LOCAL PROJECT UPDATES

NELSON D. NELSON, P.E.PUBLIC WORKS DIRECTOR

July 6, 2016

City Council Meeting

2

Traffic Signal Cabinet and TMC Communication CabinetKnocked Down at Sixth Street and Main Street

on June 22nd

3

TMC Communication Cabinetstill being restored at Sixth Street and Main Street

4

Foothill Parkway between I-15 and Teddy Bear LanePaving complete: Concrete, Striping, and Traffic Signal Modifications

through July 14th

5

HARR

ISO

N

6

SR-91 CLOSURES2-WEEK LOOK AHEAD AT A GLANCE

7

SR-91 EB On-Ramp from Main StreetOpen to Eastbound 91 Only

On-Ramp to I-15 anticipated in August

Westbound SR-91: 2-Week Look Ahead