INTRODUCTION
OLD TECHNIQUES
WORKING PLATFORMS
UNDERFLOOR LIFTING
TECHNICAL DATA
COMPONENTS
WASH PLANT
ELEVATED TRACKS
WHEELSET CHANGER
MOVABLE PLATFORM
ELECTRICAL COMPONENTS
DUBAI METRO DEPOT
COMPARISON
BIBLIOGRAPHY.
1 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
INT
RO
DU
CT
ION
The Multi Purpose Working Stand (MPWS) is designed to
enable maintenance operations on the roof, on the sides
and on underfloor components of rail cars. It consists of:
Roof Working Platform (RWP) with Train Driver Catwalk
(TDC)
Elevated Track.
Features at glance-
Working platforms
Underfloor lifting systems
Elevated tracks
Lifting jacks
Lifting and turning devices
Movable platforms
Train wash plants
Wheel set turning devices
turntables
MULTI PURPOSE WORKING STAND
PROJECT MANAGEMENT
CONSULTING
DESIGN & CONSTRUCTION
ASSEMBLING & SERVICE
PRODUCTION
MULTIPURPOSE PLATFORM
2 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
OL
D T
EC
HN
IQU
ES
EARLIER MOST
OF THE WORK IN
THE DEPOT WAS
DONE
MANUALLY
USE OF ROLLING STAIRCASE
FIXED PLATFORM MODULE
NON MOVABLE ELEVATED TRACKSPLATFORMS WERE FIXED,
NO UPWARD OR SIDE
MOVEMENT WAS THERE
FIXED TRACKS
FIXED PLATFORMS
MANUAL WASHING
UPLIFTING THROUGH OLD
MECHANICAL MEANS
3 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
OL
D T
EC
HN
IQU
ES
4 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
WO
RK
ING
PL
AT
FO
RM
S
WORKING PLATFORMSWorking platforms allow a quick, safe and easy access to the relevant workplace at side or on the roof of
the train by the staff. By moving the working platform close to the train the working risks are minimized.
ROOF WORKING PLATFORMSThe design of the roof working platform allows a
safe entering of the rail car roof alongside the whole
rail car length. The roof working platform will be
automatically moved gapless to the train.
FRONT WORKING PLATFORMSFor maintenance work at the front/nose of rail cars.
Functionality and working safeness define the designSIDE WORKING PLATFORMS SIDE WORKING PLATFORM
FRONT WORKING PLATFORMROOF WORKING PLATFORM
5 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
UN
DE
RF
LO
OR
LIF
TIN
G
UNDERFLOOR LIFTING SYSTEMS for lifting / lowering trains for maintenance, repair and replacement of wheelsets, bogies and components.
The initial position of the Underfloor Lifting System is at "Zero" level (T.O.R.) which allows the unobstructed
use and passing of the main working level.
CANTILEVER DESIGNWith this kind of lifting system the bogies to be
replaced can be moved out and in beneath the
whole lifted rail car (train). This is especially
interesting for workshops with space constraints
COLUMN DESIGNThis kind of lifting system allows the replacement of
bogies and components directly behind the lifting
system.
UNDERFLOOR LIFTING
SYSTEMS
CANTILEVER DESIGN
COLUMN DESIGN
UNDERFLOOR LIFTING MECHANISM
LIFTED RAIL
6 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
UN
DE
RF
LO
OR
LIF
TIN
G
7 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
TE
CH
NIC
AL
DA
TA
TECHNICAL DATA
ROOF WORKING PLATFORM (RWP) WITH TRAIN DRIVER CATWALK (TDC)
Length of RWP/TDC Approx. 70 m
Width of platform Approx. 1.000 m
Telescoping way of RWP platforms Approx. 450 mm
Length of RWP/TDC-elements 5.000 m
Load capacity RAP/TDC 250 kg /m²
Operating voltage 400 V / 50 Hz
Control voltage 230 V / 24 V DC
Protection IP 54
Working height of RWP +.3.605 m T.O.R.
Working height of TDC Approx. 1.200 m T.O.R.
Clearance between RWP/TDC Train envelope
Load capacity stairways 2 persons at 85 kg plus 100 kg
tools/spares
ELEVATED TRACKS
Length of elevated track: 70 m
Length of track at floor level: 2 x 6 m (at either end of elevated track)
Total length of track: 70 m + 2 x 6 m = 82 m
Run in speed: max .5 km/h
Nominal gauge: T.B.D
Top of rail (T.O.R): ± 0 mm
Elevation of Working floor: -950 mm
Elevation of side steps: -1300 mm
Elevation of pit walkway: -1750 mm
Distance of support columns: ≤1.800 m
Rail track temperature 25°C – 45°C (inside the building)
Rail section: UIC60
Inclination: 0
IMAGE DEPICTING RWP
ELEVATED TRACKS
8 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
CO
MP
ON
EN
TS
DESCRIPTION OF COMPONENTS
ROOF WORKING PLATFORM (RWP) WITH TRAIN DRIVER CATWALK (TDC)
Supporting Structure welded steel construction hinged from the existing supporting structure of the
building
Platform structure hot dipped zinc coated corrugated steel
Side railing On each RWP, side rails are installed in the longitudinal direction (track direction)
for the safety of the working personnel
Movable Fall Down The Fall Down Protection at the front and rear of the RWP is movable in
Protection at front and longitudinal direction
Rear of RAP
Drive Unit It consists of a gear brake motor with drive shaft, pinion and toothed rack. The
ends of the drive shaft are additionally supported by bearings.
