1- - OFFICE ORDER 1
2- - EXTRA CONDITIONS FOR LABOUR WORK ONLY 2
3- - IMPORTANT INSTRUCTIONS 3-5
4- 1 MATERIAL 6-19
5- 2 LABOUR 20-21
6- 3 CARTAGE 22-25
7- 4 EARTH WORK 26
8- 5 CONCRETE WORK 27-28
9- 6 BRICK WORK 29
10- 7 DAMP PROOF COARSE 30
11- 8 ANTI TERMITE TREATMENT 31
12- 9 WOOD WORK 32-34
13- 10 MILD STEEL & IRON WORK 35-37
14- 11 ROOF WORK 38
15- 12 CEILING AND LINING 39-41
16- 13 PLASTER & POINTING 42-43
17- 14 FLOORING 44-46
18- 15 PAINTING & DISTEMPERING 47-49
19- 16 WHITE WASHING & COLOUR WASHING 50
20- 17 DEMOLITION & DISMANTLING 51-52
mÙkj izns'k yksd fuekZ.k foHkkx
INDEXSl.
No.Chapter Description Page No.
CHAPTER-2
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut
Bulandshah
rAligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/G
autam Budh
Nagar
/Ghaziabad
/Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1- Mistri Per Day - 440.00 440.00 380.00 360.00 380.00
2(a)- Mason (for floor & Tiles Work) Per Day 450.00 - - 380.00 350.00 380.00
2(b)- Mason (for other works) Per Day 400.00 400.00 400.00 350.00 340.00 350.00
3(a)- Carpenter (for skilled/furniture work) Per Day - 400.00 400.00 380.00 350.00 380.00
3(b)- Carpenter (for other work) Per Day 400.00 380.00 380.00 350.00 330.00 350.00
4- Black Smith Per Day 370.00 380.00 380.00 350.00 330.00 350.00
5- Hammer Man Per Day 325.00 330.00 330.00 260.00 245.00 260.00
6- Fitter Per Day 400.00 300.00 300.00 320.00 300.00 320.00
7- Welder Per Day - 300.00 300.00 350.00 320.00 350.00
8(a)- Painter (for Polishing Work) Per Day - 400.00 400.00 380.00 360.00 380.00
8(b)- Painter (for Painting work) Per Day 400.00 370.00 370.00 290.00 290.00 290.00
9- Plumber (with kit) Per Day 425.00 360.00 360.00 350.00 330.00 350.00
10- Helper to Plumber Per Day - - - - - -
11- Mate Per Day 330.00 300.00 300.00 270.00 250.00 270.00
12- Mazdoor / Beldar / Chawkidar / Helper / Cleaner/Coolies Per Day 325.00 260.00 260.00 260.00 225.00 260.00
13- Bhisti with Mashak Per Day 300.00 280.00 280.00 290.00 260.00 260.00
14- White Washer Per Day 330.00 350.00 350.00 270.00 250.00 270.00
15- Beldar for bitumen/tar work Per Day 330.00 280.00 280.00 270.00 240.00 270.00
16- Glazier Per Day 330.00 280.00 280.00 320.00 300.00 320.00
17- Floor cutting machine with operator but without grinding stone Per Day - 600.00 600.00 530.00 550.00 530.00
18- Tractor with trolley including P.O.L. & Driver Per Day 900.00 1300.00 1300.00 1300.00 1200.00 1300.00
19(a)- Road Roller Without P.O.L. & Driver Per Day - - - - - -
19(b)- Road Roller With P.O.L. & Driver etc Per Day - - - 2000.00 1850.00 2000.00
20- Rivetter Per Day - 300.00 300.00 350.00 320.00 350.00
21-Jeep / Car / Truck / Tipper / Roller Driver, Pump / Mixol / Generator
Operator, Electrician / Wire manPer Day - 320.00 320.00 280.00 270.00 280.00
22- Ameen/Tracer Per Day 370.00 300.00 300.00 270.00 270.00 270.00
23- Surveyor/Draftman Per Day - 370.00 370.00 - 270.00 -
24- Tractor with Water Tanker with cost of water Including P.O.L. and Driver. Per Day 2000.00 - - 1300.00 1200.00 1300.00
25- Mixol Machine Complete in all respect (without P.O.L.) Per Day - - - 1100.00 - 1100.00
26-C.C. Mixer with Hopper, One Cement bag Capacity, with POL and
Operator Complete in all respectPer Day - - - 2200.00 3000.00 2200.00
27-Water Tanker with Sprinkler 6000 Litre or above cap.
With POL/Driver including filling of water etc. completePer Day - - - - 1200.00 -
28- J.C.B. (Joint Cutter Bucket) Including P.O.L. and Driver Per Hour 950.00 800.00 800.00 - - -
29- Vibrator (Surface/Pin with Operator and POL Per Day - - - - - -
30- Armed Guard from security agency. Per Day - - - - - -
31- Five door commercial vehicle with driver. Owing taxi permit without fuel. Per Day 700.00 800.00 750.00 750.00 750.00 750.00
-
-
-
-
-
-
300.00
385.00
-
-
-
-
-
-
-
-
-
-
300.00
265.00
300.00
350.00
-
285.00
330.00
375.00
-
410.00
380.00
480.00
480.00
420.00
-
435.00
450.00
-
-
-
-
-
-
300.00
385.00
-
-
-
-
-
-
-
-
-
-
300.00
265.00
300.00
350.00
-
285.00
330.00
375.00
-
410.00
380.00
480.00
480.00
420.00
-
435.00
450.00
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
Labour Rate
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
01.01.2018 24.04.2018
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017
CHAPTER-4
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli /Muzaffar
nagar
Moradabad
/Amroha
/Sambhal
Rampur
/BijnorBareilly Shahjahanpur Budaun Pilibhit
Lucknow/
Raibareli
Sitapur
/Kheri
Unnao
/Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gauta
m Budh Nagar
/Ghaziabad /Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra
/Mathura
Mainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Farukh
abad
Faizabad/Ambe
dkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 251
Excavation in foundations in ordinary soil (Loam clay or
sand) including lift upto 1.5 m. (5 fts.) and lead upto 30m.
(100 fts.) & including filling, watering and ramming of
excavated earth into the trenches or into the space
between the building and the sides of foundation trenches
or into the plinth and removal and disposal of surplus
earth as directed by the Engineer-incharges upto a
distance of 30 m. (100 fts.) from the foundation trenches.
4.11 Cum. 82.00 90.00 90.00 110.00 105.00 110.00 110.00 110.00 120.00 115.00 82.00 95.00 125.00 130.00 125.00 110.00 110.00 105.00 110.00 105.00 105.00
175.00
(With
Royalty)
- 110.00 105.00 110.00
3 252
Same as in item No. 251 above but excavation in soil
mixed with Moorum, shingle. Kankar etc. requiring the use
of special T&P. such as piclaxes, sabbals etc.
4.13 Cum. 86.00 95.00 95.00 130.00 125.00 130.00 130.00 130.00 130.00 125.00 86.00 90.00 130.00 135.00 135.00 130.00 128.00 125.00 130.00 125.00 125.00
195.00
(With
Royalty)
- 130.00 125.00 130.00
4 253 4.13
Earthwork in cutting or in embarkment In ordinary soil,
excavation to be in the form of regular pits not exceeding
1/2 metre (20") in depth and earthwork in embankment to
be in 20 cm. (8") layers, including ramming & dressing the
surface to required levels and slopes and also including
1.5 metre (5 fts) lifts and 30 m. (100") lead. The earth
from cutting to be used in making embankment or to be
deposited as spoil banks within 30 metres (100 ft.)
distance as directed by the Engineer-in-charge.
4.3 Cum. 72.00 90.00 90.00 95.00 90.00 95.00 95.00 95.00 100.00 90.00 72.00 90.00 140.00 145.00 90.00 95.00 95.00 95.00 95.00 90.00 90.00 - 95.00 80.00 90.00
5 254 4.13
Add to items 251-253 for every additional 30 m. (100 fts.)
lead or part of 30 m. (100 fts.) or for every additional 1.5
m. (5 fts.) lift or part of 1.5 m. (5 fts.).
4.3 Cum. 11.50 12.00 12.00 17.00 15.00 17.00 17.00 16.00 16.00 14.00 11.50 15.00 15.00 15.00 13.00 17.00 17.00 17.00 17.00 17.00 17.00 22.00 - 17.00 14.00 16.00
6 255 4.24
Sand filling in plinth excluding supply of necessary
quantity of sand from a distance not exceeding 8 km. (5
miles) from the site of work and including watering,
ramming, dressing etc. rate to include cost of all
materials, labour and T & P etc.required for proper
completion of the work (Labour only).
4.4 Cum. 380.00 480.00 480.00
75.00
(Labour
only)
72.00
(Labour
only)
75.00
(Labour
only)
75.00
(Labour
only)
870.00 870.00 860.00 380.00 460.00
60.00
(Labour
only)
60.00
(Labour
only)
65.00
(Labour
only)
75.00
(Labour
only)
75.00
(Labour
only)
75.00
(Labour
only)
75.00
(Labour
only)
- -
1647.0
0 (With
Royalty
)
1808.0
0 (With
Royalty
)
1879.0
0 (With
Royalty
)
- - 630.00
60.00
(Labour
only)
650.00
7 256Same as in item no. 251 above but excavation in soil
mixed with gravel and boulder. 4.4 Cum. - - - 150.00 140.00 150.00 150.00 - - - - - - - - - - - 150.00 - - - - - 4.15 -
8 257
As in item 251 above but excavation in black cotton soil in
Bundelkhand area requiring use of special tools and
plants such as pick axes and sabbal etc.4.4 Cum. - - - 123.00 - 123.00 123.00 - - - - - - - - - - - 123.00 - -
180.00
(With
Royalty)
- - - -
9 258 Extra rate for quantities of work executed under- - -
(a) In or under water and or liquid mud.
Cum.Add 25% of above
item- -
Add 20% of
above item-
Add 20% of
above item
Add 20% of
above item
Add 20% of
above item
Add 20% of
above item
Add 20% of
above item
Add 25% of
above item- - - - - - -
Add 20% of
above item- - - - - - -
10 (b) In or under foul position.
Cum.Add 25% of above
item- -
Add 25% of
above item-
Add 25% of
above item
Add 25% of
above item
Add 25% of
above item
Add 25% of
above item
Add 25% of
above item
Add 25% of
above item- - - - - - -
Add 25% of
above item- - - - - - -
11 259
Cleaning jungla including uprooting of rank vegetations
grass, bush, wood trees and saplings of girth upto 30 cm.
measured at a height of 1 metre above ground level &
removal of rubbish upto a distance of 50 metres out side
the periphery of area cleared.
Sqm. 2.60 2.75 2.75 4.50 3.60 4.50 4.50 - 3.00 3.00 2.60 3.10 4.00 4.00 4.50 4.50 4.50 4.50 4.50 - - 5.00 - 3.60 - `-
Add 20% of above item
Add 25% of above item
3.50
Add 20% of above item
Add 25% of above item
4.00
126.00
142.00
28.30
35.40
5.40
112.00
146.00
Add 20% of above item
Add 20% of above item
5.00
Add 20% of above item
Add 20% of above item
4.50
140.00 (with Royalty)
140.00 (with Royalty)
Add 20% of above item
Add 20% of above item
4.50
Name of Circle
Name of Districts
S.O.R. Effective Date
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
EARTH WORK
140.00 (with Royalty) 83.00 90.00
01.06.2018 16.10.2017 24.04.201801.01.201815.12.2017
140.00 (with Royalty) 112.00 110.00
15.12.2017
110.00
120.00
15.00
Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
1000.00
120.00
160.00 (with Royalty)
180.00 (with Royalty)
20.00
750.00 (with Royalty)
112.00
13.00
65.00 (Labour only)
128.00170.00 (with Royalty)
160.00 (with Royalty)
180.00 (with Royalty)
20.00
750.00 (with Royalty)
170.00 (with Royalty)
139.00
161.00
20.40
172.00
140.00
162.00
20.00
85.00
(Labour only)
178.00
95.00
CHAPTER-5
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Ga
utam Budh
Nagar
/Ghaziabad
/Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM
NO NBODescription of the Work
P.W.D
SPEC.
NO.
UnitOver All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 273
Providing and laying Cement concrete 1:6:12( 1
cement ; 6 fine sand : 12 graded brick aggregate
40 mm.nominal size) including supply of all
materials,labour and T & P etc.required for proper
completion of the work and curing complete,also
including cost of formwork in foundation & floors.
Cum. 2600.00 2900.00 2900.00 2750.00 2700.00 2750.00 3000.00 3745.00 3745.00 3200.00 3160.00 3160.00 2600.00 2900.00 3650.00 3700.00 3675.00 2800.00 2840.00 2950.00 2750.00 2750.00 2750.00 4928.00 6084.00 7078.00 3800.00 3600.00 3500.00 3600.00 2370.00 3450.00 3200.00 3000.00 3100.00
2 274As in item (273) above, but in the proportion of
10:5:1. Cum. 2750.00 3050.00 3050.00 2850.00 2750.00 2850.00 3100.00 3950.00 3950.00 3550.00 3380.00 3380.00 2750.00 3050.00 3850.00 3900.00 3850.00 2960.00 3000.00 3150.00 2850.00 2850.00 2850.00 5105.00 6256.00 7260.00 - - - - 2545.00 3250.00 3350.00 3200.00 3250.00
3 275As in item (273) above, but in the proportion of
8:4:1. Cum. 2850.00 3200.00 3200.00 2950.00 2800.00 2950.00 3300.00 4100.00 4100.00 3650.00 3625.00 3625.00 2850.00 3200.00 4250.00 4300.00 4090.00 3000.00 3200.00 2975.00 2950.00 2950.00 2950.00 5222.00 6374.00 7377.00 - - - - 2415.00 3500.00 3575.00 3300.00 3350.00
4 279(a)
Providing and laying Cement concrete 1:2:4 (1
cement : 2coarse sand : 4 graded stone ballast 40
mm. nominal size) including supply of all materials.
labour and T&P etc. required for proper
completion of the work and curing complete, also
including cost of formwork in foundation and floors.
