400,000
2,000,000
0
0
0
0
0
0
0
3,000,000
0
0
2,000,000
5,000,000
0
4,100,000
900,000
5,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 126 FY-2015 Budget Request
760 06-11-2013
760-0241 Parking Expansion
University parking auxiliary revenues ($2,000,000), and University bond funds ($3,000,000)
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 251 FY-2015 Budget Request
760 06-11-2013
760-0289 Campus Streets and Drives
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
15
29
This project provides for the repair and resurfacing of a variety of campus streets, drives, parking areas and other paved surfaces in need of refurbishment.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 253 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0289 Campus Streets and Drives
3,000,000
3,000,000
2,500,000
500,000
3,000,000
3,500,000
3,500,000
2,920,000
580,000
3,500,000
3,000,000
3,000,000
2,500,000
500,000
3,000,000
0
0
0
0
0
0
0
9,500,000
0
0
0
9,500,000
0
7,920,000
1,580,000
9,500,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 254 FY-2015 Budget Request
760 06-11-2013
760-0289 Campus Streets and Drives
University revenue bond funds
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 25 FY-2015 Budget Request
760 06-11-2013
760-0033 Max Westheimer Airport Improv
1700 Lexington Avenue
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
25
30
This project provides for a variety of improvements to the Max Westheimer Airport that will be required to support its continued maintenance and development. The anticipated work includes the following: (1) construct and light new (west) taxiway; (2) rehabilitate any and all airport pavementsto include runways, taxiways, taxi-lanes, aprons and ramp areas (3) construct new air traffic control tower; (4) upgrade security camera system; (5) infrastructure development for north and/or south
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 26 FY-2015 Budget Request
760 06-11-2013
760-0033 Max Westheimer Airport Improv
airport property; (6) update the airport master plan; (7) update the airport layout drawing; (8) expand Terminal Building parking; (9) reconstruct fuel lane and taxi lane adjacent to South Ramp; (10)improve drainage, (11) install/replace runway/taxiway lights and signs as necessary; and (12) other improvements and repairs.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 27 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0033 Max Westheimer Airport Improv
3,200,000
800,000
4,000,000
3,100,000
500,000
400,000
4,000,000
2,400,000
600,000
3,000,000
300,000
2,300,000
400,000
3,000,000
2,400,000
600,000
3,000,000
300,000
2,300,000
400,000
3,000,000
2,720,000
680,000
3,400,000
300,000
2,250,000
850,000
3,400,000
0
0
10,720,000
0
0
0
0
0
2,680,000
13,400,000
1,400,000
9,950,000
2,050,000
13,400,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 28 FY-2015 Budget Request
760 06-11-2013
760-0033 Max Westheimer Airport Improv
Federal Aviation Administration and Oklahoma Aeronautics Commission grants with matching University auxiliary funds (5-20%)
University staff and Airport Engineers - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 420 FY-2015 Budget Request
760 06-11-2013
760-0322 Wilkinson House/Wagner Dining Hall Renov
1225 S. Jenkins Ave
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
25
31
Renovation
A study has been undertaken to assess the viability of repurposing these two buildings for other functions upon the relocation of student housing and dining to Headington Hall. The Athletic AcademicServices program is proposed to be relocated from the second floor of the Gaylord Family-Oklahoma Memorial Stadium into Bud Wilkinson House. The existing 29,650 square foot building would be expandedto approximately 42,000 square feet to accommodate the program's current and future academic needs.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 421 FY-2015 Budget Request
760 06-11-2013
760-0322 Wilkinson House/Wagner Dining Hall Renov
The facility would also feature a central stairway and elevator, new façade, and upgrades to restroomsand mechanical and electrical systems. Wagner Dining Hall is proposed to be renovated into a banquet facility for use by the University O-Club and would also serve as a central study hall for student athletes. The remodel would include new interior finishes in the dining area, new equipment designed for catered events in the kitchen, new restrooms, and new mechanical and electrical systems.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 422 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0322 Wilkinson House/Wagner Dining Hall Renov
700,000
700,000
500,000
200,000
700,000
10,300,000
10,300,000
1,000,000
8,000,000
1,300,000
10,300,000
3,000,000
3,000,000
500,000
1,800,000
700,000
3,000,000
0
0
0
