Post on 26-Dec-2015
A Introduction 1. VIETNAM OVERVIEW 2. MINISTRY OF TRANSPORTATION
Contents
B/ Current Polices & Sytstems 1. ROAD POLICY 2 . EXPRESSWAYS MASTER PLAN 2020 3 . BUDGET PLAN 4 . OBJECTIVE
C/ PROJECT MANAGEMENT UNIT 2 1. MAIN ROAD & BRIDGE PROJECT PMU2 2. OUTSTANDING PROJECTS IN VIETNAM 3. HELLO KOREA.
2. THE MOT MAIN MISSION
MOT is directly under Vietnam Government;
To implement state management in traffic and transport;
Owner of state budget project for transportation.
Comprehensive development and transportation network synchronization Vietnam
MINISTRY OF TRANSPORT
ORGANIZATION STAFF
ORGANIZATION SPECIALITY MANAGEMENT
PROJECT MANAGEMENT UNITS
AFFILIATED ENTERPRISES
CAREER ORGANIZATION
ORGANIZATION STRUCTURE OF MOT
B/ Current Polices & Sytstems 1. Road Policy
Vietnam Prime Minister has approved Vietnam Road System until 2020, which mainly focus on expressway plan as below:
1. Expressway from North to South of Vietnam with total length of 3.262 km:
- South-North Expressway in the East from Hanoi to Can Tho with length of 1,941 km, 4-8 lanes.
- South-North Expressway in the West from Ho Chi Minh to Kien Giang with length of 1,321 km, 4-6 lanes.
Road Policy
2. Hanoi Ringroad Expressway in the North with total length of 1.099 km
- Lạng Sơn – Bắc Giang – Bắc Ninh, length 130 km, 4 – 6 lanes.
- Hà Nội – Hải Phòng, 105 km, 4 – 6 lanes.
- Thành phố Hà Nội – Việt Trì – Lào Cai, 264 km, quy mô 4 -6 làn xe. 4 – 6 lanes.
- Nội Bài – Hạ Long – Móng Cái, 294 km, 4 – 6 lanes.
- Hà Nội – Thái Nguyên – Chợ Mới (Bắc Kạn), 90 km, 4 – 6 lanes.
- Láng – Hòa Lạc – Hòa Bình, 56 km, 4 – 6 lanes.
- Ninh Bình – Hải Phòng – Quảng Ninh, 160 km, 4 lanes.
1. Road Policy
3. Center Highland in Vietnam including 3 expressway sections with total length of 264 km.
4. South of Vietnam Expressway including 7 sections, total length 984 km.
2. Expressway Master Plan to 2020
22 Expressways Routes with Total length of 5.873 km.
The main Expressway from Ha Noi to Ho Chi Minh City
(3.262km;16 Sections)
3. Budget Plan
Budget need for investment of road transport system a) Required fund for construction of road system to the year 2020 - For national highway: US$ 800 millions. - Hồ Chí Minh Road: US$ 300 millions. - Inland Expressway US$ 17.5 billions 350.000 - Coastal Road US$ 17.5 billions - Provincial road US$ 60 billions - Urban road for Hanoi and Ho Chi Minh city US$ 13.5 billions - Rural Road: US$ 4 billions. b) Maintenance fund to year 2020 - National roads: US$ 2.6 billions. - Expressway: US$ 0.4 billions.
Project Management Unit 2 (PMU2) was established by the
MOT in 1993;
The divisions assist the General Director of PMU2 in managing
various projects. With over 250 staff members, PMU2 is the
transport unit having the highest disbursement quantity in the
past many years.
Address: 18 Pham Hung Street, Cau Giay Dist, Ha Noi, Vietnam.
Tel: 84-4-37680063; Fax: 84-4-37680073
C/PMU2: GENERAL INFORMATION
To implement responsibilities and authorities of Project Management Unit according to current regulations of the Ministry of Transport as for projects in which Ministry of Transport is employer.
To implement responsibilities and authorities of the employer to be devolved, delegated and assigned by DRVN during preparation investment implementation periods of the projects, completion of the projects and putting projects into operations for projects in which DRVN is employer.
As for projects which are under management by other employers.
PMU2 MAIN FUNTIONS
LEADERS
ADMINISTRATIVEOFFICE
FUNTIONDEPARTMENTS
PROJECT IMPLEMENTATION
DIVISIONS(PID1 ~ PID10)
ECONOMIC & PLANNING
DEPT
ENGINEERING& ASSESSMENT
DEPT
FINANCE & ACCOUNTING
DEPT
ORGANIZATION CHART OF PMU2
TT PROJECT’S NAME STATUS
1 New National Highway and Regional Road Network Construction Project Section Hanoi - Thai Nguyen
On-Going
2 Thai Nguyen Bypass Section Project On-Going
3 Road Network Rehalibitation Project (WB4) On-Going
4 National Highway No.1 Bridge Rehalibitation Project - Phase III, Section Can Tho - Ca Mau On-Going
5 45 rural bridge construction Project in High Land and Central Provinces On-Going
6 National Highway No.3B Improvement Project On-Going
7 National Highway No.31 Improvement Investment Construction Project (Huu San - Ban Chat section)
On-Going
8 Tan Vu - Lach Huyen Highway Project Preparing Investment
9 Weak briges’ improvement and new construction on National Highways in the whole country Preparing Investment
10 Hanoi’s Ring Road No.4 Project Preparing Investment
11 National Highway No.18 Improvement Project Recently Completed
12 National Highway No.10 Improvement Project Recently Completed
13 Bai Chay Bridge Construction Project Recently Completed
14 National Highway No.37 (Gia Phu – Co Noi section (Phase I) Recently Completed
1. MAIN ROAD & BRIDGE PROJECT PMU2
New National Highway No.3 Project- Total Cost: 413 mil. USD.- Funded by ODA Japan and Vietnam- Construction period: 2009 - 2013.- Total length: 61 km; 4 - 6 lanes; Width: 34 m.- Ground-Breaking: 12/2009
MAIN ROAD & BRIDGE PROJECT
Tan Vu - Lach Huyen Highway- Total Cost: 430 mil. USD.- Funded by ODA Japan and Vietnam- Construction period: 2012 – 2015.- Total length: 15,9 km; 4 lanes; Width: 29.5m; Bridge length: 5,4 km.
