NAS InfrastructureRoadmap Update
NEXTOR Infrastructure ConfKip Spurio, NAS Chief ArchitectJune 2006
2Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Relationship of Roadmap to Strategic Vision/Planning
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N • A I R T R A F F I C O R G A N I Z A T I O N 2
Enhance Fin ancial D iscipline
2.1 Be better stewards of publ ic funds
2.5 Increase
ATO product iv it y
2.9 Use financ ial information and tools to manag e
effectively
2.8 Establish constructive mgmt/labor
relationships
2.3 Rebu ild credib ility an d t rust with customers and
owners
2.6 Invest in priorit iz ed solut ions that provide positive return, on time, on
budg et
2.4 Reduc e unit cost of ATO operati ons
2.2 Make the NAS more cost effective
2.7 Train or hire needed skills
1.6 Optimize service
availabi lity
1.4 Manage airspac e use and traf fic optimal ly
1.3 Ensure safety and aircr aft separat ion
1.7 Plan an d execute well
across organ izational u nits
1.1 Ensure airs pace system is safe and
ef ficient
1.2 Improve operationa l
predicta bil it y
1.5 Minimiz e impacts of
weather o n the operation
1.8 Enhanc e empl oyee commitment through ef fect ive leadership
Achieve Operational Excellen ce
Increase Capacity W here N eeded
Ensure Viable Future
ATO Strategy Map
3.4 Refine separation standards
3.5 Ident ify and pri orit ize airspac e and a irport
initiat iv es base d on value
3.2 Build capacity safely to meet
demand
3.1 Support economic growth throu gh safe,
targeted capacity increas es
3.3 Implement airspac e and
airport capacity enhanceme nts
3.6 Encourage innov ative think ing to align resourc es with
demand
4.1 Assure a sustaina ble a nd
affordable air t raffic system for the future
4.2 Deliv er a future air traffic system that
meets customers’ operat ional needs
4.3 Devel op an d execute ATO business plan
4.5 Develop alternativ e business
concepts for the future
4.4 Collabor ate with customers,
owners, and other strategic
partners
4.6 Enhanc e busi ness measurem ent and
predictiv e capa bil ity
4.7 Foster value-driven w orkplace
Versio n 5 20Dec04
Services
Infrastructure FY07 FY08 FY09 FY10
MIS
SIO
N
drive
satisfies
Mis
sion
Roa
dmap
Mis
sion
Roa
dmap
FY07 FY08 FY09 FY10
Service RoadmapService Roadmap
NG
AT
S
During the Budget Formulation Process for a Specific FY…Pathway Initiatives Prioritize and Refocus Roadmap Proposed Improvements – There must be 100% mapping from SMP to Roadmaps
• Strategy Map provides Initiatives tied to specific Organization Objectives
Proposed Service/InfrastructureImprovement Initiatives
SMP Pathway Initiative Mapped to Infrastructure
Infrastructure RoadmapInfrastructure Roadmap
• Mission Roadmap provides view of Service/Infrastructure Change (Improvement Initiatives)
drives
Mission Roadmap Improvement Initiatives Influence SMP Objective/Initiative Development
1
23
3Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Relationship of ATO NAS EA to Capital Planning
CA IOC FOCCDRPDR
IARR JRC2
CA IOC FOCCDRPDR
Program Execution
InvestmentAnalysis
Forecast for• Owners• Customers
Updates
• New SIs• New SI Instances
(Current SI @ new location)NAS EA
tService Improvement Initiatives
ServiceDelivery
• New IIs
MissionRoadmap
2
3
Org
A
Org
B
Org
z
SI (1) L sSI (2) LSI (n) LII (1) LII (2) s LII (n) L
L Lead Orgs Support Org
Allocation Matrix
Infrastructure Improvement Initiatives
ValidatedInitiativeShortfalls
Concept & Rqmts Def
Identify S hortfall &
• Capability Shortfa ll Quantificat ion
• Shortfall Impact • Criticality, T ime
Frame o f need• New Technology
Opportunity• Dra ft Mission
Need Statement
A RQ-300 (Identify)A SD-400 (Quantify)
Lead: ARQ-300Support: ASD-400
Service Area Analysis
Lead: ARQ-300Support: ASD-400
Service Area Analysis
• Concept descriptions(A ll may notmeet 100% o fshortfall)
• A ction Plan for IA RR
ASD-100(lead)A SD-300 (support)A RQ-100 (support)
De vel opRange of
Alternatives(3)
ASD-100 (lead)A RS (support)IPTs (support)
Devel op NASArchitec ture
Outlook/Boundaries
(2)
• Cons istency withNA S Architecture
• Cost/Technical/ Schedule bounds
Lead: ASD-100Support: ARS
Concept Definition
Lead: ASD-100Support: ARS
Concept Definition
1-3 Months
Decis ion Criteri a• Dra ft Mission Need Statement• Quantified shortfall analysis• Range of Alternative s olutions• A rchitecture Outlook• A ction Plan for IA RR
•“Acceptable” M NS funding profile based on like lycost, value, willingness topay, and FAAprio rit ies
• A lign ment w ith corporate goals
• How s ervice/systemw ill be used
• How benefits willbe achieved (benefitmechanis ms)
• Beco mes partof require mentsdocument
De vel opConce pt(s)
Of Use(4)
A RQ-300
•Initial RequirementsDocu ment(threshold/object iverequire mentsfor keypara meters)
•Functional A rchitecture•Technical Descript ions
Devel opIni tial
Requirements(5)
ARQ-300 (lead)ASD-100 (supp ort)
IPTs (support)
•ROM LCC es timates for range ofalternat ives for M NS
Esti mateCosts
(6)
ASD-400A FZ-400
• IAP– scope– ass umptions– alternatives– ris ks– benefits– costs– schedule– resources
De vel opIni tial
In vestmen tAn alysis
Plan(8)
ASD-400
Ass essAffor dability
(7)
A SD-300ARQ -100
Mission Nee d
Decision
Investment AnalysisReadiness Review (IARR)
In vestment AnalysisEntrance Criteria • Final Mission Need
Statement• Initia l Require ments
Document (iRD)• Initia l Alte rnatives• Concept of Us e• Initia l Investment
Analysis Plan
ARS-1/ASD -1 Progress Re vie w Checkpoint. Refe r any ma jor iss ues to A TS-1 and ARA-1.If appropriate, process can be terminated.
JRC-1
3-9 MonthsTarge t Schedule
Date: July 28, 2003Version: Rev. 10
Appr oval by FAE & S ponsors
In Inves tment Analysis 2a Phas e:•Update iRD•Revalidate MNS•Refine Alternatives•Acquisition Strategy•Ris k Analysis•ROI•APB•Business Cas e
QuantifyImpac t
(1)
Denotes new M issionAnalysis activitie sDenotes new M issionAnalysis activitie s
Lead: Sponsor’s Requirements Organization, ASD-400Support: AFZ-400, ASD-100/300, IPTs
Requirements Definition & Investment Planning
Lead: Sponsor’s Requirements Organization, ASD-400Support: AFZ-400, ASD-100/300, IPTs
Requirements Definition & Investment Planning
Annual Budget Process
Prioritize SIs
Prioritize IIs
Adjust Roadmaps Based on Priority
to fitBudget Profile
A B CCurrent Baseline Re-ValidatePriorities
Iterate as needed
Update
AMS
1
Exploration Validation
R&D
4Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Infrastructure Roadmaps
• Motivation – Efficiently accommodate NGATS vision
• Roadmaps– Automation– Communications– Surveillance– Navigation– Weather
5Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Automation Assumptions
• Enhanced TFM, where assets adjust to flow, not flow constrained by infrastructure
• Net-centric operations via SWIM-based architecture link ATM, customers, DHS, and DoD into common information environment
• Automation and Data Convergence across domains with a Common Display Subsystem
• Converge with automation “Back-Rooms” and integrate security management
SWIM 1SWIM 1
ERAMR3
ERAMR3
RMMSRMMS
DSRDSR
2004 2005 2006 2007l
Display
NA
S -W
ide
Oce
anic
En R
oute
Term
inal
ARTS IIEARTS IIE
ERAMR2
ERAMR2
MEARTSMEARTS
DOTSDOTS
1
Dom
ain
Con
verg
ence
Ana
lysi
s
2
ARTS IIIEARTS IIIE
C-ATM-T WP NC-ATM-T WP N
TFM
Parts of FDP
C-ATM-TWP2
C-ATM-TWP2
C-ATM-TWP3
C-ATM-TWP3
C-ATM-TWP1
C-ATM-TWP1
DataComm ServiceDataComm Service
ECGECG
FDIOFDIO
URET CPURET CP
EBUSEBUS
TMATMA
HCS (G3)•RDP•FDP
HCS (G3)•RDP•FDP
ATOPATOP
ERIDS / IDSERIDS / IDS
ARTS IIIAARTS IIIA STARSSTARS
DSRDSR
AIM / NOTAMSAIM / NOTAMS
2006 2007 2008 2009 2010 2012 2014 2018 2020 2022
ERAMBASELINE
R1
ERAMBASELINE
R1
RMMS
AIM
C-ARTSC-ARTSARTS IIIEARTS IIIE
TFM-MBaselineTFM-M
Baseline
ECGECG
FDIOFDIO
URET CPURET CP
EBUSEBUS
TMATMA
HCS (G3)•RDP•FDP
HCS (G3)•RDP•FDP
ERAM DSERAM DS
7
ARMT/EFSTS/SMS/STMSARMT/EFSTS/SMS/STMS
2016
4
6
5
3
2024+
AIMAIM
Com
mon A
ut omat ion P lat fo rm
an d Co m
mo n (C
AP )
Disp la y S ub sy st em
( CD
SS )
Evaluator Algorithm
Enhancement W
P1Evaluator A
lgorithm Enhancem
ent WP1
Evaluator Algorithm
Enhancement W
P2Evaluator A
lgorithm Enhancem
ent WP2
OFDPSOFDPSFDP2KFDP2K
ERAMRefreshERAM
Refresh
EvaluatorEvaluator
EvaluatorEvaluator7
Establish DM
Z for aggregated set of Critical Functions
Initiate Identity Mgm
t & Security M
gmt Infrastructure
Implem
ent Identity Mgm
t & Security M
gmt Infrastructure
Automation Roadmap
RMMSRMMS
7Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Automation Roadmap Decisions2007 - Investment decision for Data Communications
Service (DCS) and Integration of DCS with CAP 2007 - Decision on Security and SWIM Policy/
Implementation 2009 - Decision about OCONUS facilities2010 - Decision for proceeding with CAP or NGATS
automation platform to support NGATS vision and align facilities, equipment and staff for General Service Delivery Facility (GSDF)
2012 - Decision for DOTS Integration into TFM 2012 - “Move-in” Decision on the GSDF2016 - Decision for Implementation into CAP
1
2
3
4
5
6
7
8Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Communications Assumptions
• NAS characterized by Net Centricity• All flight safety critical communications
VHF• FTI becomes primary Voice/Data transport
system• Next Generation Voice Switch (NVS) is
required• Broadcast Services available over multiple
links
9Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Communications Roadmap ANICSANICS
2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
FAATSAT
Tele
com FAATSAT
FTIFTI
LINCSLINCSFTI Re-compete
Mob
ileC
omm
Studies Digital VHF Aero-Mobile Comm.
