M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon...

Post on 21-Dec-2015

212 views 0 download

Tags:

Transcript of M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon...

M2: Team Paradigm

:: Milestone 6 Update 2-D Discrete Cosine Transform

Group M2:Tommy Taylor Brandon HsiungChangshi XiaoBongkwan Kim

Project Manager: Yaping Zhan

M2: Team Paradigm

Team Paradigm

M2: Team Paradigm

Why were are here today...

: We simulated our extracted versions of the layout with capacitances and resulted in POOR signal transfers.

: To show a more precise version of our overall layout

M2: Team Paradigm

Results

: Unfortunately we were not able to figure out the problem just yet

: But we will show you what little progress we tried to make

M2: Team Paradigm

Real Results

: The low output results were caused simply by not adding vdd! and gnd! pins.

: Now everything is correct!

M2: Team Paradigm

1D-DCT Floorplan

M2: Team Paradigm

2D-DCT

M2: Team Paradigm

FlipFlop Propogation Delay

M2: Team Paradigm

FlipFlop Rise-Time

M2: Team Paradigm

FlipFlop Fall-Time

M2: Team Paradigm

Mirror Adder Propogation Delay

delta = 3.4n

M2: Team Paradigm

20bit Adder Rise-Time

delta = 165p

M2: Team Paradigm

20bit Adder Fall-Time

delta = 136p

M2: Team Paradigm

4:1 Mux

M2: Team Paradigm

Rising Input (Delay 124pS)

M2: Team Paradigm

Rising input (rise time 351pS)

M2: Team Paradigm

Rising select (Delay 157pS)

M2: Team Paradigm

Rising select (rise time 346pS)

M2: Team Paradigm

Falling input (delay 110pS)

M2: Team Paradigm

Falling input (fall time 226pS)

M2: Team Paradigm

Falling Select (delay 147pS)

M2: Team Paradigm

Falling select (fall time 224pS)

M2: Team Paradigm

4 bit counter

M2: Team Paradigm

Rising (delay 205pS)

M2: Team Paradigm

Rising (rise time 335pS)

M2: Team Paradigm

Falling (delay 216pS)

M2: Team Paradigm

Falling (fall time 203pS)

M2: Team Paradigm

::thoughts & questions