0
0
0
0
0
0
0
14,000,000
14,000,000
1,500,000
10,300,000
2,200,000
14,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 423 FY-2015 Budget Request
760 06-11-2013
760-0322 Wilkinson House/Wagner Dining Hall Renov
Athletics Department funds
University staff and architectural consultant - 05/01/2013
37,000
278.38
10,300,060.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 347 FY-2015 Budget Request
760 06-11-2013
760-0309 Jimmie Austin OU Golf Club Improvements
1 Par Drive
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
32
New
This project provides a variety of improvements for the Jimmie Austin Golf Course. Improvements include a relocated maintenance facility, new clubhouse, residential cottages and various course and practice area renovations. Also included are much needed projects to upgrade the irrigation system infrastructure and to repair erosion problems in Bishop Creek and adjoining holes. The project will bedeveloped incrementally over an extended time period.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 349 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0309 Jimmie Austin OU Golf Club Improvements
1,000,000
2,800,000
3,800,000
3,000,000
200,000
600,000
3,800,000
1,000,000
1,200,000
2,200,000
200,000
1,800,000
200,000
2,200,000
0
0
0
0
0
0
0
0
2,000,000
4,000,000
0
0
0
6,000,000
400,000
4,800,000
800,000
6,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 350 FY-2015 Budget Request
760 06-11-2013
760-0309 Jimmie Austin OU Golf Club Improvements
University revenue bond ($4,000,000), private funds ($2,000,000)
Project architects and University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 115 FY-2015 Budget Request
760 06-11-2013
760-0239 Coe Golf Learning Ctr & Team Practice
4 Par Drive
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
25
33
Renovation
The Athletic Department has identified various team support areas that are needed at the Charlie Coe Golf Learning Center. The improvements include additional equipment storage and workout areas as wellas improvement of the practice area.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 117 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0239 Coe Golf Learning Ctr & Team Practice
2,500,000
2,500,000
2,000,000
100,000
400,000
2,500,000
1,500,000
1,500,000
100,000
1,000,000
400,000
1,500,000
0
0
0
0
0
0
0
0
4,000,000
0
0
0
0
4,000,000
200,000
3,000,000
800,000
4,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 118 FY-2015 Budget Request
760 06-11-2013
760-0239 Coe Golf Learning Ctr & Team Practice
Private funds to be raised and/or other Athletic Department funds
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 355 FY-2015 Budget Request
760 06-11-2013
760-0310 Gaylord Fam Okla Mem Stadium Impr, Ph VI
180 W. Brooks
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
50
34
Renovation
This project will include continued renovations to the west mezzanine and refurbishment of the east side suites, the Santee Lounge and the Kerr McGee Stadium Club. Also included are maintenance, repairs, and improvements to the east stadium structure.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 357 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0310 Gaylord Fam Okla Mem Stadium Impr, Ph VI
9,000,000
9,000,000
5,600,000
1,250,000
2,150,000
9,000,000
0
0
0
0
0
0
0
0
0
0
9,000,000
0
0
0
0
9,000,000
1,250,000
5,600,000
2,150,000
9,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 358 FY-2015 Budget Request
760 06-11-2013
760-0310 Gaylord Fam Okla Mem Stadium Impr, Ph VI
Private funds
Construction Manager, Lump Sum Price - 05/01/13
15,500
361.29
5,599,995.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 163 FY-2015 Budget Request
760 06-11-2013
760-0256 L. Dale Mitchell Baseball Park Exp & Imp
401 West Imhoff Road
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
30
35
Renovation
The Athletic Department has reviewed and identified the need for updates and improvements to spectatorseating, fan amenities, and team facilities at L. Dale Mitchell Baseball Park.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 165 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0256 L. Dale Mitchell Baseball Park Exp & Imp
1,750,000
1,750,000
1,250,000
200,000
300,000
1,750,000
0
0
1,000,000
1,250,000
2,250,000
200,000
1,650,000
400,000
2,250,000
0
0
0
0
0
0
2,750,000
0
0
0
1,250,000
4,000,000
400,000
2,900,000
700,000
4,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 166 FY-2015 Budget Request
760 06-11-2013
760-0256 L. Dale Mitchell Baseball Park Exp & Imp
Private funds and Athletics Department funds
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 171 FY-2015 Budget Request
760 06-11-2013
760-0257 Softball Facility Expansion & Improv
2500 South Jenkins Ave
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