Stair cases The RWP is reachable via a staircase placed directly at the side of the columns
of the building structure.
Crane A crane with a capacity of two (2) metric tons including crane runway will be
provided
Supporting Structure welded steel beams with head and
foot plates..
Stairs, Emergency Exits Stairs, made of steel, are provided on
both ends of the pits for entry or exit.
These stairs are designed from floor
level (-0,0 mm) down to the mid
walkways (-1.750 mm).
One stair case to be installed on the
length of the elevated track of 70 m.
ELEVATED TRACK
IMAGE DEPICTING RWP AND TDC
9 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
SUHEB ASGHAR l GROUP-7
2016-2017M.ARCH 1st SEM
WA
SH
PL
AN
TS
TRAIN WASH PLANTSWash plants for complete trains/wagons, installed as Indoor or Outdoor version
CROSSING THROUGH AUTOMATIC WASHING PLANT (TESTING)
BRUSHES ON FUNCTION
SPRINKLER SYSTEM FOR WASHING
AUTOMATIC BRUSHES FOR CLEANING
10 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
SUHEB ASGHAR l GROUP-7
2016-2017M.ARCH 1st SEM
WA
SH
PL
AN
TS
TRAIN WASH PLANTS
11 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
SUHEB ASGHAR l GROUP-7
2016-2017M.ARCH 1st SEM
EL
EV
AT
ED
TR
AC
KS
ELEVATED TRACKS WITH RAIL BRIDGES
Allow a quick change of wheelsets both with and without gear. The transport pallets support in an optimal
way the removal and installation. The change of underfloor components is also possible with great efficiency
IMAGE SHOWING ELEVATED TRACKS AND RAIL BRIDGES
12 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
SUHEB ASGHAR l GROUP-7
2016-2017M.ARCH 1st SEM
WHEELSET CHANGER IN ELEVATED RAIL TRACKS WITH BRIDGES
A combination of wheelset changing system, low-floor lifting truck, body stands and changing cassettes in
the elevated track in connection with bridge elements. This is characterized by a very quick and space-
saving change of complete wheelsets
MOVABLE PLATFORMSAre an integral part of repair workshops in the heavy repair
of wagons and locomotives as well as in long-term
overhaul.
WHEELSET CHANGER LIFTING MECHANISM
MOVABLE PLATFORM FOR TRANSPORTATION MOVABLE PLATFORM FOR TRANSPORTATION
13 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
SUHEB ASGHAR l GROUP-7
2016-2017M.ARCH 1st SEM
EL
EV
AT
ED
TR
AC
KS
14 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
SUHEB ASGHAR l GROUP-7
2016-2017M.ARCH 1st SEM
EL
EC
TR
ICA
L C
OM
PO
NE
NT
S
ELECTRIC COMPONENTS
DESCRIPTION OF ELECTRICAL CONTROL SYSTEMThe control system of the RWP will be activated by a key switch. The RWP system will be interlocked with the
existing security system of the workshop including interlock to existing Overhead Catenary System (OCS). The
telescopic platforms elements move out and in simultaneously. The end positions of the telescopic platforms
are controlled by limit switches and interlocked with the access entrance doors. The telescopic platforms
stop when a connecting block is activated or the telescopic platforms reach the limit switch.
Telescopic platforms touching the train will retract slightly for protection of the connecting blocks.
DESCRIPTION OF KEY EXCHANGE SYSTEMInterlocking with the workshop security system will be achieved by a Key Exchange System.
Only when theOCS is switched off, the grounding key can be removed from the related control cabinet of
the OCS. This key is the plugged into the key exchange system at the control cabinet of the RWP. The RWP
can only be operated when the grounding key is plugged in and turned.
ELECTRICAL DEVICES Gear motor for telescopic platforms (RWP)
Limit switches “backward” (RWP)
Limit switches “forward”
Limit switch for fall protection in parking position
Limit switches for the doors
Master Control Cabinet (MCC)
KEY EXCHANGE BOARD
15 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
DU
BA
I M
ET
RO
D
EP
OT
DUBAI METRO SITE VIEW
BOGIE HOIST WITH JIB CRANE
UNDERFLOOR LIFTING
PLANT
UNDERFLOOR LIFTING SYSTEMS
ULTRASONIC TEST EQUIPMENT
AUTOMATIC WASHING
GANTRY CRANE
AL RASHIDIYA
DUBAI METRO
DEPOT
METRO WORKSHOP
16 MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
CO
MP
AR
ISO
N
12
00
36
00
TYPICAL SECTION OF GYASPUR DEPOT
SKETCH DEPICTING MPWS
Comparison between traditional design and the latest
technology advented design lies in the fact of platforms
being moving and other related easements. Besides use
of material has differed.
MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWAR
2016-2017M.ARCH 1st SEM
BIB
LIO
GR
AP
HY
BIBLIOGRAPHY
• NEURO TECHNOLOGY GmbH WEBSITE• WWW.BBMRAILWAY.COM• WWW.WIKIPEDIA.COM• WWW.GOOGLE.COM
MPWS IN METRO DEPOTSUBMITTED TO-
AR. MOHD FIROZ ANWARPRESENTED BY-
MOHD WAMIQ l GROUP-7
2016-2017M.ARCH 1st SEM
THANK YOU..