PENGHEMATAN ENERGI
LEWAT DEMAND SIDE
MANAGEMENT serta
LISTRIK PRABAYAR
Dosen : Ir.H.Syariffuddin Mahmudsyah,M.Eng.
Roadmap for Developing the
Energy PlanUnderstand
where we
are todayDecide
where we
want to go
tomorrow
Figure out
the best
ways to get
there
Implement the
approved
measures
Negotiate
through
legislative
process
You
are
here
Repeat
PROGRAM
Demand Side Management
Supply Side Management
www.marketdevelop.com
Key Definitions of DSM Terms
Demand Side Management (DSM) -an attempt by utilities to reduce customers' demand for electricity or energy by encouraging efficiency.(1)
Integrated resource planning (IRP) -a planning process for electric utilities that evaluates many different options for meeting future electricity demands and selects the optimal mix of resources that minimizes the cost of electricity supply while meeting reliability needs and other objectives .(2)
______________(1) National Resources Defense Council
(2) ACEEE
www.marketdevelop.com
DSM Strategies
Energy Efficiency: Reduce energy use overall
Peak Load Reduction: Reduce peak load consumption
Load Shifting: Move load to cheaper times
Load Building: Increase consumption to off-peak hours or increase overall consumption
www.marketdevelop.com
The DSM Planning Process
1. Identify load objectives2. Identify sectors, end-uses and
efficiency measures to target 3. Understand the market for targeted
sectors and measures 4. Develop program designs 5. Conduct cost-effectiveness screening 6. Prepare an implementation plan7. Implement programs8. Evaluate programs
www.marketdevelop.com
CFL Change-
outProgram
Water Heater Load Control Program
Real Time Pricing
Heat Pump Program
Reduceenergy use
overall
Reduce peak load consumption
Move loadto
cheaper times
Increase consumption to off-peak hours or increase
overall consumption
EnergyEfficiency
Peak Load Reduction
Load Shifting
LoadBuilding
How Load Strategies Link to Program Tactics
www.marketdevelop.com
Example: Energy Makeover Contest
Load Strategy:Energy (not just electric) Efficiency
Challenge:Whole House improvements in existing homes
Tactic:Field demonstration through a home energy makeover contest
www.marketdevelop.com
What does my energy bill pay for?
Source: ENERGY STAR
www.marketdevelop.com
Key Message: Energy-Saving Improvements
Dont Cost, They Pay
DSMPast, present and future
SYARIFFUDDIN MAHMUDSYAHDepartment of Electrical Engineering
Faculty Of Industrial TechnologyITS Surabaya
Strategic
growth
From thisStrategic
Saving
To This
Or to
this
DSM can change the LOAD LEVEL
Adapts the system to the environmental requirements
From carbon-fat to carbon-lean
DSM can Change the LOAD SHAPE
Adapts the load to the capacity of the system
Winter Summer Winter or
Day Night Day
Before
After
Future Business The two extremes
Technology driven (Adapt and combine technologies). Stakeholders are already identified actors who enters when the incentives are right
Service driven (Adapt business structure). Some stakeholders are new emerging and integrated to deliver services in accordance with needs and regulations)
Source: http://www.mckinseyquarterly.com/Public_Sector/Economic_Policy/Business_strategies_for_climate_change_2125
Tech
no
logy
Business interest in DSMActor Peak Load Load Level
Generation company No (prices are set on the margin) No (loss of sales)
Systems responsible
(regulator)Yes (to avoid systems break-down)
Possibly regional and in
special situations (to avoid bottlenecks and to maintain systems to develop
as planned)Transmission and
DistributionYes (to maintain systems and avoid bottlenecks)
Energy supplier Sometimes (as a business opportunity to shift loads and operate in pools)
Sometimes (primarily as a marketing instrument)
ESCOsEPCs
Sometimes Yes Indeed
Aggregators Very much Sometimes
Installation and building companies
Yes yes
Past, Present and Future TasksBusiness interest in DSM
Status of Task Peak Load Load Level
Past, Present
and Future
IEA DSM-
Programme
tasks
Further information
on the activities can
be found at
www.ieadsm.org .
Completed Task II: Communications Technologies for
Demand-Side Management
Task VIII: Demand-Side Bidding in a
Competitive Electricity Market
Task XI: Time of Use Pricing and Energy
Use for Demand Management Delivery
Task XIII: Demand Response Resources
Task XV: Network-driven DSM
Task I: Subtask 9 Evaluation
Guidebook on the impact of DSM and Energy
Efficiency Programmes
Task III: Technology procurement
Task V: Marketing of Energy Efficiency
Task VI: Mechanisms for Promoting DSM
and Energy Efficiency in Changing
Electricity Businesses
Task VII: Market Transformation
Task IX: The Role of Municipalities in a
Liberalised System
Task X: Performance Contracting
Task XIV: Market Mechanisms for White
Certificates Trading
Current Task XVII: Integration of Demand Side
Management, Energy Efficiency, Distributed
Generation and Renewable Energy Sources
Task XIX: Micro Demand Response and
Energy Saving
Task XVI: Competitive Energy Services
Task XVIII: Demand Side Management and
Climate Change
Task XX: Branding of Energy Efficiency
Task XXI: Standardisation of Energy
Efficiency Calculations
Proposed - Utility Carbon Offset Toolkit
- Energy Efficiency Portfolio
Standards
The smart grid A happy marriage ?