30
36
Renovation
The Athletic Department has reviewed and identified the need for updates and improvements to spectatorseating, fan amenities, team facilities, and parking expansion and other site improvements at the Softball Facility.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 173 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0257 Softball Facility Expansion & Improv
1,000,000
3,000,000
4,000,000
3,300,000
300,000
400,000
4,000,000
0
0
0
0
0
0
0
0
0
0
1,000,000
0
0
0
3,000,000
4,000,000
300,000
3,300,000
400,000
4,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 174 FY-2015 Budget Request
760 06-11-2013
760-0257 Softball Facility Expansion & Improv
Private funds and Athletics Department funds
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 219 FY-2015 Budget Request
760 06-11-2013
760-0273 McCasland Field House Renov & Imp Ph III
151 W. Brooks
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
30
37
Renovation
The primary elements of this phase of the project are modifications for improved energy efficiency, including window and skylight replacement, and for improved accessibility, including walks and paving around the building's exterior; structural repairs; roof replacement; and masonry restoration.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 221 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0273 McCasland Field House Renov & Imp Ph III
5,200,000
5,200,000
4,100,000
50,000
1,050,000
5,200,000
0
0
0
0
0
0
0
0
0
0
5,200,000
0
0
0
0
5,200,000
50,000
4,100,000
1,050,000
5,200,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 222 FY-2015 Budget Request
760 06-11-2013
760-0273 McCasland Field House Renov & Imp Ph III
Private funds
Actual construction contract - 05/01/13
53,770
76.25
4,099,962.50
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 363 FY-2015 Budget Request
760 06-12-2013
760-0311 Varsity Rowing Practice Center
500 G.T. Blankship Blvd
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
50
38
New
Plans call for construction of an approximately 24,000-square-foot building to provide space to house indoor practice facilities for the women's intercollegiate rowing team and to consolidate various Athletics Department storage needs. The rowing team facilities will include a rowing tank, team room and meeting spaces, a workout area, lockers/showers, and storage and laundry areas.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 365 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0311 Varsity Rowing Practice Center
1,500,000
5,000,000
6,500,000
4,900,000
500,000
1,100,000
6,500,000
0
0
0
0
0
0
0
0
0
0
1,500,000
0
0
0
5,000,000
6,500,000
500,000
4,900,000
1,100,000
6,500,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 366 FY-2015 Budget Request
760 06-12-2013
760-0311 Varsity Rowing Practice Center
Athletics Department funds and private gifts
Construction contract awarded - 05/01/13
22,000
222.73
4,900,060.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 235 FY-2015 Budget Request
760 06-11-2013
760-0279 Boat House
Proposed New Facility on the Oklahoma River
Oklahoma City
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
39
New
The proposed new boathouse will be located in Oklahoma City near other existing and future facilities on the Oklahoma River. The facility will include space for storage of shells, oars, ergometers, and other equipment; a changing/locker area with showers; a multi-purpose area for team meetings, workout,etc; a small training/treatment room; an entry lobby and hospitality area; restrooms for men and women; and access to the waterfront.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 237 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-11-2013
760-0279 Boat House
1,400,000
1,400,000
1,000,000
400,000
1,400,000
1,600,000
3,500,000
5,100,000
500,000
3,800,000
800,000
5,100,000
0
0
0
0
0
0
0
0
3,000,000
0
0
0
3,500,000
6,500,000
500,000
4,800,000
1,200,000
6,500,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 238 FY-2015 Budget Request
760 06-11-2013
760-0279 Boat House
Private funds ($3,000,000), and Athletics Department funds ($3,500,000)
Project architect and University staff - 05/01/13
16,000
300.00
4,800,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 371 FY-2015 Budget Request
760 06-10-2013
760-0312 Emer Repair Renov Equip & Tech Acq 12-13
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
15
40
Renovation
This project involves the expenditure of $2,540,697 in FY 2013 Section 13 and New College Funds for emergency repairs to various campus facilities, academic and administrative offices, classroom and laboratory renovations, and equipment and technology acquisitions. These project funds will allow forthe implementation of projects as needed in support of a number of capital projects throughout the course of the fiscal year.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 373 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0312 Emer Repair Renov Equip & Tech Acq 12-13
