1
Overview of inside the cabinet Overview of inside the cabinet (front closed door view) (front open door view) Overview of jumper distribution Overview of inside the cabinet (closed side view) (side view)
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
2
Overview of ACPDB AC phase cable with label Jumper-Feeder with color ring Installation bolt must have
and yellow plat label insulation pad on each cabinet
Include spring washer, and flat washer
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
3
Overview of DCPDB Cabinet Overview of RFC Cabinet (GRFU and CPRI cable laying) Overview of E1 for DDF and IDU Overview of additional equipment inside BTS include its spare at PDU fuse DC
Fuse 160A for Battery power
MCB for IDU and Alarm Box
Fuse 100A for BTS power
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
4
Overview of Inside-outside cable Overview of AC phase cable blocked labeled inside BTS
Overview alarm battery temperature Overview of IDU power
Cable position with label
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
5
Overview of IDU grounding Overview of coax lying with label at BTS body
Overview of CPRI connection at Overview installation antistatic GTMU board with label wrist strap
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
6
Overview of power and signal cable installation power battery directly not over heat ventilation connect to fuse
Overview of battery cabinet Install battery temperature sensor (open side view) on left battery below
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
7
Overview installation cable external Overview install cable external alarm to EMU alarm to Rectifier
Overview installation alarm cable Overview installation alarm cable on ACPDB to EMU on EMU to ACPDB
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
8
Overview of PGND cable at Overview of PGND bar on PGND bus bar Rectifier cabinet
DDF installed between BBU and RTN board. Up middle and right LSA for 3G link connection, bottom middle and right LSA for 2G link
3G Link LSA
2G LINK LSA
PGND
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
9
Overview of Microwave antenna Overview of microwave antenna support Tightly tightened with ODU
Overview of ODU PGND connected Overview of ODU PGND to near metal (tower) connected tightly
MUST scratch the metal paint before connect to tower body
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
10
Overview of coax PGND clip Overview of coax waterproofing tightly connected to bus bar with label Overview installation antenna Overview installation antenna At tower bracket on top pole
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
11
Overview installation antenna Overview installation antenna Bracket on below pole accessories Overview waterproofing antenna Overview waterproofing installation installation with label from feeder to jumper with label
HCPT Project: Model Site BTS Indoor (BTS3900)
Confidentiality Level: For Internal use only
__________________________________________________________________________ Huawei Confidential. No enclosure without permission
12
Overview setting antenna Overview setting antenna Electrical tilting manual tilting Overview installation antenna Overview grounding clip on the waterproofing for grounding clip ground bus bar at tower
Prepared by Antonny Budiman