Overview on Mini/Micro Hydro (Technology,Issues and Subsidy Policy 2013)
Er. Pashupati Pd. KhatriElectrical Engineer, Nepal
7/27/2019 Micro Hydro plant components
2/52
Topics
Components of Mini/Micro Hydro Subsidy Policy for Pico/Micro/Mini Hydro
Issues Lesson Learned
2
7/27/2019 Micro Hydro plant components
3/52
Ecological Regions
Indian Plains
Terai Siwal ik h i l l s
Midd le h i l l s
High Mounta ins
High
Himalayas
Tibetan Plateau
67 m amsl
8848 m ams l
7/27/2019 Micro Hydro plant components
4/52
Classification
4
7/27/2019 Micro Hydro plant components
5/52
Micro-Hydro
5
7/27/2019 Micro Hydro plant components
6/52
COMPONENTS OF MINI-MICRO HYDRO POWER PROJECTS
6
7/27/2019 Micro Hydro plant components
7/52
Components of Micro Hydro Project
Civil Components Mechanical Components Electrical Components Transmission/Distribution
Network
7
Electrical + Mechanical
Electro-mechanical Component
7/27/2019 Micro Hydro plant components
8/52
Overview
8
7/27/2019 Micro Hydro plant components
9/52
MHP MHP Components
N
Forbay
T a i l r
a c e
Penstock Pipe
Power House
W E I R
S p i l w
a y
C a n a l
R i v e r / K h o l a
S p i l w
a y
Anchor Block
Anchor Block
Support Pier K h o l s a
C r o s s i n g
H e a d r a c e C a n a l D e s
i l t i n g B
a s i n
Major Civil Com ponents Of M icro Hydro Schem e
Intake
WeirCanal
CrossingForebay
Anchor Block
Support Piers
Power House
Tailrace
Source
Spill way
Trashrack
Spillway
Civil Components of Micro Hydro
7/27/2019 Micro Hydro plant components
10/52
Weir and Intake
10
7/27/2019 Micro Hydro plant components
11/52
Desilting Basin
11
Correct: Low velocity throught width, no turbulence
Incorrect: High velocity in centre stream and turbulence in corners
7/27/2019 Micro Hydro plant components
12/52
Desilting Basin
12
7/27/2019 Micro Hydro plant components
13/52
Canal
13
7/27/2019 Micro Hydro plant components
14/52
Forebay
14
7/27/2019 Micro Hydro plant components
15/52
Support Structures
15
7/27/2019 Micro Hydro plant components
16/52
Powerhouse and Tailrace
16
7/27/2019 Micro Hydro plant components
17/52
Power House & Load Center
17
7/27/2019 Micro Hydro plant components
18/52
MHP MHP Components
400/11000V,15kVA
L.T.LightningArrestor
R
Y
B
N
Forbay
Anchor Block
Expansion Joint
Air Vent Pipe
Support Pire
Anchor Block
Penstock Pipe
ELC Board
Generator
Turbine
Trasrack
Power House
Electro Mechanical Components Of Micro Hydro Scheme
H.T.LineL.T. Line
T.Plate form
MCCB
H.T.LightningArrestor
Drop-outFuse
Transformer(T1)
GroundLevel
DangerPlate
Penstock pipe
TransmissionLine
Transformer
ELC
Earthing
Generator
Turbine
Electro-Mechanical Components of Micro Hydro
7/27/2019 Micro Hydro plant components
19/52
Electro-Mechanical Eqpts.