Cum. - 6100.00 6100.00 6900.00 7280.00 7280.00 6900.00 5910.00 5700.00 5910.00 6300.00 7400.00 8260.00 6500.00 6450.00 6450.00 5750.00 5800.00 6090.00 5830.00 5200.00 5850.00 5910.00 5910.00 5910.00 5560.00 4773.00 5625.00 5200.00 5000.00 4900.00 5000.00 5300.00 5610.00 5800.00 5200.00 -
5 279(b)
Providing and laying Cement concrete 1:2:4 (1
cement : 2coarse sand : 4 graded stone ballast 20
mm. nominal size) including supply of all materials.
labour and T&P etc. required for proper
completion of the work and curing complete, also
including cost of formwork in foundation and floors.
Cum. 5050.00 6200.00 6200.00 6950.00 7330.00 7330.00 6950.00 6000.00 5600.00 6000.00 6800.00 7900.00 8770.00 6550.00 6510.00 6510.00 5050.00 6250.00 6300.00 6350.00 6090.00 6100.00 5500.00 6500.00 6000.00 6000.00 6000.00 - - - 5700.00 5500.00 5400.00 5500.00 6115.00 5820.00 6600.00 - 5250.00
6 280 Same at item 279(a) above but in 6:3:1 Cum. 4300.00 - - 6300.00 6680.00 6680.00 6300.00 5600.00 5500.00 5600.00 6300.00 6800.00 7675.00 6100.00 5950.00 5950.00 4300.00 5400.00 4850.00 4900.00 5350.00 5200.00 5700.00 5250.00 5600.00 5600.00 5200.00 5009.00 4205.00 5076.00 4600.00 4400.00 4300.00 4400.00 4650.00 4900.00 5200.00 4700.00 4750.00
7 281 Same at item 279(a) above but in 8:4:1 Cum. 4100.00 5200.00 5200.00 6270.00 6700.00 6700.00 6270.00 5410.00 5450.00 5410.00 6100.00 6400.00 7350.00 5500.00 5425.00 5425.00 4100.00 5200.00 5050.00 5100.00 5150.00 4800.00 5400.00 4900.00 5410.00 5410.00 4800.00 4799.00 3974.00 4869.00 4400.00 4200.00 4100.00 4200.00 4490.00 4750.00 4900.00 4350.00 4400.00
8 282
Cost cement concrete door sills, chaukhats
boundry posts, shelves and similar small work with
cement, approved coarse sand and 2 cm. (3/4")
gauge approved stone ballast in the proportion of
1:2:4, excluding supply of reinforcement and its
binding but including its fixing and binding the
same with 24 B.W.G.G.I. binding wire, and
including the cost of binding wire, moulds and all
other materials, labour and T & P etc. required for
proper completion of the work.
Cum. 5450.00 6700.00 6700.00 8150.00 8500.00 8500.00 8150.00 7215.00 7800.00 7215.00 7200.00 8830.00 9750.00 7500.00 7500.00 7500.00 5450.00 6700.00 6550.00 6600.00 6500.00 6800.00 7300.00 7250.00 7215.00 7215.00 7150.00 7185.00 6328.00 7120.00 6400.00 6200.00 6100.00 6200.00 7100.00 7850.00 7600.00 7400.00 6600.00
9 283
R.C.C. work with cement approved coarse sand
and 2 cm. (3/4") gauge approved stone ballast in
the proportion of 1:2:4 in lintels of doors and
windows excluding supply of reinforcement and its
binding but including its fixing and binding the
same with 24 B.W.G.G.I. binding wire and
including necessary centering and shuttering etc.
and also including supply of all materials, labour
and T & P etc. required for proper completion of
the work. Binding wire cost being included in the
item.
Cum. 5670.00 6950.00 6950.00 7800.00 8150.00 8150.00 7800.00 7250.00 8600.00 7250.00 7800.00 8274.00 9420.00 7725.00 7725.00 7725.00 5670.00 7000.00 7050.00 7100.00 7150.00 6600.00 7100.00 6750.00 7250.00 7250.00 7250.00 7133.00 6242.00 7065.00 6600.00 6400.00 6300.00 6400.00 6840.00 7800.00 7700.00 7400.00 6550.00
10 283(a) Same as Item No. 283 above but 1:1.5:3 Cum. - 7100.00 7100.00 8200.00 8550.00 8550.00 8200.00 - - - 7900.00 7900.00 7550.00 - - - - - - - - 7747.00 6812.00 7676.00 6200.00 6000.00 5900.00 6000.00 6450.00 8100.00 - - -
11 284 As in item 283 above, but for slabs. Cum. 6050.00 7250.00 7250.00 8580.00 8900.00 8900.00 8580.00 7375.00 9030.00 7375.00 8000.00 8575.00 9720.00 8325.00 8325.00 8325.00 6050.00 7300.00 7600.00 7700.00 7750.00 6850.00 7500.00 6850.00 7375.00 7375.00 7375.00 7525.00 6585.00 7454.00 6800.00 6600.00 6500.00 6600.00 7640.00 8300.00 8300.00 7800.00 6800.00
12 284(a) Same as Item No. 284 above but 1:1.5:3 Cum. 6600.00 7650.00 7650.00 8900.00 9150.00 9150.00 8900.00 - - - 8790.00 8790.00 8790.00 6600.00 7700.00 8250.00 8350.00 8200.00 - 7600.00 6850.00 7400.00 8100.00 8100.00 - - - - - - - 8060.00 8600.00 8500.00 8400.00 7500.00
13 285As in item 283 above but the lighter beams i.e.
having spans upto 6 meters.Cum. 6350.00 7700.00 7700.00 9050.00 9400.00 9400.00 9050.00 7400.00 9050.00 7400.00 8200.00 8760.00 9900.00 8850.00 8850.00 8850.00 6350.00 7500.00 8650.00 8250.00 8400.00 6850.00 7700.00 6900.00 8300.00 7400.00 7400.00 7760.00 6791.00 7687.00 7000.00 6800.00 6700.00 6800.00 - - 8800.00 8000.00 7100.00
14 286As in item 283 above but the heavier beams/i.e.
having spans upto 6 metrs (20').Cum. 6450.00 7900.00 7900.00 9620.00 9850.00 9850.00 9620.00 7480.00 9070.00 7480.00 8800.00 8880.00 10100.00 9050.00 9050.00 9050.00 6450.00 7700.00 8900.00 8500.00 8710.00 6950.00 7800.00 7000.00 9200.00 7480.00 7480.00 8702.00 7615.00 8619.00 7200.00 7000.00 6900.00 7000.00 - - 9100.00 8400.00 7250.00
15 287
As in item 283 above but in R.C.C raft foundation
and footing with 4 cm. (1-1/2") gauge approved
stone ballast.
Cum. 5100.00 6300.00 6300.00 7380.00 7750.00 7750.00 7380.00 6100.00 - 6100.00 6700.00 7700.00 8560.00 7180.00 7180.00 7180.00 5100.00 6250.00 6600.00 6200.00 6200.00 6100.00 6650.00 6200.00 6100.00 6100.00 6100.00 6859.00 5899.00 6938.00 5700.00 5500.00 5400.00 5500.00 5700.00 - 6555.00 5800.00 5500.00
16 288
As in item 283 above but in R.C.C T Beam and
slab roofs and R.C.C columns. Rate as in item no.
(283) above.
Cum. 6000.00 7700.00 7700.00 9170.00 9500.00 9500.00 9170.00 7425.00 9050.00 7425.00 8100.00 8785.00 9920.00 8950.00 8950.00 8950.00 6000.00 7500.00 8650.00 8250.00 8400.00 7000.00 7700.00 7200.00 7425.00 7425.00 8702.00 7615.00 8619.00 7700.00 7500.00 7400.00 7500.00 - - 8700.00 8200.00 7100.00
17 289As in item no. 283 but on R. C. C. columns in 1 : 1-
1/2 : 3.Rate as in item No.288 above.Cum. 6870.00 8000.00 8000.00 9575.00 9945.00 9945.00 9575.00 7950.00 9500.00 7950.00 8500.00 9750.00 10750.00 9550.00 9550.00 9550.00 6870.00 8000.00 8700.00 8700.00 8800.00 7700.00 8300.00 7800.00 7950.00 7950.00 9316.00 8185.00 9230.00 7600.00 7400.00 7300.00 7400.00 - - 8900.00 8500.00 7700.00
18 Remark
10% extra rate will
be given for minor
repair in Govt.
Buildingbe.g.
Inspection House /
Circuit House /
Pooled Houses &
PWD Office Building
etc.
8000.00 - - - - - -
295.00
- - - - - - - - - -
9400.00 8800.00
3130.00
01.06.2018
3300.00
3500.00
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017
3130.00
3300.00
3500.00
Sultanpur-Amethi Jhansi Banda
01.01.2018 24.04.201816.10.2017
3340.00
3545.00
3745.00
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
CONCRETE WORK
Name of Circle Bareilly Budaun-Pilibhit Barabanki
6480.00
6885.00
5655.00
5160.00
7590.00
7370.00
8500.00
9000.00
-
-
8250.00
8750.00
8950.00
9750.00
6530.00
CHAPTER-6
Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr
/Hapur
Gautam Budh
Nagar
/Ghaziabad
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
Rate
Meerut/Bagpat klin
bricks
Rate
Saharanpur/M.Nag
ar/shamali with
flysh bricks
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 303 First Class brick work in 1 : 6 cement and fine sand
of 1.25 F.M. mortar in foundation and plinth including
supply of all materials, labour and T & P etc. required
for proper completion of the work.
6.1.1 Cum. 3500.00 3400.00 3900.00 3900.00 4700.00 4770.00 4770.00 4700.00 3300.00 3250.00 4350.00 3800.00 4800.00 4800.00 4450.00 3500.00 3930.00 3950.00 4250.00 4500.00 4400.00 4100.00 4090.00 4300.00 4350.00 3300.00 3300.00 5003.00 5524.00 6002.00 5200.00 5100.00 5300.00 5100.00 4100.00 5300.00 3802.00 4400.00 4450.00
2 304 As in item no. 303 above, but in 1 : 5 cement and
fine sand of 1.25 F.M. mortar. 6.1.3 Cum. 3600.00 3500.00 - - - - - - 3700.00 3275.00 4400.00 3900.00 4885.00 4885.00 4550.00 3600.00 4030.00 4050.00 - 4300.00 4200.00 - 4350.00 4400.00 - 3700.00 5069.00 5590.00 6068.00 5300.00 5200.00 5400.00 5200.00 4180.00 5400.00 4220.00 4500.00 4600.00
3 305(a) As in item no. 303 above, but in 1 : 4 cement and
fine sand of 1.25 F.M. mortar. 6.1.3 Cum. 3800.00 3700.00 4050.00 4050.00 - - - - 3750.00 3500.00 4470.00 3950.00 4970.00 4970.00 4650.00 3800.00 4130.00 4150.00 4450.00 4570.00 - 4250.00 4200.00 4400.00 4470.00 3750.00 3750.00 5135.00 5656.00 6136.00 5400.00 5300.00 5500.00 5300.00 4260.00 5500.00 4300.00 4600.00 4650.00
4 305(b) As in item 303 above but in 1 : 4 cement and coarse
sand mortar. 6.1.3 Cum. 4000.00 3900.00 4650.00 4650.00 4880.00 4960.00 4960.00 4880.00 4050.00 3350.00 4920.00 4400.00 5520.00 5160.00 4550.00 4550.00 4000.00 4430.00 4450.00 4550.00 4700.00 4430.00 4500.00 4450.00 4700.00 4920.00 4050.00 4050.00 - - - - - 5700.00 - - -
5 306 As in item no. 303 above, but in 1 : 3 cement and
fine sand of 1.25 F.M. mortar. 6.1.5 Cum. 3950.00 3850.00 - - - - 3900.00 - 4650.00 4300.00 5100.00 5100.00 4890.00 3950.00 4280.00 4300.00 - 4750.00 4500.00 4430.00 4600.00 4650.00 3900.00 3900.00 5334.00 5855.00 6333.00 5500.00 5400.00 5600.00 5400.00 4420.00 5750.00 4500.00 5000.00 5100.00
6 307 As in item no. 303 above but in 1 : 3 cement and
coarse sand mortar. 6.1.5 Cum. 4140.00 4040.00 4800.00 4800.00 5070.00 5150.00 5150.00 5070.00 4250.00 3900.00 5100.00 4700.00 5400.00 5770.00 5160.00 5060.00 5100.00 4140.00 4575.00 4600.00 4800.00 4950.00 5100.00 4750.00 4700.00 4700.00 5100.00 4250.00 4250.00 5348.00 5869.00 6344.00 5550.00 5450.00 5650.00 5450.00 4500.00 6150.00 4800.00 5200.00 5200.00
7 308 First Class brick work in mud mortar in foundation
and plinth including supply of all materials, labour
and T & P etc. required for proper completion of the
work.