2,540,697
2,540,697
1,290,697
1,250,000
2,540,697
0
0
0
0
0
0
0
0
0
0
0
0
2,540,697
0
0
2,540,697
1,250,000
1,290,697
0
2,540,697
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 374 FY-2015 Budget Request
760 06-10-2013
760-0312 Emer Repair Renov Equip & Tech Acq 12-13
FY13 Section 13 and New College Funds
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 428 FY-2015 Budget Request
760 06-12-2013
760-0323 Emer Repair Renov Equip & Tech Acq 13-14
Norman Campus
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
10
41
Renovation
This project involves the expenditure of $1,842,930 in FY 2014 Section 13 and New College Funds for emergency repairs to various campus facilities, academic and administrative offices, classroom and laboratory renovations, and equipment and technology acquisitions. These project funds will allow forthe implementation of projects as needed in support of a number of capital projects throughout the course of the fiscal year.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 430 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0323 Emer Repair Renov Equip & Tech Acq 13-14
1,842,930
1,842,930
842,930
1,000,000
1,842,930
0
0
0
0
0
0
0
0
0
0
0
0
1,842,930
0
0
1,842,930
1,000,000
842,930
0
1,842,930
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 431 FY-2015 Budget Request
760 06-12-2013
760-0323 Emer Repair Renov Equip & Tech Acq 13-14
FY 14 Section 13 and New College Funds
University staff - 05/01/2013
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 299 FY-2015 Budget Request
760 06-12-2013
760-0302 Sarkeys Complex, Health/Exercise Science
1401 Asp Avenue
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
42
Addition
This project will consolidate Department of Health and Exercise Science faculty and students in one location with adequate space. The planned addition to the building will be sized to include approximately 19,550 gross square feet constructed to the south of the existing facility. The additionwill provide new lab space, classrooms, and faculty offices, by expanding the existing basement and first floor. The project also includes modifications to the western façade that provides a new front
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 300 FY-2015 Budget Request
760 06-12-2013
760-0302 Sarkeys Complex, Health/Exercise Science
entrance to the building off of Asp Avenue and ties the existing building into the new construction.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 301 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0302 Sarkeys Complex, Health/Exercise Science
100,000
100,000
100,000
100,000
9,900,000
9,900,000
700,000
7,500,000
1,700,000
9,900,000
0
0
0
0
0
0
0
0
0
0
0
0
10,000,000
10,000,000
700,000
7,500,000
1,800,000
10,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 302 FY-2015 Budget Request
760 06-12-2013
760-0302 Sarkeys Complex, Health/Exercise Science
Funds to be determined
Consultant and University staff - 05/01/13
20,000
375.00
7,500,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 179 FY-2015 Budget Request
760 06-12-2013
760-0259 Chemistry Building Renovation
620 Parrington Oval
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
25
43
Renovation
As new facilities for the Department of Chemistry and Biochemistry are constructed, spaces in existingfacilities will be vacated and reprogrammed for other instructional and research uses. Renovation will be required to reconfigure space, upgrade building systems and improve accessibility.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 181 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0259 Chemistry Building Renovation
0
0
0
0
200,000
200,000
200,000
200,000
9,800,000
9,800,000
1,000,000
7,300,000
1,500,000
9,800,000
0
0
0
0
0
0
0
0
10,000,000
10,000,000
1,000,000
7,300,000
1,700,000
10,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 182 FY-2015 Budget Request
760 06-12-2013
760-0259 Chemistry Building Renovation
Source of funds is to be identified
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 307 FY-2015 Budget Request
760 06-10-2013
760-0303 Repository of Collections
Proposed new facility
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
44
New
This proposed new 15,000-gross-square-foot facility would provide environmentally controlled warehousespace for storage of special arts and humanities collections. Possible building users would be the Carl Albert Center, Western History Collections, Gaylord College of Mass Communications and Journalism, Fred Jones Jr. Museum of Art and the Political Communications Center.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 309 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0303 Repository of Collections
