Post on 10-Feb-2018
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 1/38
Contract Cost Pay Profit Time
Household Goods Facility Venetian Blinds $15 $300 285 0:03:00Household Goods Facility Fresh Vegetables $15 $350 335 0:05:00Household Goods Store Chips $1,800 $2,750 950 0:15:00Household Goods Store Garden Fertilizer $1,010 $2,400 1390 0:30:00
Car Dealership GLONASS Station $2,350 $4,800 2450 1:00:00
Household Goods Facility Business Suits $450 $1,230 780 0:20:00
Household Goods Store
Household
Detergents $60 $1,900 1840 1:00:00
Institute of Thermal Engineering
ThermocapillaryConvection InRocket Fuel $6,700 $13,300 6600 4:00:00
Nuclear Research Center RadioisotopeDrugs $540 $5,400 4860 3:00:00
Ship Engineering OfficeDesign CatamaranDocking Ship $3,000 $12,000 9000 6:00:00
Ship Engineering Office
Design Large Ship
TransportMechanism $5,000 $17,500 12500 ######
Household Goods Facility Electric Kettles $900 $3,500 2600 2:30:00Household Goods Store Kitchenware $425 $4,300 3875 4:00:00Household Goods Store Popcorn $300 $1,250 950 1:00:00
Nuclear Research Center
RadioactiveTransformation ofthe Nucleus $560 $8,560 8000 9:00:00
Assembly Line Solar Cells $1,850 $7,100 5250 6:00:00Research Center Nanotubes $650 $8,300 7650 ######
Nuclear Research Center DiagnosisMethods $6,200 $16,600 10400 ######
Experimental Greenhouse Soil Purification $800 $4,500 3700 5:00:00
Household Goods Facility Bedroom Furniture $1,600 $6,700 5100 7:00:00 Assembly Line Laptops $750 $10,900 10150 ######Household Goods Facility Sporting Goods $500 $5,800 5300 8:00:00 Assembly Line Plasmas Panels $2,100 $9,800 7700 ######
Nuclear Research Center Fast NeutronReactors $10,100 $23,000 12900 ######
Household Goods Store Pastry $1,000 $6,600 5600 ######
Assembly Line Medications $2,500 $9,200 6700 ######
Experimental GreenhouseNew FertilizerTesting $1,800 $6,000 4200 8:00:00
Experimental GreenhouseMist IrrigationSystem $4,500 $15,000 10500 ######
Research Center Microchips $8,800 $23,500 14700 ######Research Center Turbojet Engine $11,500 $33,500 22000 ###### Assembly Line Jewelry $1,000 $10,000 9000 ######Car Dealership Sports Car $9,150 $25,500 16350 ######Household Goods Store Coffee Beans $750 $7,000 6250 ######
Car Dealership Buses $2,800 $13,500 10700 ######Household Goods Facility Motocycles $8,750 $22,500 13750 ######
Research Center NavigationSatellites $16,500 $42,500 26000 ######
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 2/38
Household Goods Facility DVD Games $1,200 $9,900 8700 ######Car Dealership Electric Car $5,500 $15,500 10000 ######Household Goods Facility Tires $3,200 $17,000 13800 ######
Experimental GreenhouseSquareWatermelons $2,500 $11,500 9000 ######
`
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 3/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 4/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 5/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 6/38
Coins/Minute Coins/Hour XP XP/min Level
Facility cost
(coins)
Facility ROI
(Hours)
Facility ROI
(clicks)
$95.00 5,700.00 2 0.67 $15,000 2.63 52.63
$67.00 4,020.00 3 0.60 $10,000 2.49 29.85
$63.33 3,799.88 9 0.60 Level 14 $10,000 2.63 10.53
$46.33 2,780.00 13 0.43 Level 12 $10,000 3.60 7.19
$40.83 2,449.98 30 0.50 $50,000 20.41 20.41
$39.00 2,339.98 6 0.30 $15,000 6.41 19.23
$30.67 1,839.99 15 0.25 Level 6 $10,000 5.43 5.43
$27.50 1,650.00 $50,000 30.30 7.58
$27.00 1,620.00 50 0.28 $250,000 154.32 51.44
$25.00 1,500.00 40 0.11 $60,000 40.00 6.67
$20.83 1,250.00 70 0.12 $60,000 48.00 4.80
$17.33 1,040.00 21 0.14 $15,000 14.42 5.77
$16.15 968.75 33 0.14 Level 5 $10,000 10.32 2.58
$15.83 949.99 14 0.23 $10,000 10.53 10.53
$14.81 888.89 80 0.15 $250,000 281.25 31.25
$14.58 875.00 45 0.13 $20,000 22.86 3.81
$12.75 765.00 71 0.12 $200,000 261.44 26.14
$12.38 742.86 ## 0.12 $250,000 336.54 24.04
$12.33 740.00 40 0.13 $25,000 33.78 6.76
$12.14 728.57 49 0.12 Level 5 $15,000 20.59 2.94
$11.28 676.67 92 0.10 $20,000 29.56 1.97
$11.04 662.50 43 0.09 $15,000 22.64 2.83
$10.69 641.67 70 0.10 $20,000 31.17 2.60
$9.77 586.36 ## 0.10 $250,000 426.36 19.38
$9.33 560.00 45 0.07 $10,000 17.86 1.79
$9.31 558.33 56 0.08 $20,000 35.82 2.99
$8.75 525.00 50 0.10 $25,000 47.62 5.95
$8.75 525.00 80 0.07 $25,000 47.62 2.38
$8.75 525.00 ## 0.08 $200,000 380.95 13.61
$8.73 523.81 ## 0.07 $200,000 381.82 9.09
$8.33 500.00 79 0.07 $20,000 40.00 2.22
$7.57 454.17 ## 0.06 $50,000 110.09 3.06
$7.44 446.43 49 0.06 $10,000 22.40 1.60
$7.43 445.83 95 0.07 $50,000 112.15 4.67