Cum. - - 2700.00 2700.00 - - - - 3150.00 2800.00 3100.00 3250.00 4130.00 4130.00 - - 3550.00 3450.00 - - - 4185.00 4763.00 5106.00 4300.00 4200.00 4400.00 4200.00 - - - -
8 309 6.19 As in item (303) to (307) above, but in the super-
structure including necessary cutting and moulding
of bricks as required and also including honey comb
brick, work thickness of wall not to be less than 1½
brick thick. Add for extra labour to above items.
6.1.6 Cum. 200.00 200.00 240.00 240.00 300.00 300.00 300.00 300.00 365.00 600.00 365.00 249.00 320.00 320.00 250.00 250.00 200.00 280.00 280.00 360.00 250.00 250.00 250.00 250.00 365.00 210.00 210.00 276.00 276.00 276.00 240.00 240.00 240.00 240.00 285.00 - 250.00 200.00 220.00
9 310 As in item (309) above, but for wall of one brick thick.
Add for extra labour.Cum. 180.00 180.00 230.00 230.00 290.00 290.00 290.00 290.00 250.00 550.00 250.00 210.00 270.00 270.00 230.00 230.00 230.00 180.00 260.00 260.00 350.00 - - - 230.00 - 250.00 210.00 210.00 260.00 260.00 260.00 220.00 220.00 220.00 220.00 270.00 - 225.00 200.00 210.00
10 310(a) As in item (309) above, but for wall of half brick
(4½") thick. Add for extra labour over item no. 310. Cum. 220.00 220.00 300.00 300.00 430.00 430.00 430.00 430.00 125.00 280.00 125.00 105.00 140.00 140.00 195.00 195.00 195.00 220.00 300.00 300.00 500.00 510.00 260.00 125.00 120.00 125.00 125.00 95.00 95.00 390.00 390.00 390.00 290.00 290.00 290.00 290.00 135.00 - 112.00 100.00 150.00
11 310(b) As in item (309) above, but wall upto 3" thick. Add
for extra labour. Extra labour over item no.
310 (a).
Cum. - - 450.00 450.00 630.00 630.00 630.00 630.00 170.00 390.00 170.00 145.00 190.00 190.00 250.00 230.00 230.00 540.00 550.00 240.00 - 170.00 - 170.00 125.00 125.00 572.00 572.00 572.00 400.00 400.00 400.00 400.00 175.00 - 160.00 150.00 160.00
12 314 First class brick work in arches including shuttering
and centering add to items (301 to 307). Extra
labour, centering and shuttering required.Cum. - - 730.00 730.00 730.00 730.00 585.00 540.00 585.00 585.00 675.00 675.00 700.00 700.00 - - - 650.00 - 585.00 - 784.00 784.00 784.00 550.00 550.00 550.00 550.00 - - 670.00 - -
13 315 As in item 314 above, but in jack arches, including
shuttering & centering add to item 301 to 307. Extra
labour, centering and shuttering required.Cum. - - 810.00 810.00 810.00 810.00 650.00 625.00 650.00 650.00 720.00 720.00 800.00 800.00 - - - 740.00 - 650.00 - 848.00 848.00 848.00 - - - - - - 790.00 - -
14 316 As in item 314 above, but in well steining with
ordinary bricks, add to item 301 to 307. Extra cost of
labour, centering and shuttering etc.
Cum. - - 950.00 950.00 950.00 950.00 825.00 725.00 825.00 825.00 840.00 840.00 820.00 820.00 - - - 850.00 - 825.00 - 1011.00 1011.00 1011.00 - - - - - - 820.00 - -
15 317 As in item 316 above, but in well steining but with
specially moulded bricks. Add to item 316. Extra
labour required for workmanship and handling.
Cum. - - 300.00 300.00 300.00 300.00 275.00 200.00 275.00 232.00 300.00 300.00 270.00 270.00 - - - 250.00 - 275.00 - 292.00 292.00 292.00 - - - - - - 250.00 - -
16 Remark 10% extra rate will
be given for minor
repair in Govt.
Buildingbe.g.
Inspection House /
Circuit House /
Pooled Houses &
PWD Office
Building etc.
24.04.2018
Name of Districts
15.12.2017 15.12.2017 01.06.2018 16.10.2017
Sultanpur-AmethiBulandshahr
03.11.2017
Saharanpur
01.01.2018
Jhansi Banda
S.O.R. Effective Date
Saharanpur
/Shamli /Muzaffar nagar
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
BRICK WORK
Name of Circle Bareilly Budaun-Pilibhit Barabanki
5050.00
-
5150.00
5450.00
-
5750.00
720.00
825.00
225.00
-
245.00
215.00
115.00
145.00
620.00
CHAPTER-7
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar
nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gauta
m Budh Nagar
/Ghaziabad /Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 360
2 cm. (3/4") thick damp proof course with cement
and approved coarse sand 1:2 with and including
water proofing materials as ordered by the Engineer-
in charge in the proportion as specified by the
manufacturers including supply of all material, labour
and T&P etc., required for proper completion of the
work including proper curing and shuttering as
necessary.
Sqm. 200.00 200.00 200.00 200.00 200.00 200.00 195.00 200.00 210.00 200.00 200.00 200.00 200.00 200.00 255.00 - 245.00 170.00 170.00 175.00 200.00 200.00 200.00 173.00 169.00 177.00 160.00 150.00 150.00 155.00 190.00 220.00 200.00 - -
2 361
As in item (360) above but 2.5 cm. (1") thick and of
cement concrete consisting of one part cement 1½
parts approved coarse sand and 3 parts approved
13mm(1½) graded stone grit and including water
proofing materials as ordered by the Engineer-in-
charge in the proportion as specified by the
manufacturers.
Sqm. 275.00 280.00 280.00 290.00 245.00 290.00 290.00 350.00 380.00 280.00 282.00 285.00 275.00 300.00 360.00 260.00 300.00 285.00 300.00 - 290.00 290.00 290.00 284.00 266.00 280.00 240.00 230.00 220.00 230.00 285.00 320.00 290.00 - -
3 Remark
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
DAMP PROOF COARSE
Name of Circle Bareilly Budaun-Pilibhit
Name of Districts
Barabanki Sultanpur-Amethi Jhansi Banda
01.01.2018
195.00
16.10.2017
290.00
225.00
350.00
225.00
350.00
24.04.2018
CHAPTER-8
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
CHAPTER-8
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli /Muzaffar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Ga
utam Budh
Nagar
/Ghaziabad
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
ANTI TERMITE TREATMENT
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
Name of Districtsnagar
/Sambhal /Siddharth
Nagar
/Ghaziabad
/Hapur/Kashganj
Dehat /Chandauli
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D
SPEC. NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1- Providing and injecting chemical emulsion
24.04.2018S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018
1- Providing and injecting chemical emulsion
of preconsfructional antitermite treatment
and creating a chemical barrier and under
and around the column pits wall trenches
basement, excavation top surface of plinth
filling, junction of wall and floor, along thefilling, junction of wall and floor, along the
external perimeter of binding expansion
joints, surrounding of pipes and conduit
etc. complete (plinth area of the building at
ground floor only shall be measured as per
I.S. 6313 (part 111981) Aldine emulsifableI.S. 6313 (part 111981) Aldine emulsifable
concentrator any other approved material
such as Hepthachior of chlordane will be
used. The rate of application of chemical
emulsion shall be as follows:-
1- Treatment of Masonary & Foundation 51- Treatment of Masonary & Foundation 5
liter per Sq.M.
2- Back fill in immediate contact with
foundation 7.5 litre per Sq,M.
3- Treatment of top surface of plinth filling
5 litre per Sq.M.5 litre per Sq.M.
4- Treatment of soil external perimeter of
building 7.50 litre per Sq.M.
5- Treatment of soil apron along external
perimeter 5 litre per Sq.M.
150.00 100.00 100.00 100.00 - 132.00210.00 - 190.00 -- - - - -- - -125.00
125.00- -
150.00115.00 125.00 190.00280.00 190.00125.00 --Sq.M. 115.00
6- Treatment junction of wall and the floor
7.5 litre/sqm.
2 Remark
CHAPTER-9
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli /Muzaffar
nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti /Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gau
tam Budh Nagar
/Ghaziabad
/Hapur
Aligarh /Hathrash
/Etah /KashganjAgra /Mathura
Mainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM
NO
NBO
Description of the WorkP.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1- 401
C.P. Taek wood wrought framed and fixed
including simple mouldings, straight works as in
Chaukhats, including supply of all materials,
labour and T&P etc. required for proper
completion of work.
Cu.M. 83500.00 90000.00 90000.00 - - - 83500.00 90000.00 110000.00 - 100000.00 - - - - - 101544 101544 101544 - - - - 127600 - - - -
2- 402 As in Item no.-401 but for Sheesam wood Cu.M. 51800.00 52000.00 52000.00 - - - 51800.00 52000.00 71000.00 - 55000.00 - - - - - 44996 44996 44996 - - - - - - - -
3- 403 As in Item no.-401 but for Indian Sal wood Cu.M. 48000.00 54000.00 54000.00 - - - 48000.00 54000.00 81000.00 - 60000.00 - - - - - 55468 55468 55468 - - - - 78120 - - - -
4- 409
Supply and fixing of 4.5cm (1.3/4") thick C.P.
Teak wood part panelled & part glazed door
and window shutters including supply of
wooden cleats and stops and including fixing
and adjustment of hinses, bolts, locks, handles,
springs and/or other fitting but excluding their
supply and including painting with two coats of
Black Japan on all iron fittings if necessary &
including fixing the glass panes with putty &
brad. Glass to be 4mm thick. Fitting with
necessary screws to be supplied departmently.
Sq.M. 3600.00 - - - - - 4575.00 3600.00 4500.00 4800.00 - 5000.00 - - - - - 5014 5014 5014 - - - - 5500 - - - -
5- 410
Additional cost for fixing glass panes with C.P.
Teak wood beading and felt as directed by
Engineer-in-charge instead of putty and brad
including cost of all materials, labour and T&P
etc. required for proper completion of work.
Sq.M. 530.00 - - - - - 480.00 530.00 320.00 - 305.00 - - - - - 203 203 203 - - - - 192 - - -
6- 411 As in Item no.-409 above but fully panelled Sq.M. 4550.00 - - - - - 4800.00 4550.00 5000.00 - 5600.00 - - - - - 5513 5513 5513 - - - - 6590 - - -
7- 412 As in Item no.-409 above but fully glazed Sq.M. 3500.00 - - - - - 3800.00 3500.00 4000.00 - 4900.00 - - - - - 4620 4620 4620 - - - - 5500 - - -
8- 413 As in Item no.-409 above but 3.8cm thick Sq.M. 3980.00 - - - - - 3980.00 4700.00 - 4100.00 - - - - - - - - - 5400 - - -
9- 414 As in Item no.-411 above but 3.8cm thick Sq.M. 3790.00 - - - - - 3790.00 - 4350.00 - - - - - - - - - 6280 - - -
10- 415 As in Item no.-412 above but 3.8cm thick Sq.M. 3260.00 - - - - - 3260.00 3900.00 - 4100.00 - - - - - - - - - 5100 - - - -
11- 422As in Item no.-409 above but 3.8cm thick
Sheesam woodSq.M. 2740.00 - - - - - 2740.00 3250.00 - 3350.00 - - - - - - - - - 3700 - - - -
12- 423As in Item no.-411 above but 3.8cm thick
Sheesam woodSq.M. 2740.00 - - - - - 2740.00 3350.00 - 3650.00 - - - - - - - - - 3700 - - - -
13- 424As in Item no.-412 above but 3.8cm thick
Sheesam woodSq.M. 2640.00 - - - - - 2640.00 3200.00 - 3350.00 - - - - - - - - - 3700 - - - -
14- 450
Supply and fixing of 4cm (3/2") thick C.P. Teak
wood door and window shutters with panels of
heavy quality galvanized iron wire gauge
2.5mm or 2mm or 1.5mm (1/10 or 1/12 or 1/6
inch) mesh or any other size with necessary
beading including supply and fixing of wooden
cleats and stops and including fixing and
adjustment of hinses, bolts, locks, handles,
springs and/or other fitting but excluding their
supply and including painting with two coats of
Black Japan on all iron fittings if necessary.
Fitting with necessary screws to be supplied
departmently.
Sq.M. 3020.00 - - - - - 3020.00 3300.00 - 3600.00 - - - - - 3994 3994 3994 - - - - 4700 - - - -
15- 451 As in Item no.-450 above but in Sheesam wood Sq.M. 2640.00 - - - - - 2100.00 2640.00 2400.00 - 1800.00 - - - - - 2282 2282 2282 3490 - - -
16- 455
Supply and fixing galvanized mosquitos proof
heavy quality iron wire gauge or expended
metal heavy quality over windows and including
supply of C.P. Teakwood batten 8cmX1cm
(3"X3/8")/flat iron 25mmX4mm and including
supply of necessary screws all materials,
labour, T&P etc. required for proper completion
of work.
