Lakewood High School Renovations

Post on 26-Dec-2015

613 views 0 download

description

NEW CONSTRUCTION & RENOVATION – A & B ACADEMIC WING Lakewood, Ohio

Transcript of Lakewood High School Renovations

Robert P. Madison, International

Community Meeting #2 October 7, 2014

Lakewood High School Renovation and Additions

Robert P. Madison, International

Program of Requirements

Academics* Classrooms (22 new) Science Room (1 new )

Special Education* Self-Contained Classrooms (7 new)

Music Band / Orchestra Room Vocal Room Piano Lab

Drama/TV Production Black Box Theater – can be shared with Music

New Media Center Includes Alumni Offices Large Reading Room Media Production Areas Computer Storage Areas *(Currently 30 classrooms in Modulars on Franklin)

Robert P. Madison, International

Program of Requirements

Dining Hall Student Dining – including “L” Room

Physical Education 3 Cross Courts or 1 Competition Gym Fitness /Weight Room Wrestling Room Team and PE Locker Rooms Athletic Offices and Training Room Concessions Area Ranger Shop Optional Elevated Track for Recreational Use

Administration Relocated Main Office Relocated House Principals’ Offices Relocated Guidance Center

Student Activity Rooms Collaboration Spaces H2O

Student Health Center

Robert P. Madison, International

Project Budget

Existing Building Demolish 264,790

Remain 268,850

New 149,000 Total 417,850

Project Budget

Construction Cost: $45,949,887

Robert P. Madison, International

Project Schedule 2014-2017

Construction Packages Construction Start Completion 1.) Swing Space Transition Package September 2014 January 2015 2.) Existing Building Demo & Abatement Package December 2014 Spring 2015 3.) Early Site & Foundation Package Spring 2015 October 2015 4.) Academic & East Wing Building Package Spring 2015 June 2017 5.) Civic Auditorium & Natatorium MEP Summers of 2015, June 2017 2016 & 2017

Robert P. Madison, International

TRANSITION PACKAGE: TEMPORARY CAFETERIA &

WARMING KITCHEN STORAGE & EGRESS

Robert P. Madison, International

Transition Package ‘A’ Building

Robert P. Madison, International

NEW CONSTRUCTION & RENOVATION – A & B ACADEMIC

WING

Robert P. Madison, International

Existing School Renovations

First Level Floor Plan

Robert P. Madison, International

Existing School Renovations

Second Level Floor Plan

Robert P. Madison, International

Existing School Renovations

Third Level Floor Plan

Robert P. Madison, International

LIFE SAFETY & MEP RENOVATIONS – CIVIC AUDITORIUM

Robert P. Madison, International

Access to Workroom and Changing Rooms Civic Basement

NEW CORRIDOR ACCESS NEW CORRIDOR ACCESS

NEW RAMP UP

NEW RAMP UP

NEW ELEVATOR

Robert P. Madison, International

NEW CONSTRUCTION & RENOVATION

Robert P. Madison, International

South - Site Plan

Robert P. Madison, International

North - Site Plan

Robert P. Madison, International

New Construction & Renovation South Addition Academic Wing

Robert P. Madison, International

Academic South Wing Addition / House Principal / Special Education

First Level Floor Plan

POTENTIAL TWO

CLASSROOM ADDITION

MOVEABLE WALL

Robert P. Madison, International

Academic South Wing Addition Second Level Floor Plan

POTENTIAL TWO

CLASSROOM ADDITION

MOVEABLE WALL

Robert P. Madison, International

Academic South Wing Addition – Academic Core / Science

Third Level Floor Plan

POTENTIAL TWO

CLASSROOM ADDITION

MOVEABLE WALL

SCIENCE CLASSROOM & LAB

Robert P. Madison, International

Site Section Looking West Academic South Wing Addition

EX

IS

TIN

G R

ES

ID

EN

TIA

L

ALO

NG

R

OB

IN

WO

OD

A

VE

LEVEL 3

LEVEL 2

LEVEL 1

EX

IS

TIN

G H

S

PR

OP

OS

ED

AC

CE

SS

D

RIV

E

42’ 14’

CLA

SS

RO

OM

EX

PA

NS

IO

N A

RE

A

208

PR

OP

ER

TY

LIN

E

Robert P. Madison, International

South Addition View from east side of Robinwood Avenue

Robert P. Madison, International

South Site Plan

Robert P. Madison, International

New Construction East Addition – ‘L’ Room / Dining / Music /

Theater / Physical Education

Robert P. Madison, International

East Addition – ‘L’ Room / Dining / Music / Theater / Physical Education

First Level Floor Plan

Robert P. Madison, International

East Addition – Media / Alumni Foundation / Alternate Track / House Principal

Second Level Floor Plan

BID ALTERNATE: UPPER LEVEL WALKING TRACK

Robert P. Madison, International

‘L’ Room – Dining & Media Spaces East Addition

Robert P. Madison, International

‘L’ Room – Dining & Media Spaces East Addition

Robert P. Madison, International

View from Bunts & Franklin East Addition

Robert P. Madison, International

View of Student Dining and Gymnasium East Addition

Robert P. Madison, International

MAIN OFFICE & HEALTH CENTER ENTRY CAREER TECH ENTRY CIVIC AUDITORIUM ENTRY RANGER SHOP & DINING ROOM / PRE-FUNCTION SPACE ENTRY

“Front Doors High School Entry

Robert P. Madison, International

CONSTRUCTION PHASING

Robert P. Madison, International

During Construction Site Plan

Robert P. Madison, International

Construction Staging Plan Turner / Regency / AKA (Construction Manager)

Pot ent ial