Source: An EPRI Initiative to Advance the Efficient and Effective Use of Energy
New Technologies
APPROACH TYPE EXAMPLE
Mandated Standards Minimum performance
(MEPS)
Top-runner standard
Agreed Actions Voluntary Agreements
Technology Procurements
Delegated Actions By actor Regional bodies
Municipalities
By Means Commitments
Certificates
Market
Acceptance
Price-responsive customers Taxes; Tax reduction
Price elasticity (Demand
Response)
Non-price responsive
customers
Commoditising
energy efficiency
Energy Services (ESCO)
Labels
Policy drivers
Climate
Strong policy-drive gives many opportunities to find support for focused programmes, especially when fossil fuel is targeted and renewables promoted
Crosscountry activities in e.g. CDM
Emission rights trade and carbon taxes provide financial incentives
Energy Efficiency is the first step on the road to sustainability
Supply
High Density (e.g. fossil, nuclear)
Low Density (e.g. solar, wind, bio)
End
-Use
of
Ener
gy
High Efficiency (Low Intensity) e.g. CFL and LED lighting; Adjustable speed drives
UNECONOMICAL
SUSTAINABLE
Low Efficiency (High Intensity) e.g. Incandescent lamps, Direct electrical heating
PRESENT SYSTEM
HARDLY FEASIBLE
Energy Security
Fuel and system diversification is increasingly important and is coupled to use of distributed generation
Supplier market position and demand elasticity is an issue with policy implications (windfall profits)
Industry development
The ongoing crisis gives policy incentives to develop new industries, especially related to smart grid functions
Job creation
Changes requires new partnerships where technologies meet market skill
Pangsa Kebutuhan Energi Final 2003
Industri
46%
Rumah
Tangga &
Komersial
22%
Transportasi
32%
Listrik
31%
BBM
63%Gas Kota
0%
Briket
0%
LPG
6%
Menurut Jenis
Menurut Sektor
Sektor
Rumah Tangga & Komersial
BBM
100%Gas
0%
Listrik
0%
Sektor
Transportasi
Sektor
Industri
90 TWh
LPG
2%
Batubara
8%
Gas Bumi
17%
BBM
63%Listrik
10%90 TWh
52 Juta KL
505 BSCF
10 Juta Ton
1 Juta Ton
26 Juta KL
BBM
33%
LPG
1%
Batubara
12%
Gas
47%
Listrik
7%
16,5 Juta KL
12 Juta KL
1. DEMAND SIDE MANAGEMENT
1.1. Konservasi EnergiSektor Mendesak Sampai Dengan
2009Program Penghematan Instrumen Keterangan
1 Bangunan
Komersial
1. Pengurangan jam
operasi peralatan
(AC, Escalator, Lift,
Lampu)
2. Pengaturan
temperatur AC (suhu
ruangan minimum
25 derajat C)
3. Audit energi gratis
yang hasilnya harus
diimplementasikan
oleh bangunan
komersial
1. 5% dari
total
konsumsi
energi
2. 0,75% dari
total
konsumsi
energi
3. 10%-15%
dari total
konsumsi
energi
Perda
UU APBN
AC hidup /
mati 1 jam
lebih
lambat /
awal
Biaya dari
pemerintah
2 Rumah
Tangga
1. Penggunaan lampu
hemat energi
Kampanye
(Sosialisas
i)
1. Penggunaan
lampu hemat
energi (UU
Energi)
2. Penyebarluasa
n penggunaan
kompor minyak
tanah hemat
energi
Sektor Mendesak Sampai dengan
2009Program Penghematan Instrumen Keterangan
3 Transportas
i
1. Kawasan Three
in One diperluas
dan penambahan
jalur transportasi
massa
2. Pajak Kendaraan
3. Pembatasan
umur kendaraan
untuk wilayah
tertentu
Perda
Permen
Keu
Perda
Perda
Perlu adanya
areal parkir,
kemauan
pengguna
Tidak
berpengaruh
signifikan
1.Jumlah
angkutan kota
(mikrolet)
dibatasi,
disesuaikan
supply dan
demand
2.Pertamax dan
Pembatasan
Premium
3.Penerapan
pajak BBM
1. DEMAND SIDE MANAGEMENT
1.1. Konservasi Energi (lanjutan)