Sq.M. 630.00 - - - - - 630.00 700.00 690.00 - 700.00 - 600.00 - - - 728 728 728 620 620 620 620 590 - - -
17- 456As in Item no.-455 above but with Sheesam
wood battensSq.M. 600.00 - - - - - 600.00 600.00 580.00 - 490.00 - - - - - 488 488 488 - - - -
18- 457As in Item no.-455 above but with Indian Sal
wood battensSq.M. 490.00 - - - - - 490.00 650.00 520.00 - 500.00 - - - - - 533 533 533 - - - - - - - - -
19- 470
Supply and fixing of flush doors, commercial
quality conforming of I.S. 2202 part-1 (1983)
including fixing of wooden cleats and stoppers
and including fixing and adjustment of hinges,
bolts, locks, handles, springs, fitting with
necessary screws to be supplied departmentally
- - - - - - - - - - - - - - - - - - -
(A) 32mm thick Sq.M. 1300.00 1350.00 1350.00 - - - 1430.00 1400.00 1400.00 1620.00 1600.00 1480.00 1480.00 1500.00 1430.00 1470.00 1470.00 2264 - 1400.00 - -
(B) 35mm thick Sq.M. 1490.00 1400.00 1400.00 - - - 1495.00 1420.00 1420.00 1600.00 - 1700.00 1510.00 1510.00 1600.00 1495.00 1560.00 1560.00 1900 1900 1900 1900 - 1420.00 - -
(C) 40mm thick Sq.M. - 1450.00 1450.00 - - - 1560.00 1530.00 1530.00 1830.00 1800.00 1630.00 1630.00 1630.00 1560.00 1640.00 1640.00 2000 2000 2000 2000 - 1530.00 - -
(D) For double leaf shutters add extra in over all
rates.Sq.M. 200.00 120.00 120.00 - - - 104.00 110.00 110.00 160.00 165.00 135.00 85.00 85.00 85.00 104.00 104.00 104.00 - - - - - - 110.00 - -
20- 473
Approximate cost of ISI marked oxidized iron
fitting with screws for doors & windows etc. (for
estimating purpose only)
Sq.M. 380.00 - - - - - - 420.00 - 180.00 - - - 850 850 850 850 209 - - - -
21- 474As in Item no.-473 but Aluminium fittings ISI
markedSq.M. 440.00 - - - - - 500.00 530.00 - 225.00 - - - - - - - 308 - - - -
22- Remark
-
-
1430.00
1495.00
1560.00
104.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
WOOD WORK
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
01.01.2018 24.04.2018
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017
89033.00
-
81970.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
1400.00
1420.00
1530.00
110.00
-
-
1400.00
1420.00
1530.00
110.00
89033.00
-
81970.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
CHAPTER- 10
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti /Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gau
tam Budh Nagar
/Ghaziabad
/Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM
NO
NBO
Description of the WorkP.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 501 Rolled steel joists fixed in position excluding cost of
joists which will be supplied free at site but including
all labour in handling and hoisting and including hire
etc. of necessary T&P.
- - - - - - - - - - - - - - - - - - 6000.00 - -
(a) Light section, i.e. not exceeding 300 kg. (6cwt.) in
weight and upto 7.5 metre (24ft.) in height. Qtl.- - - 900.00 630.00 900.00 830.00 1050.00 1050.00 - - - - - 756.00 756.00 756.00 - - - - - - - -
2 (b) Same as above but heavy section, i.e. exceeding
300 kg. (6 cwt.) in weight and upto 7.5 metre (24') in
height. Qtl.
- - - 1300.00 950.00 1300.00 1270.00 1610.00 1610.00 - - - - - 1156.00 1156.00 1156.00 - - - - - - - -
3 (c) Add to item 501(a) and 501(b) for heights beyond 7.5
metres (24ft.). Qtl.- - - 450 390 450 480 690 690 - - - - - 659.00 659.00 659.00 - - - - - - - -
4 502 Mild steel or iron work of small sizes and sections
such as holding down bolts, hold fasts, tie, rods,
gratings etc., (when not included in an over all rates)
wrought to required form, including supply of steel,
bolts, nuts and wastage etc and their fixing required
for proper completion of the work.
Qtl.
5200.00 5500.00 5500.00 5600.00 5390.00 5600.00 6000.00 7640.00 7640.00 5600.00 4900.00 4900.00 5200.00 5600.00
anlysis as
per
current
market
rate
5800.00 5700.00 5450.00 5560.00 5560 9252.00 9252.00 9252.00 5600 5600 5600 5600 5800 5700.00 5500.00 6600.00 6600.00
5 503 Mild steel or iron work in heavy sizes such as
trusses; builts up gates, door frames, record racks,
roof work, gates etc., wrought to required form
including drilling holes, rivetting or welding where
necessary and also including supply of steel, bolts,
nuts etc. & their fixing required for proper
completion of the work. 10.22 Qtl.
6000.00 6000.00 6000.00 5850.00 5820.00 5850.00 6250.00 8625.00 8625.00 5850.00 5050.00 5050.00 6000.00 6450.00
anlysis as
per
current
market
rate
2200.00
(Labour
only)
5900.00 5850.00 5810.00 5810.00 9958.00 9958.00 9958.00 5900.00 5900.00 5900.00 5900.00 5922.00 5950.00 6300.00 7000.00 6200.00
6 504 Mild steel or iron in plain work shch as reinforced
concrete or reinforced brick work (when not included
in over all rates) wrought to required shape as
necessary including bending for proper completion of
the work and including supply of all steel and
wastage & over lapping & hooks. 10.31 Qtl.
5600.00 5600.00 5600.00 5400.00 5140.00 5400.00 5900.00 7360.00 7360.00 5400.00 4700.00 4700.00 5600.00 5600.00
anlysis as
per
current
market
rate
5500.00 5400.00 5400.00 4850.00 4850.00 5666.00 5666.00 5666.00 5600.00 5600.00 5600.00 5600.00 5356.00 5800.00 5320.00 6422.00 5200.00
7 Remark
-
-
-
6960.00
7560.00
5750.00
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
MILD STEEL AND IRON WORK
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017
-
-
5650.00
5720.00
01.01.2018 24.04.2018
Analy
sis
By A
s P
er
Curr
ent
Mark
et
rate
s
Analy
sis
By A
s P
er
Curr
ent
Mark
et
rate
s
Analy
sis
By A
s P
er
Curr
ent
Mark
et
rate
s
-
5600.00
-
-
-
-
5650.00
5720.00
5600.00
-
-
CHAPTER- 11
Saharanpur Moradabad Rampur Lucknow Sitapur-Kheri Unnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur EtawahKannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti /Santkabir
Nagar /Siddharth
Nagar
Gorakhpur
/MaharajganjDeoria /Kushinagar Meerut /Baghpat
Bulandshahr/Gauta
m Budh Nagar
/Ghaziabad /Hapur
Aligarh /Hathrash
/Etah /KashganjAgra /Mathura
Mainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM
NO NBODescription of the Work
P.W.D
SPEC.
NO.
UnitOver All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1- 15.72 Painting top roofs with bitumen of approved quality @ 1.70 Kg. Per
Sq.M. impregnated with a cost of coarse sand @ 0.60 Cu.M. per 100
Sq.M. including cleaning the slab surface with a piece of cloth lately
soaked in kerosene oil complete.
Sq.M. 0.00 - - 75.00 - 130.00 130.00 116.00 116.00 116.00 - - - - - -
2- 538 Supply and laying complete 4cm (1-1/2") thick insulation layer of
sand and clay over jack arch, reinforced brick or reinforced cement
concrete roof.
11.9 Sq.M. 20.00 25.00 25.00 - 35.00 - 36.00 20.00 30.00 - 30.00 - 30.00 - - 18.50 18.50 20.00 20.00 20.00 20.00 24.00 - - -
3-i 539 Making expansion and contraction joint in terraced roof lip type,
including supply of necessary quantity of filler, tarfelt, brick tile all
material labour, tool and plants etc required for proper completion of
the work.
11.10 R.M. - 115.00 115.00 - 230.00 - 220.00 480.00 500.00 135.00 100.00 100.00 100.00 - 93.50 93.50 84.20 84.20 84.20 70.00 70.00 70.00 70.00 78.00 - 135.00 - -
3-ii 540 As in Item (539) above but parapet type. 11.11 R.M. - 380.00 380.00 - 780.00 - 840.00 - 475.00 470.00 470.00 465.00 - 414.00 414.00 449.00 449.00 449.00 600.00 600.00 600.00 600.00 370.00 - 625.00 - -
3-iii 543Screening overleaky roof with bitumen @ 1/2 kg per Sq.M. including
sweating, cleaning the roof with brush, heating of the paint upto the
required temperature pouring it on the surface spreading necessary
qty. of approved coarse sand @ 0.30 Cu.M. per 100 Sq.M. (1 cft per
100 sft) and including supply of all material, labour and tool and
plants etc. required proper completion of work.
11.12 Sq.M. 38.00 40.00 40.00 - - - 38.00 38.00 38.00 40.00 - 60.00 - 16.00 - - - 60.00 60.00 60.00 60.00 21.00 - - - -
1- 544
&
545
Supplying and laying one layer of tarfelt or any other equivalent
approved material at the junction of wall and roof or at any place as
per direction of E/IC including necessary over lap giving one coat of
approved mastic paint below the tarfelt and including supply of all
material labour and tools and plants etc. required for proper
completion of work fixed as per standard.
11.13 Sq.M. 210.00 220.00 220.00 - 240.00 - 350.00 185.00 185.00 210.00 260.00 - 260.00 260.00 260.00 260.00 - 195.00 195.00 247.00 247.00 247.00 120.00 120.00 120.00 120.00 137.00 - - - -
5- 5.7.16Providing and filling in position bitumen mixfiller of proportion 80kg of
hot bitumen, 1kg of cement and 0.25 Cu.M. of coarse sand in
expansion joints in width upto 2.5 cm, depth upto 15cm. Excluding
cost of materials but including cost of fuel.
R.M. - 210.00 210.00 - - 27.00 30.00 - - - - 14.95 14.95 20.20 20.20 20.20 - - - -
6- New
Providing and laying "brick coba" 12mm thick laid with M-150 class
brick bat coba 7.50cm thick with gap of 15mm to each other, over
20mm thick base of cement mortar 1:4 cement and coarse sand
mixed with water proofing compound spreding cement slurry mixed
with acrelic cement concrete water proofing compound filled gaps of
coba & top of coba mortar mixed with water proofing compound in
1:4 cement and coarse sand mortar finished smooth & top mashed
false square 30cmX30cm and side wall parapet shall be mono tythic
plaster wall upto 30cm higher and junction and corner shall be
rounded by brick ballast cement and coarse sand masonary coba
with top finished plaster mixed with acetic water proofing compound
@ 2% by weight & including S/o all material, labour, T&P etc
complete for proper completion of work.
Sq.M. 865.00 950.00 950.00 - - - 1100.00 1100.00 865.00 900.00 850.00 850.00 900.00 - - - - 838.00 838.00 974.00 974.00 974.00 750.00 750.00 750.00 750.00 - - - -
7- Remark
16.20
920.00
-
20.25
100.00
440.00
-
216.00
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
ROOF WORK
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018 24.04.2018
-
-
-
-
-
-
-
-
38.00
185.00
-
1100.00
38.00
185.00
-
1100.00
CHAPTER- 12
SaharanpurMoradab
adRampur Lucknow
Sitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar
nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gaut
am Budh Nagar
/Ghaziabad
/Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D
SPEC. NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 16.7Providing and fixing 6mm thick fibre hard board sheet lining
with but jointing and nails (Frame work and cover fillets to
be measured and paid for separately)
Sq.M. 0.00 200.00 200.00 - - 520.00 225.00 - 225.00 - - 186.00 186.00 206.00 206.00 206.00 170.00 170.00 170.00 170.00 185.00 - - - -
2 16.9(a) Providing and fixing veneered particle board 12mm thick
lining with but jointing and nails (Frame work and cover
filets to be measured and paid for separately)
Sq.M. - 410.00 410.00 - - 620.00 625.00 500.00 - 600.00 - - 409.00 409.00 582.00 582.00 582.00 500.00 500.00 500.00 500.00 490.00 - - - -
(b) 20mm thick particle board. Sq.M. - 480.00 480.00 - - 670.00 675.00 575.00 - 620.00 - - 470.00 470.00 655.00 655.00 655.00 600.00 600.00 600.00 600.00 650.00 - - - -
3 16.10 Providing and decorative type veneered particle board
12mm thick lining with but jointing and nails (Frame work
be paid separately)
Sq.M. - 450.00 450.00 - - 625.00 625.00 525.00 - 600.00 - - 431.00 431.00 582.00 582.00 582.00 500.00 500.00 500.00 500.00 490.00 - - - -
4 16.13 Providing and fixing 12mm thick plywood lining with but
jointing and nails (Frame work and cover fillets to be
measured and paid for separately)
Sq.M. - 350.00 350.00 - - 970.00 975.00 400.00 - 400.00 - - 346.00 346.00 424.00 424.00 424.00 410.00 - - - -
5 16.35 Providing and fixing 12mm thick plaster of Paris (Gypsum
anhydrous) ceiling tiles upto height of 5 meters upto floor
level over wooden frame and rendered smooth with plaster
of Paris. (Frame work to be measured and paid for
separately.)
Sq.M. - 475.00 375.00 - - 520.00 525.00 500.00 - 600.00 - - 466.00 466.00 582.00 582.00 582.00 500.00 500.00 500.00 500.00 490.00 - - - -
6(a)
Perforated ceiling tiles : Providing and fixing in position
teak wood perforated particle board ceiling tiles bonded
with B.W.P. type Phenol formaldehyde synthetic rains tile in
size 60x60x12mm over kali wood timber frame of 50x30mm
section and suspended from the roof with the help of flat
iron hangers of size 20x44mm on under side leaving and
expansion gap of 6mm and with provision for providing
necessary fighting fixtures including three coats of flat oil
paint of approved quality and shade and a coat of pink
primer/copal varnish of the side facing the roof as per
direction given by Engineer-In-Charge.