$6.37 381.94 ## 0.06 Level 9 $15,000 39.27 1.09
$6.19 371.43 ## 0.06 $200,000 538.46 7.69
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 7/38
$6.04 362.50 65 0.05 $15,000 41.38 1.72
$5.95 357.14 ## 0.07 $50,000 140.00 5.00
$4.79 287.50 ## 0.04 Level 4 $15,000 52.17 1.09
$4.17 250.00 ## 0.05 $25,000 100.00 2.78
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 8/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 9/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 10/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 11/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 12/38
c Electricity Water Coin Cost Coin Unlock
MB
Cost MB Unlock Build Time Build XP Pop
Countryside Hotel 5 3 — — 7 — ? 80
Villa Colani 40 22 2,070,000 Level 35 8 / 6
Level 15 /
Level 28 17:00:00 4500
Acacia Compound 35 25 850,000 Level 35 4 Level 15 10:00:00 1250
Pegasus Residential Complex 45 40 1,500,000 Level 50 5 Level 30 48:00:00 3500
Hotel "Metropolis" 35 30 700,000 Level 25 4 Level 15 16:00:00 2500
Baroque Villa 25 5 400,000 Level 20 8 / 5
Level 5 /
Level 14 1:00:00 1600
Riviera Compound 40 35 1,350,000 Level 48 5 Level 28 40:00:00 3000
Couple Villa 30 24 1,140,000 Level 43 3 / 2Level 23 /Level 33 8:00:00 2600
Continental Hotel 30 30 600,000 Level 30 5 Level 10 6:00:00 1900
Seaside Hotel 23 8 590,000 Level 29 5 Level 9 24:01:00 1600
Edges Compound 30 25 950,000 Level 39 5 / 3
eve
Level 29 12:00:00 2300
Seventh Heaven Hotel 35 25 550,000 Level 25 11 / 7
eve
Level 15 8:00:00 1750
Lampion Compound 20 15 420,000 Level 22 3 Level 12 8:00:00 1650
Renaissance Hotel 25 30 580,000 Level 26 4 Level 6 12:00:00 1900
Zodiac Compound 35 30 1,000,000 Level 40 6 / 3eveLevel 40 24:00:00 2500
Babylon Compound 30 25 700,000 Level 33 3 Level 18 9:00:00 2000
Wooden House 3 1 2,000 — — — 0:01:00 8
Bosphorus Cottage 4 1 5,000 Level 5 — — 0:03:00 20
Marienhof Cottage 5 1 6,000 Level 6 — — 0:03:00 22
Titanic Hotel 35 20 625,000 Level 35 3 Level 15 6:00:00 1750
Hotel Sputnik 19 11 100,000 Level 10 2 Level 10 3:00:00 175
Premium Apartment Building 15 11 300,000 Level 19 5 Level 9 4:00:00 800
Big Family House 5 3 9,000 Level 5 — — 0:04:00 36
Hotel Azure 20 7 320,000 Level 20 2 Level 10 14:00:00 850
Large Japanese House 8 1 — — 5 — ? 184
Hotel 10 5 10,000 — — — 0:02:00 40
The Victoria House 10 8 190,000 Level 16 2 — 4:00:00 330
Large Wooden House 6 2 16,000 — — — 0:10:00 55
Mansion 11 5 50,000 — 10 Level 15 2:00:00 350
Albion Cottage 6 2 18,000 — 2 Level 8 0:15:00 65
Grand Prix Hotel 9 5 60,000 Level 18 2 Level 14 4:00:00 155
Siena Bungalow 3 1 4,000 — — — 0:04:00 15
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 13/38
A House with a Swimming Pool 9 7 20,000 — 3 Level 7 0:15:00 80
Luxury Apartment Building 25 6 200,000 Level 17 6 / 3
— / Level
10 12:00:00 800
Two-Storey Brick House 6 3 20,000 Level 12 — — 0:10:00 80
Five Star Hotel 3 1 30,000 Level 15 5 — 4:00:00 60
Two-Storey Hostel 15 10 81,000 Level 15 1 — 10:00:00 350
Super Mansion 6 5 70,000 Level 18 3 Level 11 2:00:00 400
Oak Cottage 6 2 17,500 Level 11 — — 0:20:00 70
Tropics Ecohouse 5 5 30,000 Level 9 — — 18:00:00 150
The Islander Hotel 20 15 330,000 Level 22 2 — 16:00:00 550
Townhouse 12 9 100,000 Level 27 3 Level 15 5:00:00 350
Japanese House 6 2 15,000 Level 6 — — 0:08:00 60
Condominium 14 4 80,000 Level 12 4 / 2 — / Level 7 2:00:00 320
Brick House 3 1 5,000 — — — 0:04:00 20
Atlas Cottage 5 2 8,000 Level 7 — — 10:00:00 40
Business Class House 9 3 10,000 — — — 0:05:00 40
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 14/38
XP+ Frequency Pop/Minute
Coin /
(Pop/Min) Coin Pop+
+Unknown 0:05:00 16.00
#VALUE!:notNu
mber:—
#VALUE!:not
Number:—
+Unknown 12:00:00 5.14 402811 1.787439614
50 5:00:00 4.17 204000 1.470588235
+Unknown 25:00:00 3.33 450000 3.333333333 100 10 10
30 4:00:00 3.21 218182 1.1
40 3:00:00 3.06 130909 1.375
+Unknown 17:00:00 2.94 459000 2.222222222 30000 40 1.333333333
+Unknown 8:00:00 2.54 448524 1.070175439
+Unknown 6:00:00 2.50 240000 1.5
+Unknown 7:00:00 2.38 247800 1.694915254
55 6:00:00 2.36 402353 0.894736842
55 5:00:00 2.33 235714 1.272727273
25 6:00:00 2.33 180000 2
80 10:00:00 2.33 248572 2.413793103
150 18:00:00 2.31 432000 2.5
20 12:00:00 2.08 336000 2.142857143
1 0:05:00 2.00 1000 5
2 0:15:00 2.00 2500 167
3 0:20:00 1.75 3429 5.833333333
30 12:00:00 1.74 360000 2
10 3:00:00 1.67 60000 3
+Unknown 4:00:00 1.67 180000 1.333333333
3 0:30:00 1.50 6000 5
+Unknown 20:00:00 1.33 240000 5
+Unknown 4:00:00 1.25
#VALUE!:notNu
mber:—
#VALUE!:not
Number:—