0
0
50,000
50,000
50,000
50,000
5,950,000
5,950,000
200,000
4,000,000
1,750,000
5,950,000
0
0
0
0
0
0
0
0
0
0
6,000,000
6,000,000
200,000
4,000,000
1,800,000
6,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 310 FY-2015 Budget Request
760 06-10-2013
760-0303 Repository of Collections
Source of funds to be determined
University staff - 05/01/13
15,000
266.67
4,000,050.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 243 FY-2015 Budget Request
760 06-12-2013
760-0285 Cate Center Window Replacement
316-330 Cate Center Drive
Norman
Statewide
44
16
4
8
Pending
Self Funded
25
45
Renovation
New energy-efficient replacement windows will be installed in Cate Center #2 and #3. In addition to providing energy cost savings, replacement of the windows will provide greater security and enhance the buildings' appearance.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 245 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0285 Cate Center Window Replacement
0
0
800,000
800,000
650,000
150,000
800,000
0
0
0
0
0
0
0
0
0
0
0
0
800,000
800,000
0
650,000
150,000
800,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 246 FY-2015 Budget Request
760 06-12-2013
760-0285 Cate Center Window Replacement
Source of funds is to be identified
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 259 FY-2015 Budget Request
760 06-10-2013
760-0292 Biological Sciences Building
Proposed new facility
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
46
New
Many of the teaching and research facilities utilized by the departments of Biology and Microbiology and Plant Biology, and the Oklahoma Biological Survey are outdated and insufficient to meet the needs of undergraduate teaching, research and current safety standards. In addition, the wide dispersal in multiple locations of the activities and faculty in the biological sciences is another significant impediment to accommodating dramatic growth in student numbers and the achievement of goals. The
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 260 FY-2015 Budget Request
760 06-10-2013
760-0292 Biological Sciences Building
envisioned building would allow centralization of critical facilities and personnel. The plan would provide a new greenhouse and a superior learning environment for students including a new modern lecture hall, modernized research facilities, and open spaces for students, faculty and staff that will enhance opportunities for cross-disciplinary research collaborations and larger group projects.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 261 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0292 Biological Sciences Building
0
0
0
0
0
0
80,000,000
80,000,000
5,000,000
56,000,000
19,000,000
80,000,000
0
0
0
0
0
0
0
0
80,000,000
80,000,000
5,000,000
56,000,000
19,000,000
80,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 262 FY-2015 Budget Request
760 06-10-2013
760-0292 Biological Sciences Building
Source of funds is to be identified
University staff - 05/01/13
112,000
500.00
56,000,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 83 FY-2015 Budget Request
760 06-10-2013
760-0220 Life Sciences Center, Phase II
University Research Campus, proposed new facility
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
47
New
This project will complete the program requirements necessary to support the instructional and research activities of the Department of Chemistry and Biochemistry, and will ultimately consolidate and integrate the teaching and student services programs with the research programs to be constructed as Phase I. Phase II will contain approximately 100,000 gross square feet and will provide the department with state-of-the-art teaching laboratories for General, Analytical, Physical, Biological,
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 84 FY-2015 Budget Request
760 06-10-2013
760-0220 Life Sciences Center, Phase II
Quantitative and Organic chemistry; teaching laboratory support and chemical stock room meeting the current life-safety requirements for storage and handling of hazardous materials; student advising andstudent services areas including an Information Commons, group study spaces and computer lab; and a 150-seat seminar auditorium. The project will also construct a parking structure.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 85 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0220 Life Sciences Center, Phase II
0
0
0
0
0
0
50,000,000
50,000,000
3,000,000
36,000,000
11,000,000
50,000,000
0
0
0
0
0
0
0
0
50,000,000
50,000,000
3,000,000
36,000,000
11,000,000
50,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 86 FY-2015 Budget Request
760 06-10-2013
760-0220 Life Sciences Center, Phase II
