Moro Hub, Dubai, UAECase Study
Middle East & Africa
2 DEWA BuildingCase Study
The Project
KingZip Infiniti was key for this project as the client was looking for 3D geometry to ensure a continuous profile and a Dubai Civil Defence approved system.
The KingZip infiniti system from Kingspan Insulated Panels was used to create the roof of the Moro Hub, a new purpose built data centre situated in Dubai marina. The Moro Hub is also the first LEED Platinum data centre in the Middle East.
Moro is a Dubai Energy and Water Authority company (DEWA) and the design on the end of the building has been designed in the shape of a D signifying the link between the two businesses.
KingZip Infiniti was key for this project, to create a highly attractive building 3D geometry was required to ensure there was no compromise to the aesthetics.
A further key feature of using KingZip on this project was the total flexibility to manufacture on site. Both KingZip Linea and Infiniti are manufactured using mobile facilities that can be deployed worldwide. This enables design requirements to be fulfilled from an aesthetic, specification, performance and construction perspective.
3D Sheet
SF333
3D SheetSF333
SF333
3D Sheet
SF333
3 DEWA Building Case Study
Completion 2018
Design, Development & Oger International & Architectural Consultant Citi Consult
Main Contractor Site technology
Installer ALB Middle East
Product KingZip Ininiti 3d Geometric Building Envelope
KingZip Linea Parallel sheet curve Safe pro 2 Kingspan halters, flashings and
tophats used as part of the system
Our proprietary CAD / CAM software ensure direct data transfer from our technical service centre to on site production. This enables details to be changed cost effectively during on-site production.
4 DEWA BuildingCase Study
Fire PerformanceNon-combustible solution. Our systems are fully approved by Dubai Civil Defence (DCD).
KingZip Infiniti
With mobile forming and curving machines, KingZip can be manufactured on-site from 1 metre up to 150 metres, allowing roofs to be constructed using very long sheet lengths, eliminating the need for any endlaps thereby enhancing weatherability and significantly increasing speed of construction.
KingZip
Thermal PerformanceR-value: 3.77 m2K/W. U-value: 0.265 W/m2K
Acoustic PerformanceThe complete building façade construction, including glazing and opaque areas, provides the following minimum sound reduction indices in accordance with BS EN ISO 140-3: 1995.
Octave Band Centre Frequency (Hz)63 125 250 500 1K 2K 4K 8K
Main / Pier Roof Cladding* 18.7 28.1 30.2 37.7 42.1 50.9 57.0 59.1Pier / Pier End Skylights* 18.0 27.0 34.0 39.0 43.0 43.0 48.0 50.0Gatehouse Cladding 16.0 18.0 22.0 30.0 32.0 35.0 35.0 35.0
* Combined performance of roof and adjoining rooflights. (Rooflights / skylights by others).
KingZip Infiniti external weather sheet, 3D curved and tapered
Thermo support halter
Galvanized top hat support bar
Vapor control barrier
Structural liner tray
Mineral fibre insulation
Shape & Form
5 DEWA Building Case Study
KingZip Linea
KingZip Linea external weather sheet, curved and tapered
Thermo support halter
Galvanized top hat support bar
Vapor control barrier
Structural liner tray
Mineral fibre insulation
KingZip Standing Seam System
Shape & Form
6 DEWA BuildingCase Study
360° Service & Support
At Kingspan, we deliver the industry’s largest portfolio of support and services. Our support system has been created to meet the needs of architects, construction teams and investors at each step of the build process. Our support is designed to optimise the performance of their buildings, and is backed by the knowledge and experience that only we can provide.
Creative Architectural Solutions
From the outset, we work closely with each client to provide creative solutions to their specific needs. Our technical team are on hand at every stage to deliver innovative, high-performance architectural solutions for complex and major projects across the globe.With the development of numerous CAD and other software packages, architects and design teams are creating increasingly complex geometric forms to meet demanding aesthetic and performance criteria required by their clients. To support designers, our technical team work with a variety of softwares.
7 DEWA Building Case Study
Design, Technical, Commercial & Construction Assist
Project overviewBrief and scope
Optimised solutionsBuilding code(s) compliance – Structural, thermal, airtightness, acoustic,
fire, durability and other performance requirements – Envelope solutions and structure integration drawings and Natspec system specifications
– Testing, accreditation and certification – Energy efficiency optimisation and measures – Environmental and sustainability ratings
– Cost plan inputs
Procurement & programmeSpecialist installer selection, training and on-site support
– Materials submission – On-site build methods and procedures
Project deliveryKingspan project management and field service support teams
– On- / off-site 2D and 3D CNC manufacturing, logistics and materials delivery programme
Project completionPost-completion documentation and drawings - Kingspan Guarantee
11/2018
Care has been taken to ensure that the contents of this publication are accurate, but Kingspan Insulated Panels and its subsidiary companies do not accept responsibility for errors or for information that is found to be misleading. Suggestions for, or description of, the end use or application of products or methods of working are for information only and Kingspan Insulated Panels and its subsidiaries accept no liability in respect thereof.