1. DEMAND SIDE MANAGEMENT
1.1. Konservasi Energi (lanjutan)Sektor Mendesak Sampai
dengan 2009
Program Penghematan Instrumen Ket
6 Lain-Lain 1. Penerangan jalan
umum (PJU),
periklanan dan fasilitas
lain memakai sistem
penerangan hemat
energi
2. Cluster free kerosene
3. Mempertahankan kuota
tetap 59 juta kl per
tahun melalui
pembatasan
penggunaan Premium
dan Minyak Tanah
1. 40%
penghematan dari
konsumsi listrik
PJU
Permen dan
Perda
Perda
SK Dirut
Pertamina
mengacu
UU APBN
Bila diterapkan
secara nasional
mampu menghemat
Rp. 396 miliar per
bulan
Pilot project dapat
dilakukan pada
kawasan tertentu
Laju kenaikan
Premium paling
tinggi,
Kendala dalam
pelaksanaan
Day light
saving, akan
dilakukan studi
lebih lanjut
1. DEMAND SIDE MANAGEMENT
1.2. Diversifikasi Energi
Sektor Mendesak Sampai
dengan
2009Program Penghematan Instrumen Keterangan
1 Rumah
Tangga
Pembangunan
terminal LPG Jawa
Barat untuk
keperluan rumah
tangga
Meningkatkan
konsumsi LPG
menjadi 1 juta ton
per th (sampai
2007), menghemat
penggunaan minyak
tanah 1 juta kl per th
SK Dirut
Pertamina
2 Transportasi Penggunaan
BBG/CNG untuk
Busway koridor II
dan III dan Taksi di
Jakarta
Perda
3 Industri Penggunaan briket
batubara untuk
industri kecil
Pengurangan
pemakaian + 5%
minyak tanah
Kampanye
(sosialisasi)
2. SUPPLY SIDE MANAGEMENT
2.1. Intensifikasi dan Ekstensifikasi Energi
No Jenis Energi 2005 2009 Instrumen Keterangan
1 Gas Bumi 1. Percepatan penemuan cadangan gas baru
di Kaltim, Sulawesi, Arafuru, Sumatera
Tengah dan Selatan, Natuna, Jawa Timur
dan Papua
2. Pengembangan Coal Bed Methane (CBM)
di Sumatera Selatan, Kalimantan Timur
3. Pengembangan / produksi 18 lapangan
dengan cadangan 2P = 12,94 Tscf gas
dengan produksi rata-rata gas 3403 juta
kaki kubik per hari
4. Persiapan pengembangan lapangan gas
dengan cadangan 2P = 2,14 Tscf dengan
produksi rata-rata = 598 juta kaki kubik per
hari.
5. Perencanaan POD gas di Kaltim, Arafuru,
Sumatera Selatan, Natuna, Jawa Timur
dan Papua dengan cadangan eksplorasi
(spekulatif) 8,7 Tscf
Kebijakan Sektor
ESDM dan Insentif gas
domestik
2 Batubara 1. Pengusahaan batubara peringkat
rendah dan penambangan bawah
tanah
2. Perencanaan produksi mencapai 216
juta ton (2010) dan 247 juta ton
(2015)
Insentif sesuai dengan
Keppres No.75/1996
Tentang batubara kalori
rendah dan
penambangan bawah
tanah
2. SUPPLY SIDE MANAGEMENT
2.2. Diversifikasi Energi
No Jenis
Energi
Program 2005 2009 Instrumen Keterangan
1 Gas
Bumi
1. Pipanisasi (Transmisi)
Sumatera Selatan Jawa Barat, Phase I dan II (1000 km, flow rate 650 MMSCFD); Sumatera Tengah SumBagUt (410 km, flow rate 250 MMSCFD); Semarang Gresik (kap 350 500 MMSCFD); Cirebon Semarang (kap 350 500 MMSCFD)
Studi Kelayakan Ruas Pipa Kalimantan Timur-Jawa Tengah
2. Pipanisasi (Distribusi)
1000 km untuk jaringan di beberapa perkotaan di Sumatera dan Jawa
Persiapan pembangunan jaringan Makasar; Pare-pare; Samarinda; Balikpapan; Pontianak
3. Receiving Terminal LNG
Pembangunan di Jawa Barat Persiapan Pembangunan di Jawa Timur
Permen
dan Per
BPH
2 Batubar
a
Pengembangan prasarana terpadu transportasi batubara
Persiapan pembangunan angkutan batubara dengan kereta api di Kalimantan Selatan, Kalimantan Tengah dan Kalimantan Timur
Pembangunan terminal batubara di Sumatera Selatan (3 lokasi), Kalimantan Selatan (2 lokasi), Kalimantan Timur (1 lokasi)
Inter Dep
DESDM,
DepKEu,
DepHub,
dll