Sq.M. - 1070.00 1070.00 - - 990.00 1000.00 1100.00 - 1300.00 - - 1086.00 1086.00 1454.00 1454.00 1454.00 1350.00 1350.00 1350.00 1350.00 - - - -
6(b) Same as above but with decorative ceiling tiles. Sq.M. - 1100.00 1100.00 - - 1030.00 1050.00 1250.00 - 1350.00 - - 1104.00 1104.00 1485.00 1485.00 1485.00 1400.00 1400.00 1400.00 1400.00 - - - -
7(a)Wooden Partition: Providing and fixing in position 38mm
thick single skin partition with fibre of particle board frame
of 900x 400mm section of 75x38m mind fixing (Panelled
type) 19mm thick teak wood particle board bounded with
phenol formaldehyde synthetic resin both face commercial
confirming to ISI specification no. 3097-1980 as per
drawing complete with painting/French polish/wax polish or
as per direction given by Engineer In Charge.
Sq.M. - 1830.00 1830.00 - - 1320.00 1325.00 1325.00 - 1400.00 - - 1795.00 1795.00 1576.00 1576.00 1576.00 - - - -
7(b) Same as in Item No. 7(a) above but with 19mm thick teak
wood particle board laminated on both faces.Sq.M. - 2060.00 2060.00 - - 2540.00 2550.00 2500.00 - - - - 1848.00 1848.00 2606.00 2606.00 2606.00 - - - -
8(a)Providing and fixing in position double skin wooden partition
with fiber or particle board frame of 900 x 1200mm
rectangular of section 50 x 38mm covered with 12mm thick
teak wood particle board commercial quality of both face
duly painted two coats of high gloss synthetic enamel paint
over on priming complete.
Sq.M. - 1740.00 1740.00 - - 2240.00 2250.00 2200.00 - 2000.00 - - 1680.00 1680.00 2242.00 2242.00 2242.00 - - - -
8(b)Same as in Item No. 8(a) above but covering with 12mm
thick teak wood particle board laminated on both faces.Sq.M. - 1900.00 1900.00 - - 2440.00 2450.00 2400.00 - 2050.00 - - 1852.00 1852.00 2303.00 2303.00 2303.00 - - - -
9(a) Wall Paneling : Providing and fixing in position wall panels
of plain teak wood particle board 12mm thick bonded with
B.W.P. type Phenol formaldehyde synthetic resin tiles kali
wood frame and provision for providing switch board
fixtures etc. as per drawing complete with polishing and
fining with Fremg wax polish as per direction given by
Engineer-In-Charge.
Sq.M. - 1150.00 1150.00 - - 1530.00 1530.00 1450.00 - 1300.00 - - 1210.00 1210.00 1454.00 1454.00 1454.00 - - - -
9(b) Same as in Item No. 9(a) above but with one side
laminated instead of plain board.Sq.M. - 1670.00 1670.00 - - 2040.00 2050.00 1950.00 - 1750.00 - - 1728.00 1728.00 2000.00 2000.00 2000.00 - - - -
10(a) NewSupply and fixing of anodized aluminium door having 2mm
thick aluminium section excluding coating and average
coating of 20 microns fully glazed made of aluminium door
tube size 83.5x44.65 m as vertical member and
1140x44.45 mm size tube in bottom and horizontal member
door chaukhat should be of aluminium tublar vertical with
two openable shutter, the rate will include cost of material
fixtures 4mm glass handles locks screw necessary bending
and excluding cost of floor spring if required for proper
completion of the work as per direction of Engineer-In-
Charge.
Sq.M. - 3800.00 3800.00 - - - 4000.00 - - - - 4213.00 4213.00 - - - -
10(b) New Same as Item No. 10(a) but with 5mm thick plain glass
complete.Sq.M. - 3920.00 2920.00 - - - 4050.00 - - - - 4381.00 4381.00 - - - -
11 New Same as Item No. 10(a) above but for fixed glazing Sq.M. - 3550.00 3550.00 - - - 3750.00 - - - - 4032.00 4032.00 - - - -
551 Supply and fixing of 2.5Cm. Thick deodar wood plains,
ceiling Including supply of beading 2.5Cm. X 4Cm. (1" x 1
½") of deodar wood over joints but excluding cost of ceiling
joints if and when necessary but Including cost of material,
labour & T&P etc. required for proper completion of the
work.
Sq.M. - - - - - 1530.00 1550.00 1500.00 - - - - - - - - -
552 Same as Item No. 551 above but of C.P. teak wood. Sq.M. - - - - - 3050.00 3050.00 3025.00 - - - - - - - - -
553 As per Item No. 551 above but kail or cheer wood. Sq.M. - - - - - 720.00 725.00 650.00 - - - - - - - - -
554Supply and fixing A.C. Plain sheet ceiling includng beading
2.5cm x 4cm (1"x1½") of deodar wood, screws, bold and all
material, labour, T&P etc. complete, excluding cost of
ceiling joints if any required for proper completion of work.
Sq.M. - - - - - 370.00 375.00 375.00 - - - - - - - - -
-
-
-
1272.00
1815.00
4430.00
4610.00
4240.00
-
1140.00
1160.00
1890.00
1942.00
1765.00
1950.00
196.00
430.00
495.00
494.00
364.00
490.00
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
CEILING AND LINING
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018 24.04.2018
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
CHAPTER- 13
SaharanpurMoradaba
dRampur Lucknow
Sitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gau
tam Budh Nagar
/Ghaziabad
/Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 17.5812mm Cement plaster in single coat of fair side
of single of half brick wall for interior plastering
upto floor two level including internal rounded
angles chamfers, and/or rounded angles not
exceeding 80mm. In girth and finished even
and smooth No. extra for mixing any additive.
(I) 1cement : 3 coarse sand Sq.M. 160.00 170.00 170.00 185.00 190.00 190.00 185.00 160.00 142.00 160.00 170.00 190.00 200.00 155.00 155.00 155.00 160.00 175.00 165.00 170.00 160.00 160.00 165.00 162.00 160.00 160.00 160.00 171.00 167.00 175.00 145.00 140.00 145.00 140.00 149.00 145.00 157.00 154.00 150.00
(II) 1 cement : 4 fine sand Sq.M. 140.00 140.00 140.00 150.00 150.00 150.00 150.00 130.00 110.00 130.00 123.00 155.00 155.00 125.00 125.00 125.00 140.00 150.00 135.00 140.00 140.00 130.00 135.00 135.00 130.00 130.00 130.00 144.00 140.00 148.00 135.00 130.00 135.00 130.00 140.00 125.00 129.00 128.00 125.00
(III) 1 cement : 6 fine sand Sq.M. 125.00 130.00 130.00 135.00 135.00 135.00 135.00 120.00 100.00 120.00 111.00 145.00 145.00 118.00 118.00 118.00 125.00 140.00 120.00 125.00 125.00 120.00 110.00 125.00 120.00 120.00 120.00 130.00 126.00 134.00 105.00 100.00 105.00 100.00 117.00 115.00 118.00 112.00 110.00
2 17.59 15mm Cement plaster in single coat on rough
side of single or half brick wall for interior
plastering upto floor to level including internal
rounded angles chamfers, and rounded angles
not exceeding 80mm. In girth and finished even
and smooth.
(I) 1cement : 3 coarse sand Sq.M. - - - - - - - - - - 175.00 180.00 175.00 175.00 - 180.00 - - 214.00 209.00 219.00 - - - -
(II) 1 cement : 4 fine sand Sq.M. - - - - - - - - - - 140.00 150.00 155.00 148.00 - 150.00 - - 180.00 175.00 185.00 - - - -
(III) 1 cement : 6 fine sand Sq.M. - - - - - - - - - - 130.00 135.00 140.00 134.00 - 135.00 - - 163.00 158.00 168.00 - - - -
3 17.63 20mm cement plaster in two coats backing cost
17mm and finishing coat 3mm thick of neat
cement and marble dust in ratio 5:1 on rough
side of single or half brick interior plastering
upto floor to level including internal rounded
angles.
(I) 1cement : 3 coarse sand Sq.M. 230.00 200.00 200.00 - - - - - - - 165.00 260.00 275.00 250.00 205.00 210.00 210.00 - - - - 194.00 185.00
(II) 1 cement : 4 fine sand Sq.M. - - - - - - - - - - 220.00 - 215.00 165.00 - 170.00 - - - - - -
4 17.91 Extra items 17.58 &17.59 for plastering on
ceilings and soffits of stairs upto floor two level
instead of plastering in walls.
Sq.M. 14.00 14.00 14.00 17.00 17.00 17.00 17.00 15.00 12.00 15.00 - 20.00 16.00 - 15.30 15.00 15.00 - 17.00 - -
5 598 Making grooves 10 to 12mm wide x 8mm deep
in plaster of the wall or in ceiling vertically or
horizontally as required.
R.M. - - - - - - - - - - 27.00 25.00 30.00 - - - - - 26.00 22.00 22.00
6 Making drip course in sunshade or FACIA as
per direction as Engineer-In-Charge including
supply of all material, labour etc. required for
proper completion of work.
R.M. 19.00 25.00 25.00 - - - - - - - 10.00 17.00 - - - - -
7 17.116 Pointing on brick work with cement mortar 1:3
(1Cement : 3 Coarse Sand)- - -
(A) Flush pointing Sq.M. - - - - - - - - - - 68.00 70.00 105.00 110.00 105.00 139.00 - 139.00 - - - - - -
(B) Ruled pointing Sq.M. - - - - - - - - - - 115.00 120.00 115.00 149.00 - 149.00 - - - - - -
8 17.120Pointing on brick work on edge floor with
cement mortar 1:2 (1cement :2 coarse sand)
(A) Flush pointing Sq.M. 111.00 - - - - - - - - - 140.00 145.00 140.00 170.00 170.00 180.00 150.00 - 187.00 142.20 141.20 - 130.00 124.00 120.00
(B) Ruled pointing Sq.M. - - - - - - - - - - 150.00 155.00 150.00 190.00 - 200.00 - - - - - -
9 Pointing on brick work on edge cement mortar
1:4 (1Cement : 4 Coarse Sane)
(A) Flush pointing Sq.M. - - - - - - - - - - 100.00 110.00 105.00 134.00 - 134.00 - - - - - -
(B) Ruled pointing Sq.M. - - - - - - - - - - 110.00 115.00 110.00 125.00 - 125.00 - - - - - -
10 6mm Cement plaster in 1:3 cement and coarse
sand plastering on ceiling.Sq.M. - - - - - - - - - 130.00 115.00 - - - - - - - - -
-
-
-
-
-
-
-
-
-
-
-
-
-
11.00
156.00
139.00
111.00
-
CPWD-13.16
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
PLASTER & POINTING
Name of Circle Bareilly Budaun-Pilibhit
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018 24.04.2018
Barabanki Sultanpur-Amethi Jhansi Banda
CHAPTER- 14
SaharanpurMoradaba
dRampur Lucknow
Sitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/H
apur
Gautam Budh
Nagar
/Ghaziabad
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM
NO
NBO
Description of the WorkP.W.D
SPEC. NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1- 14.1 40mm thick marble chips flooring rubbed
and polished to granolithic finish, under
layer 32mm thick cement concrete 1:2:4
(1cement :2coarse sand: 4 12.5 graded
stone aggregates) 12.5mm top layer
8mm thick white or black marble chips of
required size from 1mm to 4mm nominal
sizes laid in cement marbles powder
mixed 3:1 (3cement :1marble powder by
weight) in proportion of 4:7 (4 cement
marble powder mix :7marble chip by
volume) including fixing if glass strips,
including cost of pigments & polish
excluding cost of glass strip.
- 730.00
A- With ordinary cement in top layer Sq.M. - - - - - - 730.00 - 600.00 550.00 - 550.00 - - - - - 730.00 720.00
B- With white cement on top layer Sq.M. - - - - - - 810.00 - 635.00 - - - - - - - - 965.00 950.00
2- Same in as Item 14.1 above but under
layer 25mm thick
A- With ordinary cement in top layer Sq.M. - - - - - - 710.00 840.00 920.00 920.00 - 610.00 475.00 - 475.00 - - 594.00 564.00 505.00 - - - - -
B- With white cement in top layer Sq.M. - - - - - - 900.00 980.00 980.00 - 620.00 - - - - - - - - - -
3- 625 14.3 20mm thick marble chips skirting or dado
rubbed and polished to granolithic finish,
under layer 14mm thick cement concrete
1:3 (1cement : 3coarse) and top layer
6mm thick white black or white and black
or gray or mixed marble chips of size
from smallest to 4mm nominal size laid in
cement marble powder mix 3:2 (3cement
portlant) : 1 marble power mixed 3:1
(3cement (Portland) : 1 marble powder by
weight in proportion of 4:7 (4 cement
marble power mix : 7 marble chops by
volume) as specified or directed by
Engineer-In-Charge and polished with
French mason polished for other
approved polish in including curing, hire
charges of cutting machine cost of all
material for proper completion of work.
(A) With ordinary Portland cement 14.9.1 Sq.M. - - - - - - 660.00 575.00 - 475.00 - - 750.00 - - 667.00 633.00 567.00 - - - 650.00 640.00
(B) With white cement Sq.M. - - - - - - 760.00 625.00 - 500.00 - - 800.00 - - 788.00 748.00 670.00 - - - 700.00 700.00
4- 14.69 Cement concrete flooring 1:2:4 (1 cement
: 2 coarse sand : 4 graded stone of size
12.5mm nominal size) laid in one layer
finished with floating coat of neat cement
(25mm thick floor)
Sq.M. 220.00 220.00 220.00 255.00 290.00 255.00 530.00 575.00 625.00 535.00 534.00 534.00 480.00 540.00 540.00 250.00 255.00 250.00 240.00 - 240.00 - - 230.00 219.00 196.00 240.00 220.00 200.00 220.00 280.00 - 235.00 223.00 220.00
5- 665 14.71 Cement concrete flooring 1:2:4 (1 cement
: 2 coarse sand : 4 graded stone of size
20mm nominal size) laid in one layer
finished with floating coat of neat cement
(40mm thick floor)
Sq.M. 288.00 330.00 330.00 380.00 790.00 380.00 360.00 350.00 325.00 - 125.00 - - 333.00 317.00 283.00 290.00 270.00 250.00 270.00 414.00 300.00 300.00
6- 612 Brick on an edge floor with class-150
brick laid in cement mortar consisting of
one part of cement and 6 part fine sand
of fineness modules 1.25 and pointed
with cement mortar 1:2 over 8cm thick
base concrete (pointing and base
concrete to be paid separately) including
supply of all material, labour and tools
and plants etc. required for completion of
the work.
Sq.M. - - - - 520.00 - 410.00 425.00 540.00 550.00 500.00 515.00 - 520.00 - 890.00 890.00 521.00 495.00 443.00 - - - - -
7- 617 Same as Item No. 612 but bricks laid flat Sq.M. - - - - 625.00 - 285.00 300.00 440.00 450.00 400.00 350.00 - 400.00 - - 339.00 322.00 289.00 -
8- 615 Brick on edge floor with Class- 150 brick
laid dry joints sand fillied Including
preparation of base to proper slope and
its ramming supply of all material, labour,
T&P etc. required for proper completion
of work.
Sq.M. 390.00 400.00 400.00 415.00 385.00 415.00 470.00 450.00 470.00 450.00 470.00 - 415.00 415.00 424.00 403.00 361.00 350.00 510.00 435.00 475.00
9- 619 Same as Item No. 615 but brick laid flat Sq.M. 270.00 300.00 300.00 - 255.00 - 345.00 360.00 - 350.00 - - 300.00 280.00 320.00
10- 628 Supply of fixing 6mm (1/4") thick china
white glazed tile in flooring or dado laid
with 1:3 cement and approved coarse
sand mortar finished with white cement
jointed and polishing complete including
supply of all materials, labour for proper
completion of the work.
Sq.M. 865.00 900.00 900.00 - 775.00 - 950.00 950.00 950.00 665.00 900.00 900.00 890.00 1200.00 1200.00 1200.00 - 722.00 722.00 909.00 864.00 773.00 1140.00 1100.00 1060.00 1100.00 1075.00 - 1010.00 1070.00 1060.00
11- 14.36 (a) P/L 20mm white albetta stone (super
quality) flooring over 25mm thick base of
cement mortar 1:4 (1 cement : 4 coarse
sand) laid and jointed with white cement
slurry including rubbing and polishing
complete.
Sq.M. - - - - - - - 1800.00 - 1750.00 - - 2100.00 2100.00 2000.00 1900.00 1700.00 - - - - -
12 14.43(b) Providing and Laying 30mm white kota
stone flooring over 20mm thick base of
cement mortar 1:4 (1 cement : 4 coarse
sand) laid over jointed with grey cement
slurry mixed with pigment to match the
shade of slab including rubbing and
polishing complete.
Sq.M. - - - - - - - 1100.00 - - - - - 890.00 - - 1200.00 1320.00 1350.00
13 Kota stone slab 20mm thick in risers of
steps, skirting dado and pillars laid on
10mm thick cement mortar 1:3 (1 cement
: 3 coarse sand) jointed with grey cement
slurry mixed with pigment to match the
shade of the slab including rubbing and
polishing complete.
Sq.M. - 900.00 900.00 - - - 850.00 650.00 850.00 - 900.00 - - 890.00 90.00 910.00 860.00 780.00 - - 1100.00 1170.00 1160.00
14 20mm thick marble tiles in risers of steps
skirting dado wall and pillars laid on
10mm thick cement mortar 1:3 (1 cement
: 3 coarse sand) jointed with gray cement
slurry mixed with pigment to match the
shade of slab including rubbing and
polishing complete.
Sq.M. - - - - - - - 1575.00 - - - - - 1756.00 - - - - -
15 631 Providing and fixing glass strips of 4mm
thick in joints of floor and skirting at the
time fo laying Including labour, T&P etc.
complete in all respect.
(a) 2.2 cm depth RM 12.00 18.00 18.00 - - - 16.00 16.00 12.00 17.00 17.00 16.00 15.00 15.00 - - - - - 15.00 15.00 15.00 15.00 - - 25.00 18.00 18.00
(b) 3.5 cm depth RM 15.00 19.00 19.00 - - - 17.00 17.00 15.00 18.00 18.00 18.00 16.00 16.00 - - - - - 18.00 18.00 18.00 18.00 - - 28.00 23.00 23.00
(c) 2.2 cm depth & 5mm thickness RM 15.00 19.00 19.00 - - - 17.00 17.00 15.00 18.00 18.00 18.00 16.00 16.00 - - - - - 18.00 18.00 18.00 18.00 14.20 - - - -
(d) 3.5 cm depth & 5mm thickness RM 17.00 20.00 20.00 - - - 19.00 19.00 17.00 20.00 20.00 22.00 20.00 19.00 - - - - - 21.00 21.00 21.00 21.00 16.00 - - - -
16 14.18 Precast terrazzo tiles 20mm thick with
white, black or white and black marble
chip of sizes upto 6mm laid in floors,
treads of steps and landing on bed of
25mm average thickness of cement
mortar 1:3 (cement : coarse sand) joined
with neat cement slurry mixed with
pigment to match the shade of tile
including rubbing an polishing complete
with precast tiles of
-
(a) Grey Sq.M. - - - - - - - 700.00 - - - - - - - - 920.00 900.00
(b) Coloured with white cement. Sq.M. - - - - - - - 760.00 - - - - - - - - - -
17 14.66 15mm cement concrete topping 1:2 (1
cement : 2 aggregate of size 4.75mm and
below by volume) laid over and finished
monolithic with structure slab.
Sq.M. - - - - - - 170.00 155.00 175.00 - 175.00 - - - - - - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
685.00
-
2419.00
1058.00
-
2020.00
-
-
1028.00
-
481.00
-
831.00
-
-
-
-
-
Bulandshahr
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
FLOORING
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
01.01.2018 24.04.2018
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017
-
-
-
-
-
-
-
-
230.00
335.00
-
-
500.00
435.00
990.00
-
-
-
-
16.00
17.00
17.00
19.00
-
-
-
-
-
-
-
-
-
230.00
335.00
-
-
500.00
435.00
990.00
-
-
-
-
16.00
17.00
17.00
19.00
-
-
-
SaharanpurMoradaba
dRampur Lucknow
Sitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/H
apur
Gautam Budh
Nagar
/Ghaziabad
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM
NO
NBO
Description of the WorkP.W.D
SPEC. NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
BulandshahrName of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
01.01.2018 24.04.2018
Name of Districts
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017
18 14.67 Same as item 14.66 but by monolithic
with base concrete including fixing of
glass strip as direction by Engineer-In-
Charge.
Sq.M. - - - - - - 185.00 160.00 200.00 - 200.00 - - - - - - -
19 Providing and laying vitrified floor tiles in
different size (thickness to be specified by
the manufactorer) with water absorption
less than 0.08% and conforming to IS :
15622, of approved make in all colour
and shades, laid on 20mm thick cement
mortat 1:4 (1cement : 4coarse sand)
including grouting the joints with white
cement and matching pigments etc.
complete size of tile 600X600mm
Sq.M. - 1350.00 1350.00 - 1240.00 - 1031.00 1200.00 1250.00 1750.00 - - 1400.00 - - - 1380.00 1150.00 1150.00 1140.00
20 Providing and fixing 18 mm thick Granite
(gang saw cut), mirror polished,
premoulded and prepolished, machine
cut for kitchen platforms, vanity counters,
window sills, facias and similar locations,
of required size, approved shade, colour
and texture laid over 20 mm thick base
cement mortar 1:4 (1 cement : 4 coarse
sand), joints treated with white cement,
mixed with matching pigment, epoxy
touch ups, including rubbing, curing,
moulding and polishing to edges to give
high gloss finish etc. complete at all
levels. (Slab area upto 0.50 Sq.M.)
Sq.M. - - - - - - - 3000.00 - - - - - - - - - -
21 Providing and fixing 18 mm thick Granite
(gang saw cut) mirror polished,
premoulded and prepolished, machine
cut for kitchen platforms, vanity counters,
window sills, facias and similar locations,
of required size, approved shade, colour
and texture laid over 20 mm thick base
cement mortar 1:4 (1 cement : 4 coarse
sand), joints treated with white cement,
mixed with matching pigment, epoxy
touch ups, including rubbing, curing,
moulding and polishing to edges to give
high gloss finish etc. complete at all
levels. (Slab area above 0.50 Sq.M.)
Sq.M. - - - - 1776.00 - 3150.00 4200.00 - 4050.00 - - - - - - -
-
-
-
-
-
-
-
-
CPWD-
8.2.2.1
CPWD-
8.2.2.2
-
1031.00
1871.00
1776.00
1871.00
1776.00
-
1031.00
CHAPTER- 15
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gau
tam Budh Nagar
/Ghaziabad
/Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
D.S.R. ITEM
NO.Description of the Work
P.W.D
SPEC. NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 641 - Painting or vanishing on iron works in small areas or new wood work with
one coat of ready mixed priming paint & one coat of approved superior
quality ready mixed paint of clear synthetic varnish including supply of all
materials, labour and T & P etc. required for proper completion of work.
Paint to be used should confirm to the I.S.I. No.103 1950
Sqm. 58.00 - - 65.00 65.00 65.00 58.00 64.00 64.00 65.00 - 58.00 55.00 - 24.50 30.00 59.00 65.00 59.00 65.00 65.00 65.00 66.00 64.00 61.00 59.50 62.00
2 642 - Same as in item 641 above but for every coat after 1st
coat. Details of cost
for 650 sft. AreaSqm. 24.00 - - 30.50 21.00 30.50 28.50 32.00 32.00 30.50 - 24.00 25.00 - 32.00 32.00 27.00 30.50 27.00 30.50 30.50 30.50 33.00 31.50 30.50 26.00 28.00
3 643 - As in item no.642 above but for every coat on previously painted old wood
or steel work.Sqm. 33.00 - - 42.00 34.00 42.00 39.00 44.00 44.00 40.00 - 33.00 35.00 - 35.00 37.00 37.00 42.00 37.00 42.00 42.00 42.00 52.00 43.00 40.50 34.50 36.00
4 644 - Painting roofs or other iron work in large area with one coat of ready mixed
priming paint with one coat of approved paint ( ANTISOL) including supply
of all materials, labour & T & P etc required for proper completion of the
work. Paint to be used should confirm. I.S.I No.103-1950. Cost for area of
650 sft.
Sqm. 52.00 - - 48.00 64.00 48.00 46.00 50.00 50.00 48.00 - 52.00 50.00 - 40.00 42.00 55.00 48.00 55.00 48.00 48.00 48.00 - 51.00 52.00 44.00 50.00
5 645 - As in item no.644 above but every coat after the first coat. Sqm. 15.00 - - 21.00 20.00 21.00 25.00 24.00 24.00 21.00 - 15.00 20.00 - 23.00 23.00 26.00 21.00 26.00 21.00 21.00 21.00 - 14.00 22.00 19.50 21.00
6 646 - As in item no.645 above but for every coat on previously painted old
surface.Sqm. 18.00 - - 32.00 28.00 32.00 40.00 35.00 35.00 32.00 - 18.00 25.00 - 30.00 30.00 40.00 32.00 40.00 32.00 32.00 32.00 - 21.00 32.00 27.00 30.00
7 649 - One priming coat & one coat oil distemper on new work including supply of
all materials, labour and T& P etc. required for proper completion of the
work.
Sqm. 45.00 50.00 50.00 57.00 60.00 57.00 65.00 66.00 66.00 48.00 48.00 48.00 45.00 47.00 48.00 48.00 47.00 50.00 57.00 50.00 57.00 57.00 57.00 64.00 52.00 60.00 38.50 42.50
8 650 - As in item no.649 above but for every coat after the first coat Sqm. 21.00 22.00 22.00 22.00 27.00 22.00 28.00 25.00 25.00 22.00 22.00 22.00 21.00 18.00 21.00 21.00 22.00 23.00 22.00 23.00 22.00 22.00 22.00 - 29.00 22.00 19.50 20.00
9 651 - As in item no.650 above but for every coat on previously old distempered
surface.Sqm. 24.00 25.00 25.00 27.00 29.00 27.00 35.00 30.00 30.00 33.00 27.00 27.00 24.00 23.00 - - - 28.00 27.00 28.00 27.00 27.00 27.00 36.00 21.00 27.50 33.50 33.50
10 652 - One coat hot coaltar on new surface including supply of all materials,
labour and T & P etc required for proper completion of the work.Sqm. 11.00 13.00 13.00 17.00 17.00 17.00 13.50 19.00 19.00 19.00 14.00 14.00 11.00 15.00 16.00 16.00 16.00 16.00 17.00 16.00 17.00 17.00 17.00 20.00 - 17.00 16.50 19.00
11 653 - One coat hot coaltar but every coat after 1st
coat previously painted surface
including supply of all materials, labour and T & P etc required for proper
completion of the work.
Sqm. 8.50 9.00 9.00 12.00 12.50 12.00 9.00 13.00 13.00 14.00 9.00 9.00 8.50 10.00 11.00 11.00 11.00 12.00 12.00 12.00 12.00 12.00 12.00 14.00 - 12.00 12.00 12.00
12 654 - One coat solignum or other approved preservative on new wood. Including
supply of all material, labour and T&P etc required for proper completion of
the work.
Sqm. 24.00 25.00 25.00 29.00 29.50 29.00 30.00 32.00 32.00 - 27.00 24.00 28.00 26.00 26.00 25.00 26.00 29.00 25.00 29.00 29.00 29.00 - - 25.00 - -
13 655 - As in item no 654 above but for every coat after first coat on previously
treated surfaceSqm. 10.00 15.00 15.00 22.00 24.50 22.00 25.00 26.00 26.00 - 22.00 10.00 12.00 22.00 22.00 21.00 22.00 22.00 21.00 22.00 23.00 23.00 - - 21.00 - -
14 656 - Oiling wood work with double boiled linseed oil including supply of all
materials, labour & T & P etc. required for proper completion of the work.
Details for an area of 700 sft.
Sqm. 13.00 12.00 12.00 13.00 14.50 13.00 50.00 17.00 17.00 11.00 11.00 11.00 13.00 15.00 12.00 12.00 12.00 13.00 13.00 13.00 13.00 13.00 13.00 - - 13.00 10.00 10.50
15 657 - Removing paint or varnish with paint remover or caustic soda, including
supply of all materials, labour and T & P etc. required completion of works. Sqm. 15.00 20.00 20.00 45.50 47.00 45.50 43.00 46.00 46.00 34.00 29.00 29.00 15.00 18.00 15.00 15.00 15.00 16.00 45.50 48.00 45.50 45.50 45.50 - - 45.00 38.00 38.50
16 658 - Wax polishing new wood work with approved ready made wax polish or
approved French polish after rubbing down with sand paper including
supply of all materials, labour and T & P etc. required for proper completion
of the work.
Sqm. 48.00 50.00 50.00 57.00 57.00 57.00 53.00 57.00 57.00 42.00 42.00 42.00 48.00 52.00 59.00 59.00 55.00 55.00 57.00 53.50 57.00 57.00 57.00 60.00 - 56.00 38.00 38.50
17 659 - As in item no. 658 above but repolishing wood work already wax or French
polished with approved really made wax polish or approved French polish
including supply of all materials, labour and T & P etc. required for proper
completion of the work
Sqm. 28.00 25.00 25.00 29.00 29.00 29.00 27.00 28.00 28.00 24.00 22.00 22.00 28.00 28.00 30.00 30.00 28.00 28.00 29.00 27.50 29.00 29.00 29.00 30.00 - 27.00 21.50 21.80
18 660 - Finishing walls with water proof cement paint of approved make and quality
on new work with two coats to give an even shade. Including supply of all
material labour and T & P etc required for proper completion of the work. Sqm. 48.00 48.00 48.00 51.00 51.00 51.00 48.00 54.00 54.00 45.00 45.00 45.00 48.00 42.00 55.00 55.00 55.00 51.00 51.00 51.00 51.00 51.00 51.00 54.00 49.00 51.00 45.00 40.00
19 661 - Same as in item no 660 but for each coat of water proof cement paint after
the first two coats to give an even shade.Sqm. 19.00 18.00 18.00 17.50 21.00 17.50 17.50 20.00 20.00 17.50 17.00 17.00 19.00 15.00 25.50 25.50 25.00 18.00 17.50 19.00 17.50 17.50 17.50 21.00 18.00 17.50 15.00 15.00
20 662 - Finishing walls with one coat of water proof cement paint of approved
quality on previously old treated surface with this paint to give an even
shade including supply of all material labour and T & P etc required for
proper completion of the work.
Sqm. 28.00 26.00 26.00 28.50 29.00 28.50 27.00 30.00 30.00 28.50 26.00 26.00 28.00 25.00 35.00 35.00 35.00 29.00 28.50 29.00 28.50 28.50 28.50 35.00 29.00 30.00 27.50 27.20
21 13.43.1 Applying one coat of water thinnable cement primer of approved brand and
manufacture on wall surface:Sqm. - - - 31.00 - 31.00 31.00 31.00 31.00 - - - - - - - - 31.00 - 31.00 - - - - - - -
22 13.46.1 Finishing walls with Acrylic Smooth exterior paint of required shade :New
work
(Two or more coat applied @ 1.67 ltr/10 sqm over and including priming
coat of exterior primer applied @ 2.20 kg/10 sqm) (ace Adv.,walmasta)
Asian, berger
Sqm. - - - 86.00 - 86.00 86.00 86.00 86.00 - - - - - - - - 86.00 109.00 86.00 - - - - - - -
23 13.47.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone
additives of required shade:New work (Two or more coats applied @ 1.43
ltr/ 10 sqm over and including priming coat of exterior primer applied @
2.20 kg/ 10 sqm) (apex Ultima, weather coat All guard) asian , berger
Sqm. - - - 110.00 - 110.00 110.00 110.00 110.00 90.00 - - - - - - - - 110.00 - 110.00 - - - - - 84.00 84.00
24 13.60.1 Wall painting with plastic emulsion paint of approved brand and
manufacture to give an even shade : Two or more coats on new work (Ist
quality (Royal,Silk) Asian/Berger )
Sqm. - - - 95.00 - 95.00 95.00 95.00 95.00 80.00 - - - - - 67.00 85.00 - 95.00 - 95.00 - - - 125.00 - 71.00 71.00
25 14.66.1 Finishing walls with Acrylic Smooth exterior paint of required shade :
Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement
paint surface (ace Adv.,walmasta) Asian, berger
Sqm. - - - 52.00 - 52.00 52.00 52.00 52.00 - - - - - - - - 52.00 - 52.00 - - - - - - -
26 14.66.2 Finishing walls with Acrylic Smooth exterior paint of required shade :
Old work (Old work (One or more coat applied @ 0.90 ltr/10 sqm). on
existing cement paint surface (ace Adv.,walmasta) Asian, berger
Sqm. - - - 35.00 - 35.00 35.00 35.00 35.00 - - - - - - - - 35.00 - 35.00 - - - - - - -
27 14.67.1 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone
additives of required shade Old work (Two or more coats applied @ 1.43
ltr/ 10 sqm) over existing cement paint surface (apex Ultima, weather coat
All guard) asian , berger
Sqm. - - - 77.00 - 77.00 77.00 77.00 77.00 - - - - - - - - 77.00 - 77.00 - - - - - - -
28 14.67.2 Finishing walls with Premium Acrylic Smooth exterior paint with Silicone
additives of required shade Old work Old work (one or more coats applied
@ 0.83 ltr/10 sqm). over existing cement paint surface (apex Ultima,
weather coat All guard) asian , berger
Sqm. - - - 50.00 - 50.00 50.00 50.00 50.00 - - - - - - - - 50.00 - 50.00 - - - - - - -
29
14.53.1
Wall painting with plastic emulsion paint of approved brand and
manufacture to give an even shade:One or more coats on old work
(Royal,Silk) Asian/Berger
Sqm. - - - 60.00 - 60.00 60.00 60.00 60.00 - - - - - 95.00 - - 60.00 - 60.00 - - 65.00 - - - -
30 13.80 Providing and applying white cement based putty of average thickness 1
mm,
of approved brand and manufacturer, over the plastered wall surface to
prepare
the surface even and smooth complete.
Sqm. 57.00 52.00 52.00 35.00 - 83.50 83.50 83.50 83.50 - - 57.00 60.00 - - - - 83.50 - 83.50 - - - - - - -
-
-
-
115.00
80.00
-
-
-
-
-
30.00
50.00
25.00
45.00
18.00
28.00
-
60.00
28.00
30.00
50.00
20.00
11.00
24.00
20.00
11.00
-
-
-
-
-
-
51.30
18.80
30.00
-
-
-
35.00
26.30
11.90
37.50
53.80
26.30
32.50
45.00
23.10
26.90
18.10
12.50
63.80
24.00
50.00
22.00
24.00
16.00
29.40
40.00
50.00
23.10
-
-
-
-
-
-
17.10
28.20
-
-
-
-
22.15
13.10
45.30
52.40
26.20
48.30
45.30
21.15
25.20
16.10
11.10
29.20
59.40
28.20
38.30
47.30
22.15
32.20
24.04.2018S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
PAINTING & DISTEMPERING
Name of Circle Bareilly Budaun-Pilibhit
Name of Districts
Barabanki Sultanpur-Amethi Jhansi Banda
-
-
-
-
-
-
53.00
24.00
26.00
14.00
10.00
27.00
22.00
10.00
22.00
20.00
26.00
45.00
18.00
25.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
53.00
24.00
26.00
14.00
10.00
27.00
22.00
10.00
22.00
20.00
26.00
45.00
18.00
25.00
-
-
-
-
-
-
-
-
-
-
CHAPTER- 16
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar nagar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Nagar
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Gaut
am Budh Nagar
/Ghaziabad /Hapur
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadra
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D SPEC.
NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 671 White washing one coat including supply of all
materials, labour and T & P etc required for proper
completion of the work.
Sqm.
7.00 8.00 8.00 5.50 6.00 5.50
5.5 6.5 6.5 6.5 7 8 7 6.00 8.00 8.00 5.50 8.00 5.50 5.50
5.50 6.00 -
6.70 6.00 6.00
2 672 As in item 671 above but two coats. Sqm. 11.00 12.00 12.00 8.50 8.90 8.50 8.5 9.5 9.5 9.5 11 12 12 9.00 7.00 8.50 8.50 8.50 8.50 8.50 8.50 9.00 - 10.50 8.00 8.00
3 673 As in item 671 above but 3 coats white washing 2
coats as per item 672
Sqm.14.00 15.00 15.00 12.00 7.70 12.00
12 12.5 12.5 12.5 14 15 17.5 4.00 4.00 9.50 12.00 9.50 12.00 12.0012.00 12.40 -
13.50 10.00 10.00
4 674 Colour washing one coat, using approved colouring
materials of buff, blue, grey or brown shade, including
supply of all materials, labour and T & P etc. required
for proper completion of the work.
Sqm.
9.00 10.00 10.00 9.00 8.00 9.00
9 10.5 10.5 10.5 9 10 9 9.00 7.00 9.50 9.00 9.20 9.00 9.00
9.00 10.00 -
9.50 9.00 9.00
5 675 As in item 674 above but 2 coats. Sqm. 17.00 17.00 17.00 16.00 13.50 16.00 16 17 17 17 17 18 18 17.00 16.00 17.00 16.00 17.00 16.00 16.00 16.00 15.00 - 16.00 12.50 12.50
6 676 As in item 674 above but using approved colouring
materials of pink, green or yellow shades.
Sqm.13.00 15.00 15.00 12.00 11.50 12.00
12 12 12 12 13 14 -- -
11.00 12.00 11.00 12.00 12.0012.00 - -
11.50 10.00 10.00
7 677 As in item 676 above but two coats Sqm. 15.00 18.00 18.00 21.50 21.50 21.50 21.5 21.5 19 19 15 16 - - - 19.00 21.50 19.00 21.50 21.50 21.50 - - 20.00 14.00 14.00
8 678 As in item 676 above but colour washing with copper
or iron sulphate one coat
Sqm.12.00 - - 14.00 14.00 14.00
14 15 - - 12 13 -- -
14.00 14.00 14.00 14.00 14.0014.00 - -
13.00 11.00 11.00
9 679 As in item 678 above but two coats. Sqm. 17.00 - - 26.50 26.50 26.50 26.5 26.5 - - 17 18 - - - 24.00 26.50 24.00 26.50 26.50 26.50 - - 23.00 16.50 16.50
10 680 Cement washing including supply of all materials,
labour and T & P. etc required for proper completion
of work.
Sqm.
14.00 15.00 15.00 7.50 7.60 7.50
7.5 8.5 8.5 8.5 14 15 -
- -
8.00 7.50 8.00 7.50 7.50
7.50 8.00 -
8.50 6.50 6.50
11 681 One priming coat and one coat of dry distemper on
new work including supply of all materials labour and
T & P etc. required for proper completion of work.
Sqm.
