Minimum Viable Product - Initial Concept to First Build

Post on 15-Jan-2015

495 views 1 download

Tags:

description

Doug Henderson, founder of FrostHub, reviews the best way to approach building your MVP, including the process of achieving the maximum amount of validating learning.

Transcript of Minimum Viable Product - Initial Concept to First Build

Minimum Viable Product

Doug Henderson - FrostHub

Friday, October 25, 13

Lessons Learned

• Difficult to figure out MVP

• We have built some functionality that is not valuable to the users

• Shorten the build-measure-learn cycle

Friday, October 25, 13

Lessons Learned

• Test with people you didn’t know before

• Users will always think they need something more

• Finding the right early adopters

• Continuing the conversations

Friday, October 25, 13

Don’t build this

Friday, October 25, 13

Build

Friday, October 25, 13

Sketching

Friday, October 25, 13

Concept Rev. 1

Friday, October 25, 13

Concept Rev. 2

Friday, October 25, 13

Detailed Design Rev. 1

Friday, October 25, 13

Detailed Design Rev. 4

Friday, October 25, 13

Build

Friday, October 25, 13

Next Steps

• Test with 10 companies

• Measure value

• Learn - tweak existing, add another feature

Friday, October 25, 13

Tools

• Lean Launch Lab

• Lean Startup Machine

• www.startuplessonslearned.com

• www.theleanstartup.com

Friday, October 25, 13