4 1:00:00 1.25 8000 7.5
10 6:00:00 1.17 162857 2.210526316
+Unknown 1:30:00 1.11 14400 6.25
60 8:00:00 1.04 48000 10
6 2:00:00 1.00 18000 6.666666667
15 4:00:00 1.00 60000 4
2 0:20:00 1.00 4000 5
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 15/38
7 4:00:00 0.73 27429 8.75
20 24:00:00 0.69 288000 5
7 2:00:00 0.67 30000 4
12 1:00:00 0.67 45000 1.333333333
15 13:00:00 0.64 126360 6.172839506
+Unknown 8:00:00 0.63 112000 4.285714286
8 4:00:00 0.62 28000 8.571428571
10 7:00:00 0.60 50400 8.333333333
40 15:00:00 0.53 618750 1.454545455
+Unknown 10:00:00 0.50 200000 3
5 6:00:00 0.49 30857 11.66666667
12 24:00:00 0.35 230400 6.25
2 6:00:00 0.21 24000 15
3 7:00:00 0.20 39529 10.625
3 6:00:00 0.11 90000 4
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 16/38
Building Cost Income
Income w/
tax Time
Adjusted
Time
Minute
Income
Hour
Income C
Ise Grand Shrine 4,000,000 0.0 23:59:00 24:14:00 0.00 0.00 #
House of Music 7,300,000 12,000 12,000.0 9:00:00 9:15:00 22.22 1,333.33
Emerald Plaza 4,500,000 13,000 14,950.0 12:00:00 12:15:00 20.76 1,245.83
Tower of Hercules 4,000,000 14,000 14,000.0 16:00:00 16:15:00 14.58 875.00
Taj Mahal 6,000,000 8,000 8,000.0 14:00:00 14:15:00 9.52 571.43
Westminster Abbey 6,300,000 5,500 5,500.0 4:00:00 4:15:00 22.92 1,375.00
Marco Polo Tower 2,800,000 3,680 3,680.0 06:00:00 6:15:00 10.22 613.33
Styx business center 2,500,000 6,000 6,000.0 12:00:00 12:15:00 8.33 500.00
Roman Pantheon 2,200,000 12,500 12,500.0 24:00:00 24:15:00 8.68 520.83
Seaside Summit 1,800,000 3,840 4,416.0 8:00:00 8:15:00 9.20 552.00
Kaleidoscope Hotel 2,000,000 6,000 6,000.0 12:00:00 12:15:00 8.33 500.00
Transportation tower 1,750,000 2,760 2,760.0 6:00:00 6:15:00 7.67 460.00
Colosseum 1,800,000 1,000 1,000.0 2:00:00 2:15:00 8.33 500.00
Acropolis of Athens 1,700,000 4,500 5,175.0 10:00:00 10:15:00 8.63 517.50
Capitol 2,400,000 2,900 2,900.0 4:00:00 4:15:00 12.08 725.00
John Hancock Tower 1,650,000 6,000 6,900.0 14:00:00 14:15:00 8.21 492.86
Madison square garden 1,440,000 2,760 2,760.0 12:00:00 12:15:00 3.83 230.00
Eureka Tower 1,625,000 5,000 5,000.0 12:00:00 12:15:00 6.94 416.67
Turning Torso 1,600,000 3,300 3,300.0 8:00:00 8:15:00 6.88 412.50
Christ the Redeemer 2,300,000 0 0.0 6:00:00 6:15:00 0.00 0.00 #
River Pearl highrise 1,400,000 2,250 2,250.0 6:00:00 6:15:00 6.25 375.00
Sports car dealership 2,000,000 5,200 5,200.0 10:00:00 10:15:00 8.67 520.00
Central Plaza 1,300,000 6,300 6,300.0 18:00:00 18:15:00 5.83 350.00
Burj-al-Khalifa 900,000 1,000 1,000.0 8:00:00 8:15:00 2.08 125.00
Rotterdam Business Center 850,000 1,000 1,150.0 6:00:00 6:15:00 3.19 191.67
kizumi tower 850,000 1,000 1,000.0 9:00:00 9:15:00 1.85 111.11
Volleyball Court 700,000 1,000 1,000.0 10:00:00 10:15:00 1.67 100.00
Wills tower 800,000 2,000 2,000.0 10:00:00 10:15:00 3.33 200.00
Luxury highrise 750,000 3,400 3,400.0 16:00:00 16:15:00 3.54 212.50
Empire State Building 750,000 5,000 5,000.0 24:00:00 24:15:00 3.47 208.33
University 1,000,000 0 0.0 10:00:00 10:15:00 0.00 0.00 #
Commerzbank Tower 625,000 800 800.0 10:00:00 10:15:00 1.33 80.00
Obelisk Tower 750,000 1,250 1,250.0 12:00:00 12:15:00 1.74 104.17
Warsaw Business Center 610,000 1,850 2,128.0 10:00:00 10:15:00 3.55 212.80
Bank 300,000 1,000 1,000.0 8:00:00 8:15:00 2.08 125.00
Theatre 650,000 1,000 1,000.0 12:00:00 12:15:00 1.39 83.33 Pet Dinosaur Shop 75,000 4,500 4,500.0 16:00:00 16: 15: 00 4.69 281.25
Business Center 600,000 2,500 2,500.0 12:00:00 12:15:00 3.47 208.33
Yuksam building 600,000 1,000 1,000.0 14:00:00 14:15:00 1.19 71.43
Church of Saint Pierre de Montmarte 650,000 0 0.0 .001 0:16:26 0.00 0.00 #
Plaza Minion 590,000 2,600 2,600.0 12:00:00 12:15:00 3.61 216.67
Car wash 250,000 400 400.0 8:00:00 8:15:00 0.83 50.00
Matrimandir 1,300,000 0 0.0 14:00:00 14:15:00 0.00 0.00 #
Bank of China 580,000 2,000 2,000.0 10:00:00 10:15:00 3.33 200.00
Canine Center 840,000 1,500 1,725.0 5:00:00 5:15:00 5.75 345.00
Nina tower 900,000 2,500
2,500.0 7:00:00 7:15:00 5.95 357.14
Petronas Towers 1,000,000 3,000 3,000.0 10:00:00 10:15:00 5.00 300.00
Data Center 520,000 1,100 1,100.0 6:00:00 6:15:00 3.06 183.33
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 17/38
Hexagon Skyscraper 425,000 920 1,058.0 14:00:00 14:15:00 1.26 75.57
Atomium 1,100,000 1,550 1,550.0 16:00:00 16:15:00 1.61 96.88
University 500,000 0 0.0 8:00:00 8:15:00 0.00 0.00 #
Spa Salon 470,000 1,380 1,380.0 10:00:00 10:15:00 2.30 138.00
Historical museum 470,000 1,100 1,100.0 10:00:00 10:15:00 1.83 110.00
Spiral Tower 450,000 800 800.0 10:00:00 10:15:00 1.33 80.00
Thai Restaurant 190,000 250 250.0 6:00:00 6:15:00 0.69 41.67
Post office 230,000 300 300.0 6:00:00 6:15:00 0.83 50.00
Volleyball Court 700,000 1,150 1,150.0 8:00:00 8:15:00 2.40 143.75
Archeology museum 440,000 500 500.0 6:00:00 6:15:00 1.39 83.33
Art school 420,000 860 860.0 12:00:00 12:15:00 1.19 71.67
Paintball site 950,000 550 550.0 4:00:00 4:15:00 2.29 137.50
Drugstore 110,000 300 300.0 20:00:00 20:15:00 0.25 15.00
Statue of Liberty 450,000 1,000 1,000.0 24:00:00 24:15:00 0.69 41.67
Pearl of the Emirates hotel 660,000 3,200 3,200.0 14:00:00 14:15:00 3.81 228.57
Polygon Business Center 430,000 640 640.0 8:00:00 8:15:00 1.33 80.00
Bridal salon 160,000 250 250.0 5:00:00 5:15:00 0.83 50.00 City Centre Offices 88,000 250 250.0 14:00:00 14:15:00 0.30 17.86
Tailor shop 100,000 70 70.0 4:00:00 4:15:00 0.29 17.50
Artillery Museum 175,000 300 300.0 3:00:00 3:15:00 1.67 100.00
e 170,000 800 800.0 14:00:00 14:15:00 0.95 57.14
Water Park 360,000 600 600.0 6:00:00 6:15:00 1.67 100.00
Night club 180,000 200 200.0 4:00:00 4:15:00 0.83 50.00
Orchestra Hall 650,000 1,000 1,000.0 6:00:00 6:15:00 2.78 166.67
Beauty Salon 85,000 300 300.0 16:00:00 16:15:00 0.31 18.75
Eiffel Tower 350,000 650 650.0 10:00:00 10:15:00 1.08 65.00
Electronic Store 350,000 1,250 1,250.0 24:00:00 24:15:00 0.87 52.08
Hospital 145,000 0 0.0 5:00:00 5:15:00 0.00 0.00 #
Soccer club office 100,000 0 0.0 5:00:00 5:15:00 0.00 0.00 #
Casino 310,000 250 250.0 6:00:00 6:15:00 0.69 41.67
TV tower 290,000 2,000 2,000.0 24:00:00 24:15:00 1.39 83.33
Stonehenge 330,000 200 264.5 24:00:00 24:15:00 0.18 11.02
Travel Agency 140,000 270 270.0 8:00:00 8:15:00 0.56 33.75
Taipei 101 320,000 500 500.0 8:00:00 8:15:00 1.04 62.50
Star Tower 480,000 350 350.0 4:00:00 4:15:00 1.46 87.50
Skatepark 305,000 400 400.0 8:00:00 8:15:00 0.83 50.00
Coffee Shop 150,000 120 120.0 05:00:00 5:15:00 0.40 24.00
Swimming pool 130,000 250 250.0 16:00:00 16:15:00 0.26 15.63 Amphitheater 300,000 150 150.0 7:00:00 7:15:00 0.36 21.43
Climbing Wall 65,000 100 100.0 15:00:00 15:15:00 0.11 6.67
Center of nuclear medicine 300,000 0 0.0 18:00:00 18:15:00 0.00 0.00 #
Department of motor vehicles 290,000 0 0.0 8:00:00 8:15:00 0.00 0.00 #
Sushi bar 60,000 80 80.0 02:00:00 2:15:00 0.67 40.00
Capital Tower 290,000 700 700.0 12:00:00 12:15:00 0.97 58.33
Wedding Chapel 140,000 0 0.0 8:00:00 8:15:00 0.00 0.00 #
Lawyer's office 130,000 130 130.0 04:00:00 4:15:00 0.54 32.50
Fitness club 75,000 45 45.0 3:00:00 3:15:00 0.25 15.00
Outdoor bicycling arena 420,000 450 450.0 6:00:00 6:15:00 1.25 75.00
District Court 250,000 500 500.0 12:00:00 12:15:00 0.69 41.67
Highrise 300,000 1,100 1,100.0 24:00:00 24:15:00 0.76 45.83
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 18/38
Hanoi Lotte Center 265,000 1,350 1,784.8 7:00:00 7:15:00 4.25 254.97
Zoo 250,000 500 500.0 10:00:00 10:15:00 0.83 50.00
College 255,000 0 0.0 0:01:26 0:16:26 0.00 0.04
Sky arch 950,000 750 750.0 2:00:00 2:15:00 6.25 375.00
Kerry Tower 210,000 220 220.0 16:00:00 16:15:00 0.23 13.75
Lotus Temple 500,000 215 215.0 18:00:00 18:15:00 0.20 11.94
Bookstore 50,000 50 50.0 6:00:00 6:15:00 0.14 8.33
Pet Shop 255,000 368 368.0 5:00:00 5:15:00 1.23 73.60
Confectionery 50,000 60 60.0 8:00:00 8:15:00 0.13 7.50
Advertising agency 100,000 120 120.0 10:00:00 10:15:00 0.20 12.00
Fire station 90,000 0 0.0 0:01:26 0:16:26 0.00 0.00
Supermarket 45,000 200 200.0 8:00:00 8:15:00 0.42 25.00
Laundromat 125,000 500 500.0 12:00:00 12:15:00 0.69 41.67
Service station 170,000 340 340.0 8:00:00 8:15:00 0.71 42.50
Visa Center 65,000 190 190.0 5:00:00 5:15:00 0.63 38.00
Radio station 39,000 250 250.0 15:00:00 15:15:00 0.28 16.67
Biker club 70,000 120 120.0 12:00:00 12:15:00 0.17 10.00 Bistro 40,000 36 36.0 12:00:00 12:15:00 0.05 3.00
Traffic control center 30,000 0 0.0 12:00:00 12:15:00 0.00 0.00 #
Amusement Park 1,800,000 5,000 5,000.0 4:00:00 4:15:00 20.83 1,250.00
Public utility service 50,000 0 0.0 2:00:00 2:15:00 0.00 0.00 #
Shopping Mall Construction 250,000 0 0.0 8:00:00 8:15:00 0.00 0.00 #
Attraction Park 1,800,000 5,000 5,000.0 4:00:00 4:15:00 20.83 1,250.00
Weather bureau 120,000 550 550.0 12:00:00 12:15:00 0.76 45.83
Tuning shop 50,000 200 200.0 2:00:00 2:15:00 1.67 100.00
Naval rehabilitation center 50,000 40 40.0 9:00:00 9:15:00 0.07 4.44
Press center 100,000 60 60.0 12:00:00 12:15:00 0.08 5.00
Central alert system 100,000 0 0.0 0:01:26 0:16:26 0.00 0.04
Coast Guard Administration Building 50,000 0 0.0 23:59:00 24:14:00 0.00 0.00 #
Greenhouse 100,000 0 0.0 4:00:00 4:15:00 0.00 0.00 #
Art gallery 22,000 200 200.0 23:59:00 24:14:00 0.14 8.34
Maritime Emergency Service Center 90,000 140 140.0 8:00:00 8:15:00 0.29 17.50
Bullfighting Arena Construction Site 230,000 0 0.0 4:00:00 4:15:00 0.00 0.00 #
Burrito joint 20,000 150 150.0 8:00:00 8:15:00 0.31 18.75
Gift Shop 80,000 230 230.0 10:00:00 10:15:00 0.38 23.00
Sports shop 40,000 45 45.0 3:00:00 3:15:00 0.25 15.00
Motorcycle school 65,000 120 120.0 10:00:00 10:15:00 0.20 12.00 ons ruc on o e ara se uxury
hotel 450,000 0 0.0 12:00:00 12:15:00 0.00 0.00 #
Youth soccer school 60,000 130 130.0 2:00:00 2:15:00 1.08 65.00
Racecourse construction si te 250,000 0 0.0 5:00:00 5:15:00 0.00 0.00 #
Pub 12,000 18 18.0 20:00:00 20:15:00 0.02 0.90
School 25,000 0 0.0 12:00:00 12:15:00 0.00 0.00 #
Italian cafe 24,000 69 79.4 6:00:00 6:15:00 0.22 13.23
Sports center 200,000 0 0.0 5:00:00 5:15:00 0.00 0.00 #
Office building 11,000 200 200.0 15:00:00 15:15:00 0.22 13.33
Pizzeria 10,000 100 100.0 18:00:00 18:15:00 0.09 5.56
Football stadium 62,500 250 250.0 8:00:00 8:15:00 0.52 31.25
Bowling 20,000 150 150.0 12:00:00 12:15:00 0.21 12.50
Macau Grand Hotel 50 000 0 0 0 7:00:00 7:15:00 0 00 0 00 #
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 19/38
Mini-market 4,500 75 75.0 12:00:00 12:15:00 0.10 6.25
Burger Joint 4,000 5 5.0 12:00:00 12:15:00 0.01 0.42
Movie Theater 15,000 150 150.0 16:00:00 16:15:00 0.16 9.38
Basketball court 3,000 0 0.0 4:00:00 4:15:00 0.00 0.00 #
Cafetaria 5,000 10 10.0 00:05:00 0:20:00 0.50 120.00
Warehouse construction site 30,000 0 0.0 12:00:00 12:15:00 0.00 0.00 #
City hall 25,000 0 0.0 15:00:00 15:15:00 0.00 0.00 #
Tax office 10,000 0 0.0 24:00:00 24:15:00 0.00 0.00 #
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 20/38
ROI
(days)
(days)
(MB) Exp
ROI
(times)
Cost /
Exp Square Pop. increase / Square
####### ######## ######## 4 0.00 20,000
234 10 6,600 608 1,106 9 2.47 12,778
154 51 6,700 301 672 9 2.31 11,367
193 29 650 286 6,154 6 2.43 11,000
445 59 1,500 750 4,000 9 1.06 11,000
203 26 250 1,145 25,200 9 2.55 10,533
198 35 2600 761 1,077 4 2.56 10,000
213 43 2,520 417 992 4 2.08 9,375
178 57 500 176 4,400 4 2.17 9,250
140 39 2550 408 706 4 2.30 8,900
170 43 800 333 2,500 4 2.08 8,750
165 47 3,200 634 547 4 1.92 8,500
169 66 12 1, 800 150,000 6 1.39 8,333
140 41 2,500 329 680 4 2.16 8,250
147 73 180 828 13,333 8 1.51 8,125
142 43 2,450 239 673 4 2.05 7,750
266 92 5,000 522 288 4 0.96 7,725
166 51 2,400 325 677 4 1.74 7,625
167 52 1,440 485 1,111 4 1.72 7,500
####### ######## 2,200 ######## 1,045 6 0.00 7,500
162 58 450 622 3,111 4 1.56 7,000
164 49 2,800 385 714 6 1.44 6,667
157 60 80 206 16,250 4 1.46 6,500
309 172 16 900 56,250 4 0.52 5,750
192 113 1,700 739 500 4 0.80 5,625
328 193 960 850 885 4 0.46 5,625
299 214 1,650 700 424 4 0.42 5,575
171 128 2,900 400 276 4 0.83 5,500
149 100 1,800 221 417 4 0.89 5,375
152 121 1,500 150 500 4 0.87 5,250
####### ######## 1,050 ######## 952 6 0.00 5,000
334 320 450 781 1,389 4 0.33 4,925
306 204 4,000 600 188 4 0.43 4,875
122 60 1,810 287 337 4 0.89 4,850
103 69 1,400 300 214 2 1.04 4,750
332 255 900 650 722 4 0.35 4,750
11 30 200 17 375 2 2.34 4,650
123 102 180 240 3,333 4 0.87 4,625
356 297 50 600 12,000 4 0.30 4,625
####### ######## 800 ######## 813 4 0.00 4,625
116 98 900 227 656 4 0.90 4,500
215 344 770 625 325 2 0.42 4,500
####### ######## 1,950 ######## 667 9 0.00 4,444
124 107 275 290 2,109 4 0.83 4,375
107 51 2,100 487 400 6 0.96 4,333
109 73 6,400 360 141 6 0.99 4,333
142 85 3,190 333 313 6 0.83 4,333
123 71 425 473 1,224 4 0.76 4,250
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 21/38
239 168 1,420 402 299 4 0.31 4,175
481 218 900 710 1,222 9 0.18 4,167
####### ######## 270 ######## 1,852 6 0.00 4,167
145 93 1,360 341 346 4 0.58 4,125
182 155 70 427 6,714 4 0.46 4,125
240 267 280 563 1,607 4 0.33 4,125
198 417 2,400 760 79 2 0.35 4,000
200 174 750 767 307 2 0.42 4,000
209 149 2,000 609 350 6 0.40 4,000
229 260 650 880 677 4 0.35 4,000
249 119 35 488 12,000 4 0.30 4,000
306 258 1,300 1,727 731 9 0.25 4,000
309 844 1,750 367 63 1 0.25 4,000
455 404 20 450 22,500 4 0.17 4,000
122 111 230 206 2,870 6 0.63 3,917
231 269 300 672 1,433 4 0.33 3,900
140 263 210 640 762 2 0.42 3,850 209 475 620 352 142 1 0.30 3,800
253 506 1,700 1,429 59 1 0.29 3,800
79 316 1,250 583 140 2 0.83 3,750
126 445 1,450 213 117 2 0.48 3,500
156 434 220 600 1,636 4 0.42 3,500
159 266 500 900 360 2 0.42 3,500
169 391 800 650 813 6 0.46 3,500
192 451 510 283 167 1 0.31 3,500
230 197 350 538 1,000 4 0.27 3,500
283 243 5,650 280 62 4 0.22 3,500
####### ######## 585 ######## 248 2 0.00 3,500
####### ######## 450 ######## 222 1 0.00 3,500
323 1,042 1,700 1,240 182 4 0.17 3,400
147 303 90 145 3,222 4 0.35 3,375
1,261 1,146 3,200 1,248 103 4 0.05 3,350
178 382 1,200 519 117 2 0.28 3,250
220 344 90 640 3,556 4 0.26 3,250
243 304 300 1,371 1,600 6 0.24 3,250
262 516 2,200 763 139 4 0.21 3,250
273 365 180 1,250 833 2 0.20 3,250
352 542 1,800 520 72 2 0.13 3,250 604 1,250 2,000 240 4 0.09 3,200
413 635 156 650 417 1 0.11 3,150
####### ######## 2,100 ######## 143 4 0.00 3,125
####### 1,350 ######## 215 4 0.00 3,100
70 469 200 750 300 1 0.67 3,050
211 365 820 414 354 4 0.24 3,050
####### ######## 160 ######## 875 2 0.00 3,050
177 272 583 1,000 223 2 0.27 3,000
226 2,450 1,667 31 1 0.25 3,000
243 289 720 933 583 6 0.21 3,000
255 408 650 500 385 4 0.17 3,000
276 459 410 273 732 4 0.19 3,000
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 22/38
45 51 850 148 312 4 1.06 2,900
214 342 325 500 769 4 0.21 2,750
####### 3,425,000 1,200 ######## 213 4 0.00 2,750
119 88 1,400 1,267 679 8 0.78 2,625
646 923 4,250 955 49 4 0.06 2,625
1,768 2,122 40 2,326 12,500 4 0.05 2,625
260 1,400 1,000 36 1 0.14 2,600
152 178 810 693 315 4 0.31 2,558
286 573 660 833 76 1 0.13 2,500
356 712 1,400 833 71 2 0.10 2,500
####### ######## 750 ######## 120 2 0.00 2,325
77 800 225 56 1 0.42 2,300
128 204 2,500 250 50 2 0.35 2,250
172 760 500 224 4 0.18 2,125
75 345 1,300 342 50 2 0.32 2,000
99 508 156 156 250 1 0.28 2,000
298 1,700 583 41 2 0.08 2,000 567 1,720 1,111 23 1 0.05 2,000
####### ######## 800 ######## 38 4 0.00 2,000
64 11 1,250 360 1,440 12 1.74 1,667
####### ######## 240 ######## 208 6 0.00 1,667
####### ######## 1,700 ######## 147 6 0.00 1,667
64 11 4,000 360 450 12 1.74 1,550
111 278 650 218 185 4 0.19 1,500
23 94 3,500 250 14 2 0.83 1,250
482 964 210 1,250 238 2 0.04 1,250
851 1,701 1,900 1,667 53 4 0.02 1,250
####### 3,425,000 180 ######## 556 4 0.00 1,250
####### ######## 1,200 ######## 42 4 0.00 1,250
####### 220 ######## 455 4 0.00 1,163
111 1,010 2,600 110 8 1 0.14 1,150
221 491 1,060 643 85 4 0.07 1,125
####### ######## 6,500 ######## 35 9 0.00 1,111
46 20 133 1,000 1 0.31 1,050
149 1,500 348 53 4 0.10 1,050
120 602 500 889 80 2 0.13 1,000
231 712 950 542 68 4 0.05 925
####### ######## 800 ######## 563 16 0.00 781
43 144 160 462 375 6 0.18 750
####### ######## 220 ######## 1,136 15 0.00 667
563 360 667 33 1 0.02 650
####### 48 ######## 521 2 0.00 650
79 2,000 302 12 2 0.11 558
####### ######## 520 ######## 385 9 0.00 556
35 635 45 55 244 1 0.22 550
76 360 100 28 1 0.09 550
86 550 2,000 250 31 6 0.09 533
68 1,600 133 13 2 0.10 525
####### ######## 1 350 ######## 37 9 0 00 517
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 23/38
31 18 60 250 1 0.10 275
408 1,400 800 3 1 0.01 250
68 2,150 100 7 4 0.04 200
####### 12 ######## 250 1 0.00 150
7 250 500 20 2 0.25 140
####### ######## 18 ######## 1,667 1 0.00 0
####### ######## 90 ######## 278 4 0.00 0
####### ######## 500 ######## 20 1 0.00 0
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 24/38
sse ame eve op. os op.ote or c amp ons p atten ees , , . .
, , . .xot c ar en , , . .egapo s uantums an u , , . .ea t oo , , . .
, , . .ea er ureau , , . .ater ar , , . .
out soccer sc oo , , . .are ouse construct on s te , . .sa enter , , . .n vers y , . .rave agency , . .un ng s op , . .ra c contro center , , . .orc ower , , . .enn s court , . .a es auran , . .
a pe , , . .a or s op , . .w mm ng poo , . .us ar , . .upermar et , . .tar ower , , . .tone enge , , . .. ar s as ca , , . .
por s ar , , . .por s cen er , , . .ports s op , , . .ma apanese ouse , , . .occer c u o ce , , . .atepar , , . .opp ng ma cons ruc on s e , , . .
even eaven o e , , . .erv ce s a on , , . .ut oor cyc ng arena , . .a nt a s te , , . .at os unga ow , , . .et nosaur op , , . .zzer a , , . .o ce s a on , , . .ress cen er , , . .u , , . .u c ut ty serv ce , , . .acecourse construct on s te , , . .a o stat on , , . .oc e e er en er , , . .c oo , , . .eas e o e , , . .
Office building 18 3,150 $65,000.00 48.462g c u , , . .ava re a a on cen er , , . .us c sc oo , , . .
ov e eater , , . .n -mar et , , . .otorcyc e sc oo , , . .ar t me mergency erv ce enter , , . .
o us emp e , , . .awyer s o ce , , . .aun roma , , . .amp on compoun , , . .erry ower , , . .apanese ouse , , . .ta an ca eter a , , . .s an , , . .o e e ropo s , , . .
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 25/38
nsurance company , , . .ote , , . .osp ta , , . .or zon es ent a omp ex , , . .reen ouse , , . .ano o e en er , , . .s or ca useum , , . .
op , , . .as stat on , , . .
oot a sta um , , . .or st op , , . .tness c u , , . .
, , . .str ct ourt , , . .rugstore , , . .e ng ape , , . .epartment o motor ve c es , , . .no op a ouven r op , , . .no op a ouven r op , , . .ons ruc on o e ara se uxury o e , , . .oup e a , , . .o ege , , . .o ee op , , . .o ee ouse , , . .oas uar m n s ra on u ng , , . .
y rary , , . .m ng a , , . .ty a , , . . entra a ert system , , . .enter o nuc ear me c ne , , . .as no , , . .ar was , , . .a e er a , , . .urger o n , , . .u g ng rena ons ruc on e , , . .r a sa on , . .oo store , . .ow ng , . .stro , , . .ave es en a omp ex , , . .
er c u , , . .ern o us ness en er , . .eauty a on , , . .rt ery useum , . .rt sc oo , . .rt a ery , , , . .
ver semen agency , . .mp ea er , . .rc aeo ogy museum , . .
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 26/38
. .
. .
. ..
. .
. .
. .
. .
. .. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
0.05 0.05. .. .. .
. .. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 27/38
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
. .
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 28/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 29/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 30/38
Building
Electrici
ty Water Coin Cost
Coin
Unlock
MB
Cost MB Unlock
Countryside Hotel 5 3 — — 7 —
Gemini Hotel 21 13 2,250,000 ? 8 ?
Villa Colani 40 22 2,070,000 Level 35 8 / 6 Level 15 / Level 28
The Dream Island residential complex unknown unknownreward for lost island
quest - - - Acacia Compound 35 25 850,000 Level 35 4 Level 15Titanic Hotel 35 20 625,000 Level 35 3 Level 15
Pegasus Residential Complex 45 40 1,500,000 Level 50 5 Level 30 Baroque Villa 25 5 400,000 Level 20 8 / 5 Level 5 / Level 14
Riviera Compound 40 35 1,350,000 Level 48 5 Level 28
Continental Compound 40 35 1,200,000 Level 45 5 / 3 Level 25 / Level 35
Couple Villa 30 24 1,140,000 Level 43 3 / 2 Level 23 / Level 33
Continental Hotel 30 30 600,000 Level 30 5 Level 10
Seaside Hotel 23 8 590,000 Level 29 5 Level 9Edges Compound 30 25 950,000 Level 39 5 / 3 Level 19 / Level 29Seventh Heaven Hotel 35 25 550,000 Level 25 11 / 7 Level 5 / Level 15Lampion Compound 20 15 420,000 Level 22 3 Level 12Renaissance Hotel 25 30 580,000 Level 26 4 Level 6
Babylon Compound 30 25 700,000 Level 33 3 Level 18Wooden House 3 1 2,000 — — —
Bosphorus Cottage 4 1 5,000 Level 5 — —
Marienhof Cottage 5 1 6,000 Level 6 — —
Hotel Sputnik 19 11 100,000 Level 10 2 Level 10
Premium Apartment Building 15 11 300,000 Level 19 5 Level 9Big Family House 5 3 9,000 Level 5 — —
Hotel Azure 20 7 320,000 Level 20 2 Level 10Hotel 10 5 10,000 — — —
Large Japanese House 8 1 — — 5 —
The Victoria House 10 8 190,000 Level 16 2 —
Large Wooden House 6 2 16,000 — — —
Mansion 11 5 50,000 — 10 Level 15 Albion Cottage 6 2 18,000 — 2 Level 8
Siena Bungalow 3 1 4,000 — — —
Bungalow 3 1 3,000 — — —
Apartment Building 20 5 40,000 Level 10 — —
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 31/38
Suburban Condo 16 10 100,000 Level 16 2 Level 6 A House with a Swimming Pool 9 7 20,000 — 3 Level 7Luxury Apartment Building 25 6 200,000 Level 17 6 / 3 — / Level 10
Two-Storey Brick House 6 3 20,000 Level 12 — —
Five Star Hotel 3 1 30,000 Level 15 5 —
Two-Storey Hostel 15 10 81,000 Level 15 1 —
Super Mansion 6 5 70,000 Level 18 3 Level 11Oak Cottage 6 2 17,500 Level 11 — —
Tropics Ecohouse 5 5 30,000 Level 9 — —
The Islander Hotel 20 15 330,000 Level 22 2 —
Townhouse 12 9 100,000 Level 27 3 Level 15Japanese House 6 2 15,000 Level 6 — —
Small Japanese House 4 1 5,000 — — —
Condominium 14 4 80,000 Level 12 4 / 2 — / Level 7
Brick House 3 1 5,000 — — —
Atlas Cottage 5 2 8,000 Level 7 — —
Business Class House 9 3 10,000 — — —
Zodiac Compound 35 30 1,000,000 Level 40 6 / 3 Level 30 / Level 40
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 32/38
Build Time
Build
XP
Population
+ XP+ Frequency Pop/Minute Pop/hour
? 80 80+Unkno
wn 0:05:00 16.00 960.00 #VALUE! #VALUE!14:00:00 2800 5800 ? 12:00:00 8.06 483.33 4,655.17 #VALUE!
17:00:00 4500 3700+Unkno
wn 12:00:00 5.14 308.33 6,713.51 #VALUE!
? 915
+Unkno
wn 3:00:00 5.08 305.00 #VALUE!10:00:00 1250 1250 50. 5:00:00 0.167 4.17 250.00 3,400.00 0.04
6:00:00 1750 1250 30. 6:00:00 0.083 3.47 208.33 3,000.00 0.024
48:00:00 3500 5000+Unkno
wn 25:00:00 3.33 200.00 7,500.00 #VALUE!
1:00:00 1600 550 40. 3:00:00 0.222 3.06 183.33 2,181.82 0.0727273
40:00:00 3000 3000+Unkno
wn 17:00:00 2.94 176.47 7,650.00 #VALUE!
36:00:00 2800 4000+Unkno
wn 24:00:00 2.78 166.67 7,200.00 #VALUE!
8:00:00 2600 1220+Unkno
wn 8:00:00 2.54 152.50 7,475.40 #VALUE!
6:00:00 1900 900+Unkno
wn 6:00:00 2.50 150.00 4,000.00 #VALUE!
