Post on 19-Jul-2020
121
St N
W
o/h door
2.7m
set
back
(min
.)
1.2m setback(min.)
3m setback(min.)
1.2m
set
back
(min
.)
1.2m setback(min.)
LANE
102 Ave NW
sidewalk
side
wal
k
property line
property line
PARKINGENTRANCE
LOADINGENTRANCE
RES
IDEN
TIA
L TO
WER
ENTR
AN
CE
ground-orientedresidential units
ground-orientedresidential units
COMMERCIALENTRANCE
Appendix I - Site Plan (Podium Level 1)
o/h door o/h door
2.5m
(min
.)
8m (min.)
commercial frontage
residential frontage
4.2m
set
back
2.7m setback(min.)
1.5m stepbackmin.
4.8m
set
back
(min
.)
property line
prop
erty
line
prop
erty
line
property line
Appendix II - Podium Levels 3 Setbacks and Stepbacks
3m setbackmin.
patio
s
patio
s
patios
patios
patio13
m m
ax.
7m m
ax.
3m stepbackmin.
covered loading+ parking entry below
L2 p
atio
sbe
low
level 4 dashedabove
ground-oriented residential units below
ground-oriented residential units below
LANE
102 Ave NW
121
St N
W
property line
prop
erty
line
prop
erty
line
property line
4m setback(min.)
11m
set
back
(min
)6m
set
back
(min
.)
7.5m setback(min.)
Appendix III - Tower Setbacks
prop
erty
line
prop
erty
line
121 St NW
TOWER SETBACK4m (min.)
TOWER SETBACK7.5m (min.)
1.2m(min.)
3m(min.)
1.2m(min.)
54m
(max
.)11
m (m
ax.)
pre-finished metalscreen
glazed balcony railing
masonry cladding
glazed window system
pre-finished metalcladding
masonry cladding
pre-finished metalcladding
prop
erty
line
prop
erty
line
O/H door
Appendix IV - Elevations (north along lane)
prop
erty
line
prop
erty
line
TOWER SETBACK6m (min.)
TOWER SETBACK11m (min.)
2.7m(min.)
54m
(max
.)
1.2m(min.)
11m
(max
.)
LANE
pre-finished metal screen
glazed balcony railing
masonry cladding
glazed window system
pre-finished metalcladding
masonry cladding
prop
erty
line
prop
erty
line
clear glazing
102 Ave NWentrance canopy
Appendix IV - Elevations (west along 121 St NW)
prop
erty
line
prop
erty
line
TOWER SETBACK7.5m (min.)
TOWER SETBACK4m (min.)
1.2m(min.)
54m
(max
.)
3m(min.)
11m
(max
.)
121 St NW
prop
erty
line
prop
erty
line
pre-finished metal screen
glazed balcony railing
masonry cladding
glazed window system
pre-finished metalcladding
masonry cladding
pre-finished metalcladding
clear glazing
Appendix IV - Elevations (south along 102 Ave NW)
prop
erty
line
prop
erty
line
LANE
TOWER SETBACK11m (min.)
TOWER SETBACK6m (min.)
1.2m(min.)
54m
(min
.)
2.7m(min.)
11m
(max
.)
pre-finished metal screen
glazed balcony railing
masonry cladding
glazed window system
pre-finished metalcladding
masonrycladding
privacy screen
prop
erty
line
prop
erty
line
102 Ave NW
Appendix IV - Elevation (east)
tow
nhou
se p
rivat
e pl
antin
g
■■
■■
■pr
ivat
e■
■■
■■
■■
■ pu
blic
■■■
■
deco
rativ
e co
ncre
te o
n th
e pa
tio a
rea
only
w/
pote
ntia
l bik
e pa
rkin
g lo
catio
n
site
furn
ishi
ngs
priv
ate
patio
s
I a
lle
y
I p
rop
ert
yli
ne
--■-
-------
■ ■
■ ■-
11!_ !" _ ■
■ ■
■ ■
■ ■
■ ■
■ _!I
-■ ■
■
--
--
--
--
r;====/-
===�
r==
=
I oad
i ng
deco
rativ
e co
ncre
te
bu
i ld
ing
com
mer
cial
ret
ail p
atio
102
Ave
nu
e
I ex
istin
g O
liver
Exc
hang
e Bu
ildin
g
-- -
i cex
istin
g I
resi
denc
e I(
Ap
pe
nd
ix V
- Co
nce
ptu
al
La
nd
sca
pe
Pla
n
121
St N
W
o/h door
loadingbay
residential lobby,concierge, waiting,
mailroom, office, etc.residentialvestibule
commercialrental unit(s)
back ofhouse
services
refuse &recycling
rampdown toparking
ground-oriented residential units
2.7m
set
back
(min
.)
3m setback(min.)
1.2m setback(min.)
circ. core
o/h door o/h door
LANE
102 Ave NW
sidewalk
side
wal
k
property line
prop
erty
line
prop
erty
line
property line
PARKINGENTRANCE
LOADINGENTRANCE
RES
IDEN
TIA
LEN
TRA
NC
E
COMMERCIALENTRANCE
Appendix VI - Conceptual Ground Level Floor Plan (Podium Level 1)
ground-oriented residential units
1.2m setback(min.)
1.2m
set
back
(min
.)
2.5m
(min
.)
8m (min.)
102n
d AV
ENUE
NW
121st STREET NW
LAN
E
LANE
120th STREET NW
prop
erty
line
property line
prop
erty
line
property line
Lane
upg
rade
s
Publ
ic a
rt lo
catio
n
Land
scap
ing
on p
ublic
R/W
Pote
ntia
l loc
atio
n of
fam
ily s
tyle
dw
ellin
gs
Pote
ntia
l bic
ycle
rep
air
loca
tion
Build
ing
foot
prin
t
App
endi
x VI
I - C
once
ptua
l Pub
lic A
men
ity C
ontr
ibut
ion
Plan
side
wal
k
sidewalk