2

Update on the Work

Feedback on previous questions

Strengthening and diverting the collector

Redeveloping rues Saint-Rémi/Saint-Jacques/Pullman

Retaining wall – A-720

CN rail works – rue De Courcelle

Ramp from A-15 south to A-20 west

3

Feedback on Previous Questions

Why has the boulevard Cavendish not been extended to

facilitate the East/West transit?

4

Strengthening and Diverting the Collector

Diverting the collector: April 2015 to end of 2015

5

Strengthening and Diverting the Collector

Diverting the collector: April 2015 to end of 2015

6

Strengthening and Diverting the Collector

Diverting the collector: April 2015 to end of 2015

7

Rues Saint-Rémi/Saint-Jacques/Pullman

Closure of Exit no 2 – Rue Saint-Jacques since August 24, 2015

until end of November, 2015

7

LONG-TERM

CLOSURE

Exit no 2 – Rue Saint-Jacques

8

Retaining Wall – A-720

September 14, 2015 until beginning of March, 2016

Closure of rue Richelieu, at the level of rue Collège, during a week

(date to be announced)

Retaining

wall

Road

works zone

9

CN Rail Works – rue De Courcelle

9

From June 29, 2015 to end of December, 2015

10

Ramp from A-15 south to A-20 west

Installation of red handrails on the future ramp of A-15 south

to A-20 west

10

11

11

www.turcot.gouv.qc.ca