MAIN ROAD & BRIDGE PROJECT
Ring Road IV Ha Noi Construction- Total Cost: 3.187 mil. USD.- Funded by ODA; Vietnam and BOT- Construction period: 2012 – 2020.- Total length: 136 km; 4 - 6 lanes; Width: 120m.- Preparing Investment.
MAIN ROAD & BRIDGE PROJECT
2. OUTSTANDING PROJECTS IN VIETNAM
My Thuan Bridge Project First Cable Stayed Bridge in Vietnam. Total Cost: 114 mil. USD. Funded by Australia (66%) and Vietnam (34%). Construction period: 1997 – 2000. Total length: 1,535m; 4 lanes; Width: 23.6m. Main bridge length: 650m; Main span: 350m.
OUTSTANDING PROJECTS IN VIETNAM
Hai Van Tunnel Project First and Longest Tunnel in Vietnam. Total Cost: 127,9 mil. USD. Funded by Japan (80%) and Vietnam (20%). Construction period: 2000 – 2005. Total length: 6.280 m; 4 lanes; Width: 10m.
OUTSTANDING PROJECTS IN VIETNAM
Bai Chay Bridge Project First Cable Stayed 1 Layer Bridge in Vietnam. Total Cost: 90 mil. USD. Funded by Japan (75%) and Vietnam (25%). Construction period: 2003 – 2006. Total length: 1,053m; 4 lanes; Width: 23.4m. Main span: 453m (Longest in the World).
Ho Chi Minh – Trung Luong Expressway Project (stage I):
State Budget.
Total Cost: 500 mil. USD
Total length: 62km; 4 lanes.
40 km expressway (including
16km viaduct).
22km connecting road.
Construction period: 2005 – 2010.
OUTSTANDING PROJECTS IN VIETNAM
OUTSTANDING PROJECTS IN VIETNAM
Can Tho Bridge Project: Longest Cable Stayed
Bridge in South-East Asia.
Total Cost: 342.6 mil. USD.
Funded by JICA.
Construction period: 2004 –
2010.
Total length: 15,750m; 4
lanes; width: 23.1m.
Main bridge length: 2,750m;
Main span: 550m.
MinisterVice Minister
Assistant Minister
Private CapitalDivision
Road Bureau
6 Road Divisions
Regional Const. &Man. Office
Highway Const.Bureau
River Bureau
Const. & Man.Office
Management Bureau
Highway Const. &Man. Bureau
ROAD ADMINISTRATION IN MLTM
EXPRESSWAY CONSTRUCTION
1968 : 0 km (start)1968 : 0 km (start)
2001 : 2,600 km2001 : 2,600 km
2007 : 3,000 km2007 : 3,000 km
2009.9 : 3,685 km (59.8%)2009.9 : 3,685 km (59.8%)
1968 : 0 km (start)1968 : 0 km (start)
2001 : 2,600 km2001 : 2,600 km
2007 : 3,000 km2007 : 3,000 km
2009.9 : 3,685 km (59.8%)2009.9 : 3,685 km (59.8%)
2020 : 6,160 km2020 : 6,160 km
- 7 × 9 network- 7 × 9 network
9 East-West corridors9 East-West corridors
7 South-North corridors7 South-North corridors
2020 : 6,160 km2020 : 6,160 km
- 7 × 9 network- 7 × 9 network
9 East-West corridors9 East-West corridors
7 South-North corridors7 South-North corridors
GENERAL INFORMATION OF KEC
PresidentPresident
Vice PresidentVice President
Business Operation
Business Operation
Maintenance& Traffic
Maintenance& Traffic ConstructionConstruction Project
Development
Project Development
Regional HQ(6)Regional HQ(6) ConstructionOffice (14)
ConstructionOffice (14)
Expressway & Transportation
Research Institute
Expressway & Transportation
Research Institute
Traffic Information Center
Traffic Information Center
ManagementSupport
ManagementSupport
32 teams
BODBODAuditorAuditor
Toll Office(305)Toll Office(305)
MaintenanceOffice(49)
MaintenanceOffice(49)
Incheon bridge - The expressway from Incheon International Airport to New Songdo City has total length 21.4 km, total project cost: 2,383 bil KW. - Incheon Bridge: 18.4 km long bridge over sea with superstructure box girded and cable stayed. - Construction Period: 52 months, July. 2005 - Oct. 2009.
Incheon bridge
BEAUTIFUL COUNTRY
FRIENDLY
FRESH AIR
COMFORTABLE EXPRESSWAY
INTELLIGENT TRANSPORTATION SYSTEM
MODERN SUBWAY SYSTEM
OUR FEELING ABOUT KOREA