NVS
VSCS
Voic
e C
omm
Switc
hing
VSCS
ETVS/IVSRETVS/IVSR
Net
wor
kSe
rvic
es
FISFIS
SWIM (Ground)SWIM (Air)
Commercial /SATcom
Sustain current VHF A/G Voice InfrastructureRCE, CFE, RFI Elimination
UHF and VHF Radios
Sustain current VHF A/G Voice InfrastructureRCE, CFE, RFI Elimination
UHF and VHF Radios
DCS National Deployment
Dat
a Li
nk &
B
road
cast
A
pps
Broadcast Services
Enhanced Applications
1
2 2a2b
3
3a 3b
4
4a
5
6
7
10Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Communication Roadmap Decisions2007 - Decision on FAATSAT integration2007 - Decision on Future Air/Ground Comm. System
Europe/U.S. Harmonization – 2008 - Investment decision for modernized new Air/Ground
Communications system infrastructure– 2010 - Decision for Rulemaking for new air/ground comm. system
2007 - SWIM Investment decision– 2008 - SWIM Standards– 2014 - Airborne SWIM Investment decision
2008 - Investment decision for new voice switch– 2009 - Decision to extend VSCS/ETVS or commit to NVS cut-over
2007 - Investment decision for Data Communications System (DCS)
2007 - Investment decision to implement additional Broadcast Services (ADS-B)
2018 - Investment decision to implement enhanced data link applications
1
2
a
b
3
a
b4
a
5
6
7
11Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Surveillance Assumptions
• Migrate Long Range Radars to e-Gov concept (single agency/multi-user)
• Move to ADS-B with Multi-Lateration as backup
• Surveillance “right-sizing” will result in low activity sustain of existing systems until Next Generation Surveillance system
12Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Surveillance Roadmap
ATCBI-6ATCBI-6
ASR-11ASR-11
ASR-9ASR-9
LRRLRR
ASDE-XASDE-X
Mode SMode S
PRMPRM
ASR-7/8ASR-7/8
ATCBI-4/5ATCBI-4/5
ASDE-3ASDE-3
Terminal Primary
Radar Right-Sizing
NG
ATS
Surveillance
3
1
DoD Assets
Replace all ASR-7s
Replace co-located
beacons (ASR-7s)
Replace allen route BI-4/5s
Replace remainingBI-4s, some BI-5s(Mode S Leapfrog)
ASR-8 only
ATCBI-5 only(terminal)
Remove all beaconsat mortality
Add Multilat,some sites
Remove ASDE-X/3Xprimaries at mortalityReplace PRM
with Multilat
ASDE-3X
ADS-B/TIS-B/FIS-B
Multilat& ADS-B
Only
2
2
2
2
3
4
6
6
6
7
7
7
5
7
5
Remove remainingASDE-3s at mortality
2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
13Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Surveillance Roadmap Decisions2006 - Investment decision for Automatic Dependent
Surveillance / Traffic/ Flight Information Services - Broadcast (ADS-B/TIS-B/FIS-B) NAS-Wide Implementation
2006 - Investment decision for Terminal Radar (ASR-9/Mode S) low-activity refresh; restructuring ASR-11 program to address critical needs (ASR-7 replacement); digitizing and extending remaining ASR-8 radars
2009 - Investment decision for leapfrogging Mode S beacons, replacing remaining ATCBI-4 beacons and selected ATCBI-5s
2009 - Decision for continuation of PRM, or removal from service, based on RNP and Multilateration
2014 - Decision for continuation of ASDE-X/3X primary radars, or removal from service, based on Multilateration/ADS-B
2014 - Decision on Terminal Primary Radar right-sizing (continuation, reduction, or removal from service)
2014 - Decision for continuation of beacon radars, or removal from service, based on ADS-B and capacity backup
1
2
3
4
5
6
7
14Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Navigation Assumptions• The FAA requires an aggressive transition to space-based service.
– Decisions needing to be made with the aviation community.• share burden with operators through equipage mandates• transfer costs to airports through statutory changes
• FAA will provide NAS-wide space-based service:– RNAV/RNP (GNSS – including augmentation systems)– Baseline approach service is Cat I or equivalent
• Policy determination on what is adequate backup– FAA will provide NAS-wide backup for RNAV/RNP– FAA will provide Cat I ILS as backup at OEP airports (~55 airports)– End State - Most Cat I ILS & all Cat II/III ILS will be divested (transferred or
decommissioned)• Fleet Equipage
– Today = Mixed Fleet – GNSS, D/D and D/D/I– Future = Fleet equipped with GNSS
• Decision/specification of “Backup/Redundant” systems• GPS dual-frequency (L5) service crucial
15Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Navigation Roadmap2006 2008 2010 2012 2014 2016 2018 2020 2022 2024
En R
oute
&
Term
inal
Cat
IN
PAC
at II
/III
VORVOR
ILSILS
GBASGBAS
ILSILS
GBASGBAS
GPS IIIGALILEO GPS (L5)
1a
1
GPS IIIGALILEO GPS (L5)
3a 3b
4a 4b4
GNSSGNSS
3
3
GNSSGNSS
1
DME/DMEDME/DME
WAASWAAS
ABASABAS
3
4a4
4a4
SBAS/GLSSBAS/GLS
4b
4b
1a
2
3a
VORVOR
16Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Navigation Roadmap Decisions2007 - VOR decision for drawdown based on GNSS
- 2015 - VOR decision on complete drawdown 2007 - Rightsizing DME Requirements, e.g., Service Volume,
DME Architecture2008 - Decision on next generation Cat I landing system/GLS &
mandate.Potential need for Local Airport Repeater (LAR) (leverageWAAS investment to provide low-cost GBAS).
