lean-ISD - EPPIC › 2012 › 02 › p-1000-lean... · 2012-02-03 · lean-ISD lean applied to ISD...

Post on 24-Jun-2020

7 views 0 download

Transcript of lean-ISD - EPPIC › 2012 › 02 › p-1000-lean... · 2012-02-03 · lean-ISD lean applied to ISD...

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

1

lean-ISD

Session #415 TRAINING ’98

Conference Presentation

Peter R. Hybert

Guy W. Wallace

CADDI, Inc.

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

2

lean

Concept from the book:

The Machine That Changed the World

by:

James P. Womack

Daniel T. Jones

Daniel Roos

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

3

lean

Best of both mass and craft production

Principles and attributes of lean

• Teamwork

• Communication

• Efficient use of resources and elimination of

waste

• Continuous improvement

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

4

lean

Attributes of a lean process/methodology

• Defined process/steps

• Defined roles/responsibilities

• Standard tools/templates

• Flexible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

5

ISD

Common Benefits Common Complaints

• More interactivity and/or testing

• More effective instructional process

• Focus on job performance and learning versus content

• Better use of instructional media

• Takes too long

• Impossible to forecast and manage

• Variable results— depends on the designer

• Each designer uses his/her own process, formats, defaults, etc.

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

6

ISD

The bottom line—it is difficult to get consistent, reliable results implementing ISD in a corporate

training organization

Common Benefits Common Complaints

• More interactivity and/or testing

• More effective instructional process

• Focus on job performance and learning versus content

• Better use of instructional media

• Takes too long

• Impossible to forecast and manage

• Variable results— depends on the designer

• Each designer uses his/her own process, formats, defaults, etc.