34.00 32.00 32.00 26.50 26.50 26.50
26.5 26.5 30 30 34 35 45 45.00 45.00 27.00 26.50 28.00 26.50 26.50
26.50 35.00 -
26.00 21.00 21.00
12 682 As in item 681 above but for each coat of distemper
after the first coat
Sqm.24.00 20.00 20.00 17.50 18.00 17.50
17.5 17.5 17 17 24 25 26 26.00 24.00 17.00 17.00 17.00 17.50 17.5017.50 20.00 -
15.00 12.00 12.00
18.00
13.00
18.00
9.00
28.00
16.00
5.00
7.00
9.00
9.00
13.00
11.00
22.50
15.20
26.80
8.00
19.00
19.60
25.10
7.55
25.10
17.00
5.10
9.40
13.80
9.40
17.40
12.30
43
25
5.05
8.55
11.55
9.05
16.10
12.10
20.10
14.10
18
-
-
-
-
9
16.00
33.00
19.00
10.00
13.00
16.00
13.00
18.00
16.00
21.00
-
-
21.00
-
-
24.04.2018
9
12.5
14.5
10
16.00
33.00
19.00
10.00
13.00
16.00
13.00
18.00
16.00
S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017 01.01.2018
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
WHITE WASHING & COLOUR WASHING
Name of Circle Bareilly Budaun-Pilibhit
Name of Districts
Barabanki Sultanpur-Amethi Jhansi Banda
CHAPTER- 17
UP PWD PREVAILING SCHEDULE OF RATES OF DIFFERENT CIRCLES/DISTRICTS OF U. P.
CHAPTER- 17
Saharanpur Moradabad Rampur LucknowSitapur-
KheriUnnao Gonda Basti Gorakhpur Deoria Meerut Bulandshahr Aligarh Agra Mainpuri Kanpur Etawah
Kannauj-
Farukhabad
Faizabad-
Ambedkar
Nagar
Azamgarh Ballia Allahabad Pratapgarh Varanasi Mirzapur Sonebhadra
Saharanpur
/Shamli
/Muzaffar
Moradabad
/Amroha
/Sambhal
Rampur /Bijnor Bareilly Shahjahanpur Budaun PilibhitLucknow/
RaibareliSitapur /Kheri Unnao /Hardoi
Gonda
/BalrampurBarabanki
Bahraich
/Shrawasti
Basti
/Santkabir
Nagar
/Siddharth
Gorakhpur
/Maharajganj
Deoria
/Kushinagar
Meerut
/Baghpat
Bulandshahr/Ga
utam Budh
Nagar
/Ghaziabad
Aligarh
/Hathrash
/Etah
/Kashganj
Agra /MathuraMainpuri/
Firozabad
Kanpur
Nagar/Kanpur
Dehat
Etawah/AuriyaKannauj/Faruk
habad
Faizabad/Amb
edkar NagarSultanpur Amethi
Azamgarh
/JaunpurBallia/Mau Jalaun Jhansi Lalitpur Chitrakut Banda Mahoba Hamirpur
Allahabad
/Kaushambi
Pratapgarh
/Fatehpur
Varanasi
/Ghazipur
/Chandauli
Mirzapur
/BhadoiSonebhadraName of Districts
DEMOLITION & DISMANTLING
Name of Circle Bareilly Budaun-Pilibhit Barabanki Sultanpur-Amethi Jhansi Banda
nagar
/Siddharth
Nagar
/Ghaziabad
/Hapur/Kashganj
06.11.2017 06.11.2017 03.11.2017 01.11.2017 24.11.2017 04.01.2018 07.02.2018 16.01.2018 31.01.2018 15.05.2018 03.11.2017 01.01.2018 15.12.2017 01.01.2018 01.02.2018 09.02.2018 07.05.2018 24.11.2017 14.12.2017 06.02.2018 01.02.2018 15.01.2018 01.02.2018 06.12.2017 09.03.2018
S.No.SCH.
P.W.D
ITEM NO
NBODescription of the Work
P.W.D
SPEC. NO.Unit
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
Over All
Rate
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
1 691 Dismantling sundried brick work including stacking of Cum
Over All RateOver All Rate
01.01.2018 24.04.2018S.O.R. Effective Date 15.12.2017 15.12.2017 01.06.2018 16.10.2017
1 691 Dismantling sundried brick work including stacking of
dismantled materials as directed by the Engineer-in-
Charge with in a distance of 60 metres ¼200ft.)
Cum
57.00 68.00 68.00 75.00 65.00 75.00 65.00 75.00 77.00 77.00 57.00 70.00 90.00 87.00 70.00 70.00 75.00 70.00 75.00 75.00 75.00 - 38.00 65.00 47.00 47.00
2 692 Dismantling brick work or stone work in lime or cement
mortar and including stacking of materials as directed
by the Engineer-in- Charge with in a distance of 60
metres ¼200 ft.)
Cum
316.00 350.00 350.00 400.00 350.00 400.00 348.00 400.00 400.00 400.00 316.00 400.00 500.00 474.00 350.00 380.00 400.00 380.00 400.00 400.00 400.00 400.00 190.00 350.00 250.00 250.00
3 693 As in item 692 above but in mud-mortar. Cum 158.00 160.00 160.00 200.00 180.00 200.00 174.00 180.00 180.00 180.00 158.00 180.00 250.00 237.00 200.00 190.00 200.00 190.00 200.00 200.00 200.00 - 130.00 160.00 125.00 125.00
-
320.00
160.00
73.00
352.00
194.00
64.00
338.00
169.00
77.00
400.00
190.00
77.00
400.00
190.00
-
410.00
-3 693 As in item 692 above but in mud-mortar. Cum 158.00 160.00 160.00 200.00 180.00 200.00 174.00 180.00 180.00 180.00 158.00 180.00 250.00 237.00 200.00 190.00 200.00 190.00 200.00 200.00 200.00 - 130.00 160.00 125.00 125.00
4 694 Dismantling reinforced cement concrete or reinforced
brick work, including stacking of dismantled materials
as directed by the Engineer-in-Charge with in a
distance of 60 metres ¼200 ft.)
Cum
575.00 750.00 750.00 900.00 750.00 900.00 770.00 850.00 850.00 850.00 575.00 800.00 980.00 1000.00 900.00 800.00 900.00 800.00 900.00 900.00 900.00 800.00 422.00 700.00 540.00 540.00
5 695 Dismantling jack arched or wooden beam & bargas
roofs, including beams & roof concrete & including
stacking of dismantled materials as directed by the
Sqm.
96.00 100.00 100.00 121.00 110.00 121.00 106.00 190.00 105.00 105.00 96.00 110.00 120.00 120.00 100.00 123.00 121.00 123.00 210.00 121.00 121.00 - 82.00 95.00 76.00 76.00
160.00
700.00
320.00
194.00
877.00
352.00
169.00
740.00
190.00-
190.00
850.00
105.00105.00
190.00
850.00
-
900.00
stacking of dismantled materials as directed by the
Engineer-in- charge with in a distance of 60 metres
¼200ft.)
96.00 100.00 100.00 121.00 110.00 121.00 106.00 190.00 105.00 105.00 96.00 110.00 120.00 120.00 100.00 123.00 121.00 123.00 210.00 121.00 121.00 - 82.00 95.00 76.00 76.00
6 696 As in item 695 above but only roof concrete. Cum 240.00 260.00 260.00 300.00 270.00 300.00 260.00 260.00 260.00 260.00 240.00 300.00 350.00 350.00 300.00 290.00 300.00 290.00 300.00 300.00 300.00 - 200.00 250.00 187.50 187.50
7 697 Dismantling cement concrete or brick or granolithic
floors, including base concrete and including stacking of
dismantled materials as directed by the Engineer-in-
Sqm.
38.00 42.00 42.00 45.00 40.00 45.00 39.00 42.00 42.00 42.00 38.00 45.00 70.00 50.00 45.00 44.00 45.00 44.00 45.00 45.00 45.00 45.00 23.00 37.00 28.50 28.5035.00
320.00
240.00
44.00
352.00
292.00
39.00
190.00
260.00
-
-
-
105.00
260.00
42.00
105.00
260.00
42.00
charge with in a distance of 60 metres ¼200ft½
8 698 As in item 697 above but floors to be stone flagged or
tiled floor.
Sqm.48.00 - - 60.00 55.00 30.00 53.00 60.00 - - 48.00 60.00 65.00 65.00 60.00 58.00 60.00 58.00 60.00 60.00 60.00 - 34.00 52.00 38.50 38.50
9 699 Dismantled single tiled roof, any kind, including purlin
and battens & including sacking of dismantled materials
as directed by the Engineer-in-charge with in a distance
Sqm.
- - - 65.00 59.00 65.00 56.50 65.00 - - - - 70.00 70.00 65.00 62.00 65.00 62.00 65.00 65.00 65.00 39.00 55.00 41.50 41.50
45.00
50.00
59.00
64.00
53.00
57.00
-
--
--
-as directed by the Engineer-in-charge with in a distance
of 60 metre ¼200ft.)
10 700 As in item 699 above but double tiled roof Sqm. - - - 110.00 72.00 110.00 96.70 110.00 - - - - 110.00 110.00 90.00 105.00 110.00 105.00 110.00 110.00 110.00 - 64.00 95.00 70.00 70.00
11 701 Dismantling corrugated iron roof walls and partitions
including purlin battens and vertical supports and
including stacking of materials as directed by the
Engineer-in-Charge with in a distance of 60 metres
¼200ft.)
Sqm.
33.00 38.00 38.00 35.00 32.50 35.00 26.50 34.00 34.00 34.00 33.00 40.00 40.00 40.00 35.00 35.00 35.00 35.00 35.00 35.00 35.00 - 25.00 32.00 24.50 24.50
90.00
30.00
108.00
38.00
97.00
33.00-
--
42.0042.00
-
¼200ft.)
12 702 Dismantling or girders, trusses & other steel work
including stacking of dismantled materials as directed
by Engineer-in-charge with in a distance of 60 metre
¼200ft.)
Qtl.
960.00 1000.00 1000.00 1400.00 1150.00 1400.00 1250.00 - 1035.00 1035.00 960.00 1200.00 1200.00 1250.00 850.00 1175.00 1400.00 1200.00 1400.00 1400.00 1400.00 - 785.00 110.00 825.50 825.50
13 703 Dismantling doors & windows, chowkhats with hold fast
& including stacking of dismantled materials as directed
by the Engineer-in-charge with in a distance of 60 m
Sqm.
48.00 50.00 50.00 55.00 69.00 55.00 49.00 - 55.00 55.00 48.00 50.00 65.00 65.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 60.00 34.00 50.00 38.00 40.0035.00
1100.00
58.00
1250.00
52.00
1100.00-
60.00
850.00
60.00
850.00
60.00by the Engineer-in-charge with in a distance of 60 m
¼200ft.)
48.00 50.00 50.00 55.00 69.00 55.00 49.00 - 55.00 55.00 48.00 50.00 65.00 65.00 55.00 55.00 55.00 55.00 55.00 55.00 55.00 60.00 34.00 50.00 38.00 40.00
14 704 Dismantling doors and windows leaves, including
stacking of material as directed by the Engineer-in-
charge with in a distance of 60 metre ¼200 ft.)
Sqm.
24.00 25.00 25.00 27.00 24.50 27.00 24.50 - 27.00 27.00 24.00 35.00 40.00 29.00 50.00 25.00 27.00 24.00 27.00 27.00 27.00 25.00 15.00 25.00 18.50 19.00
15 705 Dismantling doors and windows including chowkhats
but excluding holdfasts & including stacking of material
Sqm.
48.00 50.00 50.00 53.00 47.00 53.00 47.00 - 54.00 54.00 48.00 60.00 65.00 65.00 45.00 50.00 53.00 49.50 53.00 53.00 53.00 - 30.00 48.00 34.50 36.50
35.00
20.00
45.00
58.00
31.00
57.00
52.00
25.00
49.00
60.00
-
-54.00
60.00
30.00
60.00
30.00
54.00but excluding holdfasts & including stacking of material
as directed by the Engineer- in- charge wit in a
distance of 60m (200 ft.)
48.00 50.00 50.00 53.00 47.00 53.00 47.00 - 54.00 54.00 48.00 60.00 65.00 65.00 45.00 50.00 53.00 49.50 53.00 53.00 53.00 - 30.00 48.00 34.50 36.50
16 706 Dismantling existing plaster including disposal of refuse
as directed by the Engineer-in-charge with in a distance
of 60 metre ¼200ft.)
Sqm.
24.00 25.00 25.00 32.00 28.50 32.00 28.00 - 28.00 28.00 24.00 30.00 35.00 34.00 30.00 30.00 32.00 31.00 32.00 32.00 32.00 30.00 14.00 27.00 20.50 22.50
17 707 Racking out joints of brick work in cement or lime
mortar to a depth of 1 cm ¼3/8”½ including disposal of
Sqm.
19.00 20.00 20.00 22.00 21.20 22.00 19.50 - 23.00 23.00 19.00 22.00 25.00 25.00 20.00 22.00 22.00 22.00 22.00 22.00 22.00 - 12.00 22.00 14.50 16.00
45.00
26.00
18.00
57.00
31.00
22.00
49.00
27.00
20.00-
-
33.00
54.00
28.00
24.0024.00
54.00
28.00
mortar to a depth of 1 cm ¼3/8”½ including disposal of
refuse as directed by the Engineer-in-charge with in a
distance of 60 m(200 ft.)
19.00 20.00 20.00 22.00 21.20 22.00 19.50 - 23.00 23.00 19.00 22.00 25.00 25.00 20.00 22.00 22.00 22.00 22.00 22.00 22.00 - 12.00 22.00 14.50 16.00
18 708 Scraping old white or colour wash including disposal of
refuse as directed by the Engineer-in-charge with in a
distance of 60 metres ¼200ft½
Sqm.
9.00 7.00 7.00 10.00 8.50 10.00 8.50 - 8.00 8.00 9.00 10.00 10.00 11.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 8.00 5.00 8.50 6.50 6.80
18.00
8.00
22.00
10.00
20.00
8.05
-
10.00
24.00
8.00
24.00
8.00