– 2012 - Begin ILS Cat I drawdown - limited backup at OEP airports– 2020 - Mandate execution
2008 - Decision on next generation CAT II/III service mandate,pending feasibility & schedule of potential ABAS/GBAS solutions and risk mitigation strategies– 2012 - Begin drawdown of ILS Cat II/III services
- CAT II/III service provision transitions to airport & operator- Airports responsible for all lighting costs
– 2020 - Mandate execution
1
a
2
3
4
a
b
a
b
17Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Weather Assumptions – High Level
• Ongoing Weather Sensor Sustainment– Issues
• Sustainment of ASR-9/11 when surveillance no longer ground based• Need for ground based WS/MB functionality (SE study)
• Rulemaking to support in situ aircraft observations (MDCRS and TAMDAR-like systems)
• Migrate to Common NEO Communications• Develop General Weather Processor
– Issues• WARP End of Service• CIWS S/W brought up to standards (GFE)• ITWS integration
• Fund 4-D database
18Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
NAS Weather Roadmap SensorsN
on F
AA
Sou
rces
Non
FA
A S
ourc
es
05 2025
Sustain at non-WSP
& 9 LE sites
TDWR SLEP
SAWS Sustain
OpenRDA
Tech Refresh
AWOS Sustainor Replace
EnhancedMDCRS
ASOS & AWSS Sustain
LLWAS-RS/NELLWAS-RS/NE
TDWRTDWR
NEXRADNEXRAD
ASOS/AWOSAWSS
ASOS/AWOSAWSS
SAWSSAWS
MDCRSMDCRS
PIREPSPIREPS
ASR-WSPASR-WSP
ASR-9 WX Channel(Part of ASR-9 SLEP)
ASR-9 WX Channel(Part of ASR-9 SLEP)
1
4
9
PIREP autoEntry onERAM
15
3
11
3a
17
06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
DeCommor Sustain11a
Sustain or Replace with Wx Radar
DeCommor Sustain
Sustain1a
SLEP or Replacement2a
AWOS TR orReplacement3b 3c Replace ASOS
Mandatory Equipage of TAMDAR (Part 135/137)9a
Mandatory Equipage of MDCRS (Part 121)
TAMDAR Equipage extends > 2025
2
18
PIREP autoEntry on STARS15a
Open RDADual Pol
19Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
NAS Weather RoadmapDissemination and Processing and Display
Dis
sem
inat
ion
Dis
sem
inat
ion
Proc
essi
ng &
Dis
play
Proc
essi
ng &
Dis
play
05 202506 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
SWIM
(Weather
Subnet)
MIAWSMIAWS
WMSCRWMSCR
WARP 3WARP 3
ADASADAS
FBWTGFBWTG
ADASTR
Transition to SWIM
Communicationsonly Transitions
to SWIM
Transitionto SWIM
JAWSJAWS
7
13
8
Deployment& TCWF
JPDO 12
6CIWSPrototype
CIWSPrototype
NGATSGWP
6 6a
10 TechRefresh
6bWARP 3Sustain
FIS/TWIPFIS/TWIP
ITWSITWS
ADAS & ALDARS
Functionalityto CAP *
13a*CAP = Common
Automation Platform
NGATSGWP TR6d
ITWS Local processing
(MB Predict)transfersto CAP
10aITWS
NGATS 4-D WX
databaseEstablished
Wake VortexSystem
Wake VortexSystem 16 Deployment
WX Req. 5
14
6c
20Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Weather Roadmap Decisions• 2006 – Investment Decision for TDWR Service Life Extension
– 2018 – Investment Decision to Sustain TDWR/LLWAS-NE
• 2006 – Decision re FY08 and beyond as funding insufficient for NEXRAD Dual Pol; RPD in the works
– 2016 – Investment Decision for NEXRAD – SLEP or Replacement
• 2006 – Investment Decision to replace AWOS (becoming insupportable)– 2010 - Investment Decision for (1) ASOS sensor (Snowfall Rate); potential to eliminate Contract Wx
