Victoria Guerra - Roadway
Text Box
CONCRETE
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Text Box
OBTAINING ALL
Victoria Guerra - Roadway
Text Box
REQUIRED PERMITS INCLUDING RIGHTS OF ENTRY AND FOR COORDINATING HIS WORK WITH ALL NEARBY BUSINESSES AND NRG STADIUM AS REQUIRED ON THE DRAWINGS.
Victoria Guerra - Roadway
Text Box
HORIZONTAL AND VERTICAL CONTROL INFORMATION SHOWN
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Text Box
PROJ MGR
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Text Box
AT LEAST ONE FLAGMAN WILL BE REQUIRED WHEN THE CONTRACTOR IS WORKING
Victoria Guerra - Roadway
Text Box
IN METRO'S RIGHT-OF-WAY. THE GOVERNING RULE SPECIFIED IN SPECIFICATIONS FOR FLAGMAN SHALL BE MET. THE COST FOR FLAGMEN WILL NOT BE PAID DIRECTLY BUT WILL BE SUBSIDIARY TO PERTINENT BID ITEMS.
Victoria Guerra - Roadway
Text Box
IN THE LAYOUT IS PROVIDED BY METRO.
Victoria Guerra - Roadway
Rectangle
Victoria Guerra - Roadway
Text Box
SEE VOLUME 2 DRAINAGE AND SUBGRADE IMPROVEMENT PROJECT GENERAL NOTES FOR ADDITIONAL METRORAIL NOTES, SURVEY CONTROL NOTES, AND CONTROL POINT DATA.
Victoria Guerra - Roadway
Text Box
9. NOT USED
Victoria Guerra - Roadway
Text Box
THE WORK WILL REQUIRE CLOSING BOTH NORTH AND SOUTH RED LINE
Victoria Guerra - Roadway
Text Box
TRACKS. ONE TRACK MUST REMAIN OPERATIONAL FOR MAINTENANCE ACCESS. ONE TRACK CAN BE SHUT DOWN FOR CONTRACTORS WORK. THE CONTRACTOR'S WORK HOURS WILL BE LIMITED FOR WORK OUTSIDE OF METRO ROW. COORDINATE ALL WORK WITH METRO RAIL OPERATIONS AND CITY OF HOUSTON.
Victoria Guerra - Roadway
Text Box
CONCRETE
Victoria Guerra - Roadway
Text Box
CONCRETE
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Arrow
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Text Box
10'-0" CONCRETE TIE
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Line
Victoria Guerra - Roadway
Text Box
NOTE: CONNECT THE CONCRETE PANEL TO THE CONCRETE TIE IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS.