Post on 02-May-2018
“We only make money off our planes when they’re in the air”
Keep operations simple
• 737
• Point-to-point flying
• 25 minute turn around
Washington Post
process management
Manufacturing
Software development
Construction
Healthcare
Starbucks?
#BIMForumED www.LEANarchitecture.com
process management
LeanRemove Waste
• Identify value
• Identify value stream
• Flow
• Pull
• Perfection
Focus on flow
How to Compare Six Sigma, Lean, and the Theory of Constraints
by Dave Nave in Quality Progress, © 2002
www.asq.com
ValueAnything the client is willing to pay for• Progresses the project• Client cares about it• Done right the 1st time
6 SigmaRemove Variation• Define• Measure• Analyze• Improve• ControlFocus on problems
TOCManage constraints
• Identify constraint
• Exploit constraint
• Subordinate processes
• Elevate constraint
• Repeat cycle
Focus on constraints
#BIMForumED www.LEANarchitecture.com
Prelim | SD Phase DD Phase15% 20% 45%
CD Phase25%
BN & CA
How many issuesneed to be resolved?
When you solve issues
#BIMForumED www.LEANarchitecture.com
D e s I g n45 – 50% 30 - 35%
D o c u m e n t20%
C o n s t r u c t
Solve the puzzleDocument the solution
#BIMForumED www.LEANarchitecture.com
themes
Instructional Systems
Default Referencing
Working in Context
Reduction of redundancy
Typicality
Default Scheduling
Visual QC
IKEA
#BIMForumED www.LEANarchitecture.com
find the chain
Northern US
Fast Track Construction
• facilitate the civil & structural engineers
South Central US
Owner
• minimally “draw” until decisions are made
• choices
#BIMForumED www.LEANarchitecture.com
Phase Driven (When)• Issues to think through
• Coordination
• What to Check
• Typical Drawings
DOT
#BIMForumED www.LEANarchitecture.com
The Architect's Handbook of Professional Practice - 15th Edition
American Institute of Architects
ISBN: 978-1-118-30882-01184 pagesNovember 2013
www.wiley.com