Source of funds is to be identified
Project architect - 05/01/13
100,000
360.00
36,000,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 195 FY-2015 Budget Request
760 06-12-2013
760-0270 Armory Renovation
290 West Brooks Street
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
25
48
Renovation
This project will renovate the current Armory building to provide much needed and up-to-date classroomspace required to teach classes in military science. The project will also make needed code, life safety and accessibility improvements to the building and update the building's mechanical and electrical systems.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 197 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0270 Armory Renovation
0
0
0
0
50,000
50,000
50,000
50,000
11,950,000
11,950,000
20,000
9,000,000
2,930,000
11,950,000
0
0
0
0
0
0
0
0
12,000,000
12,000,000
20,000
9,000,000
2,980,000
12,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 198 FY-2015 Budget Request
760 06-12-2013
760-0270 Armory Renovation
Source of funds is to be identified
Feasibility study by on-call architectural consultant - 05/01/13
39,000
230.76
8,999,640.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 211 FY-2015 Budget Request
760 06-10-2013
760-0272 Multi-Tenant Light Industrial Fac Ph I
University Research Campus, proposed new facility
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
49
New
This project will provide high bay light industrial space and office space for University research programs and which may be leased to entities wishing to locate near other technology resources at the University Research Campus. This phase will construct two pods, containing a total of approximately 73,000 gross square feet of space. Planning will include defined areas for additional pods. Necessary infrastructure and parking areas associated with the new buildings will also need to be
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 212 FY-2015 Budget Request
760 06-10-2013
760-0272 Multi-Tenant Light Industrial Fac Ph I
constructed as part of the project.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 213 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0272 Multi-Tenant Light Industrial Fac Ph I
0
0
200,000
200,000
200,000
200,000
2,800,000
2,800,000
300,000
2,000,000
500,000
2,800,000
13,000,000
13,000,000
300,000
10,800,000
1,900,000
13,000,000
0
0
0
0
0
0
0
0
16,000,000
16,000,000
600,000
12,800,000
2,600,000
16,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 214 FY-2015 Budget Request
760 06-10-2013
760-0272 Multi-Tenant Light Industrial Fac Ph I
Source of funds is to be identified
Feasibility study by architect and University staff - 05/01/13
73,000
175.34
12,799,820.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 131 FY-2015 Budget Request
760 06-10-2013
760-0249 Kessler Farm Interdisciplinary Field Lab
18388 190th Street
Purcell
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
50
New
Dr. Ed Kessler has deeded to The University of Oklahoma approximately 350 acres of land southwest of Norman to be used as a field research facility. There have been numerous meteorological experiments on the farm over past years. This project is planned to construct a field laboratory building that will provide for preparation of samples prior to bringing them back to the Norman Campus. Also included is a subsequent phase will create a class and meeting area and temporary living quarters to
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 132 FY-2015 Budget Request
760 06-10-2013
760-0249 Kessler Farm Interdisciplinary Field Lab
allow researchers to stay at the laboratory while collecting specimens or data.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 133 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0249 Kessler Farm Interdisciplinary Field Lab
50,000
50,000
50,000
50,000
1,550,000
1,550,000
200,000
1,100,000
250,000
1,550,000
1,400,000
1,400,000
150,000
1,050,000
200,000
1,400,000
0
0
0
0
2,950,000
0
0
0
0
0
50,000
3,000,000
350,000
2,150,000
500,000
3,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 134 FY-2015 Budget Request
760 06-10-2013
760-0249 Kessler Farm Interdisciplinary Field Lab
National Science Foundation and other research grants
Project architect - 05/01/13
7,600
230.26
1,749,976.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 147 FY-2015 Budget Request
760 06-12-2013
760-0253 Central Theatrical Set & Costume Design
University Research Campus, proposed new facility
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
51
New
This project will construct a facility on the Research Campus which will house a central theatrical set and costume design facility for use by the University's School of Drama and the Weitzenhoffer Department of Musical Theater.