19
7/27/2019 Micro Hydro plant components
20/52
Turbine
20
7/27/2019 Micro Hydro plant components
21/52
T15, 400 D, x-flow turbine
21
Net Head: 17.5mFlow: 918l/s
Turb.speed : 418rpmWt: 1280 kgPower: 120kW mech.Size: 400d, 800w
Solu Khola MHP, Tuintar (100 kW)
Designed by: United technical SupportService (P.) LtdManufactured by: Balaju Yantra Shala (P.)Ltd
7/27/2019 Micro Hydro plant components
22/52
IGC/ELC/Governor
22
7/27/2019 Micro Hydro plant components
23/52
MHP MHP Components
Transmission/Distribution Network
Powerhouse
Transmission
Line
DistributionLine
Service LineHouse wiring
7/27/2019 Micro Hydro plant components
24/52
Transmission/Distribution
24
7/27/2019 Micro Hydro plant components
25/52
Thalari Gad, Bajhang (65 kW)
25
7/27/2019 Micro Hydro plant components
26/52
Lower Taman Khola, Baglung (100 kW)
26
7/27/2019 Micro Hydro plant components
27/52
MHP MHP Components
CIVIL COMPONENTS
Head (m)
Components of Micro Hydro Project
Village
Discharge (l/s)
7/27/2019 Micro Hydro plant components
28/52
Power Calculation
P = g*Q*H*
Where,P = Power (kilo Watt)g = Acceleration due to gravity (m/sec 2)Q = Discharge (l/sec)
H = Head (meter) = Overall efficiency
28
7/27/2019 Micro Hydro plant components
29/52
29
7/27/2019 Micro Hydro plant components
30/52
Pico Hydro (
7/27/2019 Micro Hydro plant components
31/52
Micro Hydro (10-100 kW)
31
7/27/2019 Micro Hydro plant components
32/52
Mini Hydro (100-1000 kW)
32
7/27/2019 Micro Hydro plant components
33/52
Mini Hydro Connected to Grid
33
7/27/2019 Micro Hydro plant components
34/52
Rehab for damaged projects
34
7/27/2019 Micro Hydro plant components
35/52
Additional Subsidy
35
7/27/2019 Micro Hydro plant components
36/52
Potential for Financing
GoN Subsidy ~ 40% Community Contribution ~ 20%
Potential for Financing ~40% of TPC.
36
7/27/2019 Micro Hydro plant components
37/52
Risks Associated with financing
Collateral Operation & Maintenance
Loan Repayment (less IGAs) Low return
37
7/27/2019 Micro Hydro plant components
38/52
Issues
Transportation: Terrain
Habitat Load Consumption Political and Social Issues
Economical Issues Technical Issues Sustainability Issues
38
7/27/2019 Micro Hydro plant components
39/52
Transportation:
Road access Crossing of Rivers
Delivery of Equipments Increases Project Costs
39
7/27/2019 Micro Hydro plant components
40/52
Terrain
Complicated Terrain Structure Difficulties of Civil Construction
40
7/27/2019 Micro Hydro plant components
41/52
Habitat
Scattered Habitat Large Distances between 2 Habitats.
41
7/27/2019 Micro Hydro plant components
42/52
Political and Social Issues
Water Right Issues. Conflicts in Terai Region.
Lack of Youths in the Villages. Hooking and Political Sheltered. Lack of Security for the Monitoring Staffs.
Absence of Local Development Bodiesrepresentatives.
42
7/27/2019 Micro Hydro plant components
43/52
Economical Issues
Lack of Financial Resources. Bank rarely financed RE.
Syndicate System and Inflation.
43
7/27/2019 Micro Hydro plant components
44/52
Technical Issues
Lack of Trained Operators and SkilledManpower for the Installation.
High Turnover Rate of Youth and Skill
Manpower from villages. Overloading of Transformers and Generators.
Hydrology (Discharge measurement) Low Efficiency of the System. Comparatively weak construction of Civil
components.
Not capable to manufacture turbine (>10044
7/27/2019 Micro Hydro plant components
45/52
Sustainability Issues
Financial transparency in community Lack of we-feeling (ownership) Weak Management Less Tariff Less IG activities/ End Use promotion (low
HDI, lack of local market, inaccessible, low reliability of MHP, high seasonal migration)
Lack of Maintenance Fund Social Inclusion Aspects
45
7/27/2019 Micro Hydro plant components
46/52
Ardali Gad MHP, Achham
46
7/27/2019 Micro Hydro plant components
47/52
Ardali Gad MHP, Achham
47
7/27/2019 Micro Hydro plant components
48/52
7/27/2019 Micro Hydro plant components
49/52
Lesson Learned
49
7/27/2019 Micro Hydro plant components
50/52
Lesson Learned (contd..)
50
7/27/2019 Micro Hydro plant components
51/52
Lesson Learned (contd..)
51
7/27/2019 Micro Hydro plant components
52/52
52