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

7

lean-ISD

lean applied to ISD would have beneficial impacts on

• Quality

• Cycle time

• Cost

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

8

lean-ISD via the PACTSM Processes for T&D

CAD Curriculum Architecture Design

CADDI’s PACT Processes for T&D

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

9

CAD

MCD

Curriculum Architecture Design

Modular Curriculum Development

lean-ISD via the PACTSM Processes for T&D

CADDI’s PACT Processes for T&D

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

10

IAD

CAD

MCD

Curriculum Architecture Design

Modular Curriculum Development

Instructional Activity Development

lean-ISD via the PACTSM Processes for T&D

CADDI’s PACT Processes for T&D

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

11

IAD

CAD

PACT Analysis

MCD

Curriculum Architecture Design

Modular Curriculum Development

Instructional Activity Development

lean-ISD via the PACTSM Processes for T&D

CADDI’s PACT Processes for T&D

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

12

IAD

CAD

PACT Analysis

MCD

Project Planning & Management

Curriculum Architecture Design

Modular Curriculum Development

Instructional Activity Development

lean-ISD via the PACTSM Processes for T&D

CADDI’s PACT Processes for T&D

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

13

lean-ISD via the PACTSM Processes for T&D

IAD

CAD

PACT Analysis

MCD

Project Planning & Management

Curriculum Architecture Design

Modular Curriculum Development

Instructional Activity Development

Three levels of ISD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

14

Let’s look at some examples

lean-ISD via the PACTSM Processes for T&D

Akin to systems engineering of products

• Car development

• Telecommunications product development

• Software development

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

15

lean-Car Development

Component Design &

Development

Auto Integrated Systems Design

Customer Requirements

& Supplier Capabilities

System Design &

Development

Project Planning & Management

e.g., Four-door pickup truck

e.g., H/V/AC system design

e.g., Backseat fan control mechanism

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

16

lean-Telecommunications Product Development

Component Design &

Development

Network Integrated Systems Design

Customer Requirements

& Supplier Capabilities

System Design &

Development

Project Planning & Management

e.g., Networked phone system

e.g., Phone handset

e.g., “Redial” button

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

17

lean-Software Development

Component Design &

Development

Application Suite

Systems Design

Customer Requirements

& Supplier Capabilities

System Design &

Development

Project Planning & Management

e.g., Integrated corporate financial system

e.g., Spreadsheet application

e.g., “Cut & paste” function

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

18

PACT Processes for T&D

CAD - Curriculum Architecture Design

Macrolevel ISD analysis and design

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

19

PACT Processes for T&D

CAD - Curriculum Architecture Design

Macrolevel ISD analysis and design

Systems analysis and systems engineering design

of the T&D product line

• Modular design product line

Product X

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

20

PACT Processes for T&D

CAD - Curriculum Architecture Design

Macrolevel ISD analysis and design

Systems analysis and systems engineering design

of the T&D product line

• Modular design product line

Product Y Product X

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

21

Product X Product Y

Macrolevel ISD analysis and design

Systems analysis and systems engineering design

of the T&D product line

• Modular design product line

PACT Processes for T&D

CAD - Curriculum Architecture Design

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

22

Product X Product Y

CAD assists in a reuse strategy for modules/chunks of T&D content

PACT Processes for T&D

CAD - Curriculum Architecture Design

Macrolevel ISD analysis and design

Systems analysis and systems engineering design

of the T&D product line

• Modular design product line

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

23

PACT Processes for T&D

MCD - Modular Curriculum Development

Midlevel analysis and design

Akin to the ADDIE

Model, also known as the “big

block diagram,” from

the work of Robert Gagne,

Leslie Briggs, Robert Moran,

and Robert Branson

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

24

PACT Processes for T&D

MCD - Modular Curriculum Development

Midlevel analysis and design

Akin to the ADDIE

Model, also known as the “big

block diagram,” from

the work of Robert Gagne,

Leslie Briggs, Robert Moran,

and Robert Branson

Analysis A

Design D

Development D

Implementation I

Evaluation E

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

25

PACT Processes for T&D

IAD - Instructional Activity Development

Microlevel analysis and design

Development of typical instructional elements or

activities, such as

• Simulation exercises

• Performance tests

• Structured, on-the-job training

• Demonstrations

• Case studies

• Etc.

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

26

PACT Processes for T&D

Analysis

Similar front-end analysis for each PACT Process for

T&D

IAD

CAD

PACT Analysis

MCD

Project Planning & Management

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

27

PACT Processes for T&D

Analysis

Four types of ISD Analysis

PACT Analysis

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

28

PACT Processes for T&D

Analysis

PACT Analysis

Target Audience Data

Four types of ISD Analysis

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

29

PACT Analysis

Target Audience Data

Performance Modeling

PACT Processes for T&D

Analysis

Four types of ISD Analysis

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

30

PACT Analysis

Target Audience Data

Performance Modeling

Knowledge/Skill Analysis

PACT Processes for T&D

Analysis

Four types of ISD Analysis

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

31

PACT Analysis

Target Audience Data

Performance Modeling

Knowledge/Skill Analysis

Existing T&D Assessment

PACT Processes for T&D

Analysis

Four types of ISD Analysis

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

32

PACT Processes for T&D

Project Planning & Management

PACT embraces

• Structured processes

• Predefined roles and responsibilities

• Detailed planning

• Continuous communications

• Customer control of content/

supplier control of process

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

33

PACT Processes for T&D

Project Planning & Management

Planning and communications tools and templates

• Systematic engagement of customers and

stakeholders

- The right people doing the right things at the right time

• Interview guides

• Project Plan templates

- CAD

- MCD

- IAD

• PST gate review meeting presentations

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

34

PACT Processes for T&D

Gated Project Phases

Each PACT Process has a gated process model

• Gates are key customer/stakeholder

review/approval/decision points

CAD Phase 4

Implementation

Planning

CAD Phase 1

Project

Planning

& Kick-off

CAD Phase 2

Analysis

CAD Phase 3

Design

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

35

PACT Processes for T&D

Gated Project Phases

Each PACT Process has a gated process model

• Gates are key customer/stakeholder

review/approval/decision points

MCD Phase 4

Development/

Acquisition

MCD Phase 1

Project

Planning

& Kick-off

MCD Phase 2

Analysis

MCD Phase 3

Design

MCD Phase 5

Pilot Test

MCD Phase 6

Revision &

Release

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

36

PACT Processes for T&D

Gated Project Phases

Each PACT Process has a gated process model

• Gates are key customer/stakeholder

review/approval/decision points

IAD Phase 4

Development

IAD Phase 1

Project

Planning

& Kick-off

IAD Phase 2

Analysis

IAD Phase 3

Design

IAD Phase 5

Pilot Test

IAD Phase 6

Revision &

Release

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

37

PACT Processes for T&D

Gated Project Phases

CAD Phase 4

Implementation

Planning

CAD Phase 1

Project

Planning

& Kick-off

CAD Phase 2

Analysis

CAD Phase 3

Design

Each PACT Process is the starting point for

situational adjustment/adaptation

• Phase combinations are possible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

38

CAD Phase 4

Implementation

Planning

CAD Phase 1

Project

Planning

& Kick-off

CAD Phases 2/3

Analysis/Design

PACT Processes for T&D

Gated Project Phases

Each PACT Process is the starting point for

situational adjustment/adaptation

• Phase combinations are possible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

39

MCD Phase 4

Development/

Acquisition

MCD Phase 1

Project

Planning

& Kick-off

MCD Phase 2

Analysis

MCD Phase 3

Design

MCD Phase 5

Pilot Test

MCD Phase 6

Revision &

Release

PACT Processes for T&D

Gated Project Phases

Each PACT Process is the starting point for

situational adjustment/adaptation

• Phase combinations are possible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

40

MCD Phase 4

Development/

Acquisition

MCD Phase 1

Project

Planning

& Kick-off

MCD Phases 2/3

Analysis/Design

MCD Phase 5

Pilot Test

MCD Phase 6

Revision &

Release

PACT Processes for T&D

Gated Project Phases

Each PACT Process is the starting point for

situational adjustment/adaptation

• Phase combinations are possible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

41

IAD Phase 4

Development

IAD Phase 1

Project

Planning

& Kick-off

IAD Phase 2

Analysis

IAD Phase 3

Design

IAD Phase 5

Pilot Test

IAD Phase 6

Revision &

Release

PACT Processes for T&D

Gated Project Phases

Each PACT Process is the starting point for

situational adjustment/adaptation

• Phase combinations are possible

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

42

IAD Phases 4/5/6

Development, Pilot Test,

and Revision & Release

IAD Phases 2/3

Analysis/Design

PACT Processes for T&D

Gated Project Phases

Each PACT Process is the starting point for

situational adjustment/adaptation

• Phase combinations are possible

IAD Phase 1

Project

Planning

& Kick-off

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

43

PACT Processes for T&D

Teams & Roles/Responsibilities

Project Steering Team

Analysis Team

Design Team

Implementation Planning Team

Typical Teams — CAD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

44

Project Steering Team

Analysis Team

Design Team

Development Team

Pilot Test Team

PACT Processes for T&D

Teams & Roles/Responsibilities

Typical Teams — MCD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

45

Project Steering Team

Analysis Team

Design Team

Development Team

Pilot Test Team

PACT Processes for T&D

Teams & Roles/Responsibilities

Typical Teams — IAD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

46

Word Processing Templates

• Project Plan

• Proposal

• Project Steering Team Review

Presentations

• Invitation and Confirmation

Letters

Project Planning & Management

Tools and Go-by’s

• Stakeholder/Customer

Interview Guide

• Project Plan

• Proposal

PACT Processes for T&D

Tools and Templates

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

47

Analysis

PACT Processes for T&D

Tools and Templates

Word Processing Templates

• Target Audience Data

• Performance Model

• Knowledge/Skill Matrix

• Existing T&D Assessment

• Analysis Team Kick-off

Presentation

• Project Steering Team Review

Presentation

Tools and Go-by’s

• Analysis Report

• Analysis Database

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

48

Design

PACT Processes for T&D

Tools and Templates

Word Processing Templates

• Event Specs and Maps

• Module Specs and Maps

• Lesson Specs and Maps

• Activity Specs

• Project Steering Team Review

Presentation

• Design Team Kick-off

Presentation

Tools and Go-by’s

• Design Document

• Design Database

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

49

Development

PACT Processes for T&D

Tools and Templates

Word Processing Templates

Tools and Go-by’s

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

50

Customer/Stakeholder

• Project is visible and predictable in terms of

- T&D quality - Investment and returns

- Project tasks and schedule

• Provides managerial review and control points

Supplier

• Puts ISD suppliers in control of instructional integrity within the parameters set by the customer

• Templates and tools enable detailed project planning and communications with the customer

Learner

• T&D is performance oriented and will have a positive impact on learner’s ability to perform

• Modular structure provides flexibility for learner participation

lean-ISD via the PACT Processes for T&D

Business Benefits

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

51

lean-ISD via the PACT Processes for T&D

Business Benefits

Ensures voice of the customer and voice of the supplier in ISD projects

Customer/Stakeholder

• Project is visible and predictable in terms of

- T&D quality - Investment and returns

- Project tasks and schedule

• Provides managerial review and control points

Supplier

• Puts ISD suppliers in control of instructional integrity within the parameters set by the customer

• Templates and tools enable detailed project planning and communications with the customer

Learner

• T&D is performance oriented and will have a positive impact on learner’s ability to perform

• Modular structure provides flexibility for learner participation

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

52

lean-ISD Summary

• A blend of the best of both craft and mass

production approaches, applied to ISD

- Common process

- Gated process models

- Use of teams

- Use of tools and templates

• Multilevel design hierarchy used to ensure

platform, modular, integrated ISD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

53

Standard, but flexible processes and methodologies for ISD

lean-ISD Summary

• A blend of the best of both craft and mass

production approaches, applied to ISD

- Common process

- Gated process models

- Use of teams

- Use of tools and templates

• Multilevel design hierarchy used to ensure

platform, modular, integrated ISD

TRAINING ’98—Session #415 © 1998 CADDI, Inc. 2/18/98 P-1000

54

lean-ISD

Thank You!