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 149 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0253 Central Theatrical Set & Costume Design
0
0
0
0
0
0
2,000,000
2,000,000
200,000
1,500,000
300,000
2,000,000
0
0
0
0
0
0
0
0
2,000,000
2,000,000
200,000
1,500,000
300,000
2,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 150 FY-2015 Budget Request
760 06-12-2013
760-0253 Central Theatrical Set & Costume Design
Source of funds is to be determined
University staff - 05/01/13
8,500
176.47
1,499,995.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 107 FY-2015 Budget Request
760 06-12-2013
760-0236 School of Art Fac at Res Campus
University Research Campus, proposed new facility
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
52
New
This project will provide improved facilities for the School of Art and will be located adjacent to the School's existing Ceramics Studio and Kiln Facility located at the Research Campus. Programs andfunctions currently utilizing space in the Fred Jones Jr. Memorial Art Center, the Charles M. Russell Center and two World War II vintage buildings at the University Research Campus-North would be consolidated in the new facility. Containing approximately 32,000 square feet of space, this new
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 108 FY-2015 Budget Request
760 06-12-2013
760-0236 School of Art Fac at Res Campus
facility would provide space for the School's sculpture programs, graduate student and faculty studio spaces, and laboratory and studio spaces for the photography program.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 109 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0236 School of Art Fac at Res Campus
0
0
0
0
0
0
10,900,000
10,900,000
1,500,000
8,200,000
1,200,000
10,900,000
0
0
0
0
10,900,000
0
0
0
0
10,900,000
1,500,000
8,200,000
1,200,000
10,900,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 110 FY-2015 Budget Request
760 06-12-2013
760-0236 School of Art Fac at Res Campus
Private funds to be raised
University staff - 05/01/13
32,000
256.25
8,200,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 91 FY-2015 Budget Request
760 06-12-2013
760-0222 College of Continuing Education Off Bldg
Norman Campus, proposed new building
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
50
53
New
A new facility is proposed to replace old and out-of-date facilities currently in use by the College of Continuing Education. A new building, to be located near existing CCE facilities, would provide expanded superior quality space to house the College's programs. Approximately 150,000 gross square feet of flexible office space would provide areas for various program and administrative offices. Necessary infrastructure and a parking structure associated with the new building will also need to be
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 92 FY-2015 Budget Request
760 06-12-2013
760-0222 College of Continuing Education Off Bldg
constructed as part of the project.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 93 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-12-2013
760-0222 College of Continuing Education Off Bldg
0
0
0
0
14,500,000
14,500,000
11,000,000
3,500,000
14,500,000
17,500,000
17,500,000
1,500,000
12,500,000
3,500,000
17,500,000
0
0
0
0
0
0
0
0
32,000,000
32,000,000
1,500,000
23,500,000
7,000,000
32,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 94 FY-2015 Budget Request
760 06-12-2013
760-0222 College of Continuing Education Off Bldg
Source of funds is to be identified
University staff - 05/01/13
94,000
250.00
23,500,000.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 33 FY-2015 Budget Request
760 06-10-2013
760-0077 Fred Jones Art Ctr Renov-School of Art
520 Parrington Oval
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
30
54
Renovation
This project will include extensive renovation of interior spaces and the supporting mechanical, electrical, and computer and telecommunications systems necessary to modernize the art school facilities. In addition, the facility will be brought into compliance with current fire, life safety,and accessibility codes. Academic spaces for art instruction and other areas will be upgraded for current use and to meet current environmental isolation and health standards. Exterior repairs will
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 34 FY-2015 Budget Request
760 06-10-2013