Observers at 36 Towers (~ $12M/year Ops cost avoidance), and (2) AWSS TR– 2016 – Investment Decision for AWOS follow-on TR
– 2020 – Investment Decision to replace ASOS
• 2006 – Status of remaining 150 SAWS TBD; may be used for spare parts and/or sites & regions receive system gratis but must pay Ops costs (SAWS related to Sfc Obs Service Standards)
• 2006 - Initiate FAA Weather Requirements Analysis to converge Wx System functionality into NGATS netcentric Wx capability
• 2006 – Investment Decision 2A for GWP (1st phase is WARP/CIWS functionality)– 2007 – Investment Decision 2B for GWP – 2008 - Investment Decision to Fund FAA portion of NGATS GWP– 2009 – WARP likely sustained w/existing O&M $$ till 2010/11 if funding not ‘perturbed’; otherwise possible
Investment Decision needed to sustain it to 2014 (when subsumed into GWP w/CIWS) – 2021 – Investment Decision for NGATS GWP TR
a
1
c
5
4
2
a
a
b
6
3
a
b
c
d
21Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
• 2006/7 – Service Unit decision to remove 3 MIAWS Prototypes upon ASR-11 commissioning• 2006/7 - Investment Decision on operational requirement for JAWS (Alaska) (convert to O&M) • 2008 - Investment Decision for S/W mods to WARP/ITWS to accept Enhanced MDCRS data
(humidity & turbulence)– 2016 – Decision to mandate weather sensor equipage on aircraft (Jetliners first, then Taxi/Commuter
later)
• 2008 – Investment Decision for ITWS toTech Refresh initial ITWS 6-8 ITWS production systemsField remaining 12 systemsExtend cost-effective coverage of NEXRAD/ASR to MIAWS sites – 2017 – Determine if prudent to TR ITWS or move ITWS functionality into GWP and MB Predict capability goes to CAP**; then
DeComm ITWS
• 2009 – Investment Decision to Sustain LLWAS-RS WS capability – TR 2011-2012– 2017 – Decision to DeComm LLWAS-RS based on low WS accident rates, more widespread training,
and possible coverage from NEXRAD (Eng study needed)
• 2009 – Investment Decision to fund FAA portion of NGATS 4-D Wx Data Base• 2010 - Investment Decision for ADAS TR to continue ALDARS after Comms Functionality
subsumed by SWIM– 2016 - Investment Decision to move ADAS/ALDARS functionality to CAP
• 2010 - Maintain CIWS prototype until 2014; then consolidate functionality into NGATS GWP
10
8
11
Weather Roadmap Decisions
9a
9
7
10a
11a
12
13a
13
14
22Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Weather Roadmap Decisions
• 2011 – Investment Decision to modify ERAM for “auto PIREP” entry– 2015 – Investment Decision to modify STARS For “auto PIREP” entry
• 2016 - Investment Decision to deploy Wake Vortex Sensor/Prediction capability
• 2017 – Decision to DeComm ASR-WSP based on low WS accident rates, more widespread training, aircraft equipage, and possible coverage from NEXRAD (Engineering study needed)
• 2018 – Investment Decision to Sustain ASR-9 (Wx Channel for Precip Intensity)
16
15
15a
17
18
23Federal AviationAdministration
FAA - Roadmap to the FutureJune, 2006
Facilities Assumptions
• Consolidate 200+ radar and some tower facilities into 15 GSDFs
• Keep ATCTs running until virtual ATCTs are viable (require a timeframe to modify this assumption).
• No new TRACONs will be built after 2012.• No new contract ATCTs will be built
after 2012.