24:01:00 1600 1000+Unkno
wn 7:00:00 ##### 2.38 142.86 4,130.00 #VALUE!12:00:00 2300 850 55. 6:00:00 0.153 2.36 141.67 6,705.88 0.0647059
8:00:00 1750 700 55. 5:00:00 0.183 2.33 140.00 3,928.57 0.07857148:00:00 1650 840 25. 6:00:00 0.069 2.33 140.00 3,000.00 0.0297619
12:00:00 1900 1400 80. 10:00:00 0.133 2.33 140.00 4,142.86 0.0571429
9:00:00 2000 1500 20. 12:00:00 0.028 2.08 125.00 5,600.00 0.01333330:01:00 8 10 1. 0:05:00 0.200 2.00 120.01 16.67 0.10:03:00 20 30 2. 0:15:00 0.133 2.00 120.00 41.67 0.06666670:03:00 22 35 3. 0:20:00 0.150 1.75 105.00 57.14 0.08571433:00:00 175 300 10. 3:00:00 0.056 1.67 100.00 1,000.00 0.0333333
1.67 100.00 800.00 #DIV/0!
4:00:00 800 400+Unkno
wn 4:00:00 1.67 100.00 3,000.01 #VALUE!0:04:00 36 45 3. 0:30:00 0.100 1.50 90.00 100.00 0.0666667
14:00:00 850 1600+Unkno
wn 20:00:00 1.33 80.00 4,000.00 #VALUE!0:02:00 40 75 4. 1:00:00 0.067 1.25 75.00 133.33 0.0533333
? 184 300+Unkno
wn 4:00:00 1.25 75.00 #VALUE! #VALUE!4:00:00 330 420 10. 6:00:00 0.028 1.17 70.00 2,714.29 0.0238095
0:10:00 55 100+Unkno
wn 1:30:00 1.11 66.67 240.00 #VALUE!2:00:00 350 500 60. 8:00:00 0.125 1.04 62.50 800.00 0.120:15:00 65 120 6. 2:00:00 0.050 1.00 60.00 300.00 0.05
0:04:00 15 20 2. 0:20:00 0.100 1.00 60.00 66.67 0.10:03:00 12 15 2. 0:15:00 0.133 1.00 60.00 50.00 0.13333330:20:00 160 350 10. 6:00:00 0.028 0.97 58.33 685.71 0.0285714
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 33/38
3:00:00 350 450+Unkno
wn 10:00:00 0.75 45.00 2,222.22 #VALUE!0:15:00 80 175 7. 4:00:00 0.029 0.73 43.75 457.14 0.04
12:00:00 800 1000 20. 24:00:00 0.014 0.69 41.67 4,800.00 0.020:10:00 80 80 7. 2:00:00 0.058 0.67 40.00 500.00 0.08754:00:00 60 40 12. 1:00:00 0.200 0.67 40.00 750.01 0.3
10:00:00 350 500 15. 13:00:00 0.019 0.64 38.46 2,106.00 0.03
2:00:00 400 300
+Unkno
wn 8:00:00 0.63 37.50 1,866.66 #VALUE!0:20:00 70 150 8. 4:00:00 0.033 0.62 37.50 466.67 0.0533333
18:00:00 150 250+Unkno
wn 7:00:00 0.60 35.71 840.00 #VALUE!16:00:00 550 480 40. 15:00:00 0.044 0.53 32.00 10,312.50 0.0833333
5:00:00 350 300+Unkno
wn 10:00:00 0.50 30.00 3,333.34 #VALUE!0:08:00 60 175 5. 6:00:00 0.014 0.49 29.17 514.29 0.02857140:04:00 20 55 4. 2:00:00 0.033 0.46 27.50 181.82 0.07272732:00:00 320 500 12. 24:00:00 0.008 0.35 20.83 3,840.00 0.0240:04:00 20 75 2. 6:00:00 0.006 0.21 12.50 400.00 0.0266667
10:00:00 40 85
+Unkno
wn 7:00:00 0.20 12.14 658.82 #VALUE!0:05:00 40 40 3. 6:00:00 0.008 0.11 6.67 1,500.00 0.075
#DIV/0!#DIV/0!
24:00:00 2500 2500 150. 18:00:00 0.139 2.31 138.89 7,200.00 0.06#DIV/0!
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 34/38
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 35/38
Building Coin Cost MB Cost Build Time Population+ XP+ Frequency xp/min
Gemini Hotel 2,250,000 8 14:00:00 5800 ? 12:00:00
Villa Colani 2,070,000 8 / 6 17:00:00 3700
+Unknow
n 12:00:00
Titanic Hotel 625,000 3 6:00:00 1250 30. 6:00:00 0.083
Acacia Compound 850,000 4 10:00:00 1000 50. 5:00:00 0.167
Pegasus Residential Complex 1,500,000 3 48:00:00 5000
+Unknow
n 25:00:00Hotel "Metropolis" 700,000 4 16:00:00 770 30. 4:00:00 0.125
Riviera Compound 1,350,000 5 40:00:00 3000
+Unknow
n 17:00:00
Continental Compound 1,200,000 5 / 3 36:00:00 4000
+Unknow
n 24:00:00
Continental Hotel 600,000 5 6:00:00 900
+Unknow
n 6:00:00
Seaside Hotel 590,000 5 24:01:00 1000
+Unknow
n 7:00:00 ######
Edges Compound 950,000 5 / 3 12:00:00 850 55. 6:00:00 0.153Seventh Heaven Hotel 550,000 11 / 7 8:00:00 700 55. 5:00:00 0.183
Lampion Compound 420,000 3 8:00:00 840 25. 6:00:00 0.069
Renaissance Hotel 580,000 4 12:00:00 1400 80. 10:00:00 0.133
Zodiac Compound 1,000,000 6 / 3 24:00:00 2500 150. 18:00:00 0.139
Babylon Compound 700,000 3 9:00:00 1500 20. 12:00:00 0.028
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 36/38
Pop/Minute Pop/Hour Coin/Pop(m)
8.06 483 279,310
5.14 308 402,811
3.47 208 180,000
3.33 200 255,000
3.33 200 450,0003.21 192 218,182
2.94 176 459,000
2.78 167 432,000
2.50 150 240,000
2.38 143 247,800
2.36 142 402,3532.33 140 235,714
2.33 140 180,000
2.33 140 248,572
2.31 139 432,000
2.08 125 336,000
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 37/38
0Time adjustment (average time before new production is started) 0:15:00Value of a MB (megabuck) in coins 100000Income tax (can be set in Tax Office building) 0ROI stands for Return On Investment
7/22/2019 Megapolis Infrastructure Buildings
http://slidepdf.com/reader/full/megapolis-infrastructure-buildings 38/38
Timestamp Untitled Question