760-0077 Fred Jones Art Ctr Renov-School of Art
be made to restore the building to good condition.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 35 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0077 Fred Jones Art Ctr Renov-School of Art
0
0
0
0
600,000
600,000
600,000
600,000
7,400,000
7,400,000
900,000
6,200,000
300,000
7,400,000
0
0
0
0
0
0
0
0
8,000,000
8,000,000
900,000
6,200,000
900,000
8,000,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 36 FY-2015 Budget Request
760 06-10-2013
760-0077 Fred Jones Art Ctr Renov-School of Art
Source of funds is to be identified
University staff - 05/01/13
71,000
87.32
6,199,720.00
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 17 FY-2015 Budget Request
760 06-10-2013
760-0032 Univ Research Campus-No. Infrastructure
University Research Campus-North
Norman
Statewide
44
16
4
8
Educational Facilities
Pending
Self Funded
30
55
The establishment and growth of the University Research Campus-North is dependent upon the developmentof an infrastructure foundation for the property. The University Research Campus-North is comprised of approximately 1,100 acres and organized into two basic elements: Swearingen Research Park and Max Westheimer Airport. This project involves the enhancement and addition to existing infrastructure systems on the east side of the property. Improvements include road construction and repair, street
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
** Items with(Criteria_) after them are used to complete the Criteria/Rating Scale.**
Location of Project
Address:
City:
County(ies) to be served:
Legislative District numbers: House -
Senate -
Congressional District number:
Sub-State Planning District number:
Type of Project:
Project Status:
Funding Type:
What is the useful life of this project in years:
Agency's priority number for project: (Criteria G)
Type of building construction:
Description of project and justification:
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 18 FY-2015 Budget Request
760 06-10-2013
760-0032 Univ Research Campus-No. Infrastructure
lighting and sidewalks, sewer mains, water distribution systems, storm water detention pond construction, perimeter and street landscaping, construction of primary entrances, and the demolition of several structures necessary to prepare sites for development.
No
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Description of project and justification:
How will this project benefit those served by your agency? (Criteria C)
Are there legal obligations or mandates? (Criteria B)
Is this a request to supplement previous funding for this project: (Criteria F)
If yes, indicate the source and amount of funding and the year(s) it was provided:
Does this project involve technological advancement? How? (Criteria H)
What is the effect of delaying this project or maintenance schedule? (Criteria E)
(con't)
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 19 FY-2015 Budget Request
2014 2015 2016
2017 2018
2019
760 06-10-2013
760-0032 Univ Research Campus-No. Infrastructure
500,000
500,000
350,000
150,000
500,000
2,000,000
2,000,000
1,850,000
150,000
2,000,000
2,000,000
2,000,000
1,850,000
150,000
2,000,000
3,000,000
3,000,000
2,650,000
350,000
3,000,000
0
0
0
0
0
0
0
0
7,500,000
7,500,000
0
6,700,000
800,000
7,500,000
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
PROJECT SOURCES AND USES OF FUNDS (estimates should cover entire cost of project) (Criteria A)
Expeditures
thru 6 -Source of Funds:
State Approp.
G.O. Bonds
Federal/Matching
Gifts/Donations
Revenue Bonds
Section 13
Revolving Funds
Section 13 Offset
Other
Total Sources
Project Costs:
Equipment
Construction
Other
Total Costs
FY - FY -
FY -
& Totals
BRR0160
Printed: 06-17-2013 Capital Outlay Project
Capital Outlay, Pg. 20 FY-2015 Budget Request
760 06-10-2013
760-0032 Univ Research Campus-No. Infrastructure
Source of funds is to be identified
University staff - 05/01/13
Agency: University of Oklahoma Last Changed:
Project Number: Project Name:
Describe source of funds used or to be used on the previous table. (Explain whether G.O. or revenue bondproceeds are from existing or proposed issues, what will be the source of revenue to repay the bonds, and identify "Other" sources)(Criteria A)
Cost Estimate Information:
a. What is the source and date of your cost estimate? (e.g. Engineering Study - 12/3/90)
b. What is the square footage?
c. What is the cost per square foot?
d. Total: