Presentation Outline
Introduction to MIA Program Overview and History Module 1: Review of Form A Instructions Definitions Guidance/Best Practices Significant Updates Naming Conventions for Annular Spaces Module 2: Form A Form A Overview Form A Use with Examples Form A 2-Year Example and Data Transfers Module 3: Form B Form B Overview Form B Use with Examples Form B Data Transfers
Module 2: Form A
Form A Overview Only compatible with Microsoft Excel versions
2007 or later Color Coding of Cells:
YELLOW-SHADED boxes MUST BE COMPLETED
BLUE-SHADED boxes are OPTIONAL INSPECTION COMPONENTS or used to ACTIVATE OTHER FUNCTIONS
WHITE-SHADED boxes are AUTO-POPULATED
HATCHED boxes are NOT RELEVANT FOR THE WELL BEING EVALUATED
Allows up to 250 wells to be monitored for four consecutive quarters
Module 2: Form A
Form A Overview Well construction details only need to be entered
ONCE; information is retained when creating templates for subsequent years
Module 2: Form A
Form A Overview If conditions at the well remain unchanged
between quarters, or are mostly static, data can be automatically transferred to the most recent quarter and manual edits made as needed
Module 2: Form A
Form A Overview If well is set up incorrectly, the RESET SECTION
feature allows the user to set up the well a second time
WARNING:
THIS FEATURE WILL DELETE ALL INFORMATION ENTERED FOR THE WELL!
Module 2: Form A
Form A Overview Duplicate API numbers are automatically flagged in
Form A and should be corrected
Module 2: Form A
Form A Overview When all quarterly inspection data have been
entered for the year and any duplicate API numbers are corrected, a data summary sheet should be created for submittal to DEP
Module 2: Form A
Form A Overview To create a template for receiving the following
year’s inspection data, answer question 26. “Y” and select button 27.
Module 2: Form A
Form A Use with Examples LENCER NO. 10: Oil well equipped only
with freshwater casing Oil is produced through rod and tubing
assembly and surface casing is vented to the atmosphere, but not readily accessible using an echo meter or fluid-level monitoring equipment
Module 2: Form A
OIL
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
Section 13: Water Level
or Average Daily
Pumping Time or
Produced Water Quality
in the Field or Average
Daily Pumping Time/Volume
Section 14: Primary
Production Annulus
“S/C”: Shut-in (pressure) or Venting (flow rate)
Module 2: Form A
Form A Use with Examples WELSH NO. 3: 2-String combo well Oil is produced through rod and tubing
assembly and annular gas is produced inside of the surface casing and outside of the production string
Open-hole completion and production
string is set on a packer
Module 2: Form A
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
OIL
GAS
Section 13: Annular
Production Gas
Pressure (measured
outside production
casing and inside surface casing “P”)
Module 2: Form A
Form A Use with Examples CATALANO 2H: 4-String gas well in coal
area
Gas is produced through tubing assembly and coal protective casing is shallower than surface casing
Cased-hole completion and production string is anchored with cement below intermediate casing shoe
Module 2: Form A
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
COAL
Section 13: Primary
Production Gas
Pressure (measured
inside primary production casing)
Section 14: Primary
Production Annulus
“P” (intermediate x
production) Shut-in
(pressure) or Venting (Flow Rate)
GAS
Module 2: Form A
Form A Use with Examples SWANK 4H: 3-String gas well with
annular production
Primary production is through tubing assembly and annular gas is produced inside of intermediate casing
Cased-hole completion and production string is anchored with cement below intermediate casing shoe
Module 2: Form A
Section 13: Primary
Production Gas
Pressure (measured
inside primary production casing)
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
Section 13: Annular
Production Gas Pressure
(measured outside
production casing and
inside intermediate casing “P”)
GAS
GAS
Module 2: Form A
Form A Use with Examples COSTELLO NO. 1: Combo well equipped
only with freshwater casing
Oil is produced through rod and tubing assembly and gas is produced outside tubing and inside surface casing
Fluid levels readily accessible using echo meter
Module 2: Form A
OIL
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
Section 13: Water Level
or Average Daily
Pumping Time/Volume
or Produced Water
Quality Using Field Meter
Section 14: Primary
Production Annulus
“S/C”: Shut-in (pressure) or Venting (flow rate)
Section 13: Primary
Production Gas
Pressure (measured
inside primary production casing)
GAS
Module 2: Form A
Form A Use with Examples JANKURA 7H: 3-string oil well
Cased-hole completion with oil produced
using rod and tubing assembly
Production annulus is under the wellhead
All other casing strings cut off and cellar filled with gravel
Module 2: Form A
OIL
Sections 18 and 19:
Confirm safe venting
(if escaping gas is
noted) and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
Section 14: Primary
Production Annulus
“P” (intermediate x
production) Shut-in
(pressure) or Venting (Flow Rate)
Module 2: Form A
Form A Use with Examples RITZER 5H: 3-String gas well with
primary production through tubing assembly and annular gas is produced inside of intermediate casing
Cased-hole completion and production string is anchored with cement below intermediate casing shoe
Production annulus is under the
wellhead
All other casing strings cut off and cellar filled with gravel
Module 2: Form A
GAS
Sections 18 and 19:
Confirm safe venting
(if escaping gas is
noted) and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
Section 14: Primary
Production Annulus
“P” (intermediate x
production) Shut-in
(pressure) or Venting (Flow Rate)
Section 13: Primary
Production Gas
Pressure (measured
inside primary production casing)
Module 2: Form A
Form A Use with Examples Beattie No. 99: Turn-of-the-20th century
gas well with no well record available
Only production casing accessible above grade; any other casing, if present outside wellhead and buried below grade
Module 2: Form A
GAS
Section 13: Primary
Production Gas
Pressure (measured
inside primary production casing)
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
DID I MENTION?
SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS SAVE/CREATE BACKUPS
Module 2: Form A
Form A Two-Year Example and Data Transfers Operator A has two wells in their inventory The first well, the Welsh No. 3, has been in
production for several years
The second well, the Swank 4H, was brought on-line during the third quarter of 2013
Module 2: Form A
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
OIL
GAS
Section 13: Annular
Production Gas
Pressure (measured
outside production
casing and inside surface casing “P”)
Module 2: Form A
Section 13: Primary
Production Gas
Pressure (measured
inside primary production casing)
Sections 18 and 19:
Confirm safe venting (if
escaping gas is noted)
and complete corrosion inspection
Sections 15, 16, and 17:
Inspect for surface
discharges/annular flows of
gas, liquid hydrocarbons, or non-freshwater
Section 13: Annular
Production Gas Pressure
(measured outside
production casing and
inside intermediate casing “P”)
GAS
GAS
Module 2: Form A
Form A Two-Year Example and Data Transfers Now that the well integrity data are
entered, Operator A would like to create a data summary sheet, create a template for next year, and enter the quarterly data for the first quarter of 2014
Module 2: Form A
Form A Two-Year Example and Data Transfers Creating a data summary sheet and a
report template for next year can be done in 4 easy steps
1 2 3 4
Module 2: Form A
Form A Two-Year Example and Data Transfers Begin next year’s inspections
Module 2: Form A
Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from
the previous inspection year to first quarter of the current inspection year
1
Module 2: Form A
Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from
the previous inspection year to first quarter of the current inspection year
2
Module 2: Form A
Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from
the previous inspection year to first quarter of the current inspection year
3
Module 2: Form A
Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from
the previous inspection year to first quarter of the current inspection year
4
Module 2: Form A
Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from
the previous inspection year to first quarter of the current inspection year
5
Module 2: Form A
Form A Two-Year Example and Data Transfers Steps for transferring fourth quarter from
the previous inspection year to first quarter of the current inspection year
6