Post on 27-Mar-2020
No more dusty files!25th September 2019
Steve Hunt - Managing Director
LOD 100 LOD 200 LOD 300 LOD 350 LOD 400 LOD 500
PHOTO POINT CLOUD SCAN REVIT MODEL
Boiler Flow 82oC
Boiler Flow 82oC
Gas Consumption15m3/hr
Asset Description Maintenance Frequency(Months)
Maintenance Cost per visit(£)
Life Expectancy(Years)
Replacement Cost(£)
AS1 Boiler 6 300.00 20 3500.00
AS2 Boiler 6 300.00 20 3500.00
AS3 Pump 12 125.00 20 750.00
AS4 Press. Unit 6 175.00 15 1450.00