3. Tenaga
Listrik
1. Penggantian Energi Primer PLTGU dari BBM ke Gas ( 3.500 MW)
2. Pembangunan PLTU Batubara 4.178 MW, PLTP 753 MW, PLTGU
4.095 MW, dan PLTA 389 MW
3. Mendorong Pembangunan Pembangkit dengan Energi Primer
Terbarukan skala kecil
Sektor
ESDM
2. SUPPLY SIDE MANAGEMENT
2.2.Diversifikasi Energi (lanjutan)
No Jenis
Energi
Program 2005 2009 Instrumen
3 Tenaga
Listrik
(lanjutan)
1. Pembangunan PLTU (1920 MW); PLTP (600 MW); PLTGU
(6455 MW); di Jawa
2. Pembangunan PLTU (2189 MW); PLTP (153 MW); PLTGU
(240 MW); PLTA (361 MW); PLTM (11 MW) di luar Jawa
3. Persiapan pembangunan PLTU (16400 MW); PLTP (60
MW); PLTGU (500 MW); PLTA (1000 MW) di Jawa
4. Persiapan pembangunan PLTU (3634 MW); PLTP (305
MW); PLTGU (86 MW); PLTA (1349 MW); di luar Jawa
5. Studi kelayakan PLTU (15840 MW); PLTGU (4000 MW)
6. Studi kelayakan PLTU (8585 MW); PLTP (425 MW); PLTGU
(1730 MW); PLTA (10 MW)
7. Studi kelayakan pemanfaatan uranium untuk PLTN
Sektor Program Instrumen
Bangunan Komersial
Mall
1. Bangunan komersial di kelompok B3 sudah dikenakan faktor pengali (1,4 2) pada waktu beban puncak / WBP (17.00 22.00), aturan diatas akan dikenakan pada kelompok B2
2. Pembatasan alokasi beban puncak (50%), kelebihan beban dikenakan penalti 2 kali tarif (industri dan bisnis)
3. Pengaturan temperatur AC- AC diset pada suhu 250 C
4. Penataan pencahayaan lampu yang boros
5. Pengurangan jam operasi peralatan (AC, Escalator, Lift, Lampu)- AC dan eskalator dimatikan 1 jam sebelum tutup- Lift diaktifkan mulai lantai 3
Surat Persetujuan MESDM kepada PT PLN
Instruksi Gubernur ke jajaran Pemda DKI Jakarta;
Surat Edaran Gubernur kepada pengelola gedung perkantoran swasta, pengelola gedung jasa perdagangan, pengelola billboard di wilayah DKI Jakarta
Kantor Pemerintah
1. Pengurangan jam operasi peralatan (AC, Escalator, Lift, Lampu)- AC dan eskalator dimatikan 1 jam sebelum tutup kantor- Lift diaktifkan mulai lantai 3- Diatas jam 17.00 AC central dimatikan- AC split untuk lembur
2. Pengaturan temperatur AC- AC diset pada suhu 250 C
3. Penataan pencahayaan lampu untuk assesoris yang boros
Instruksi Presiden (Inpres);
Instruksi Gubernur ke seluruh jajaran pemda DKI Jakarta
Sektor Program Instrumen
Rumah Tangga 1. Penggunaan lampu hemat energi
2. Meneruskan program Pangkas Listrik 17.00 22.00
3. Penyetelan AC di rumah
4. Penggalakan penggunaan produk-produk baru untuk mengurangi konsumsi listrik (a.l: Menyala 450 dan 900 VA, Bersinar, Layanan Daya Maksimal, Penggunaan Meter Prabayar)
5. Pelanggan di atas 450 KV dikenakan surcharge apabila harga minyak mentah di atas US$ 45/barel
Sosialisasi dari PLN dengan pemasangan iklan
Surat Persetujuan MESDM kepada PT PLN
Transportasi 1. Kendaraan pribadi dengan 2000 CC keatas menggunakan BBM Pertamax di Sumatera, Jawa dan Bali (implementasi secara bertahap)
2. Pajak Kendaraan bermotor diperbesar
3. Menaikkan tarif parkir kendaraan bermotor
4. Menaikkan bea masuk dan PPN barang mewah
5. Pemakaian BBG untuk kendaraan umum (pertama dilakukan di DKI)
6. Memperluas kawasan dan waktu pemberlakuan Three in One serta menambah jalur transportasi massa
Inpres;SK PERTAMINA
Permendagri dan Perda;Usulan Pemda ke Mendagri (sedang dalam proses)
Perda
Surat MESDM ke Menkeu
Surat MESDM ke Menkeu;dan Perda
Perda (disesuaikan dengan situasi dan kondisi)
Sektor Program Instrumen
Industri 1. Audit energi harus dilaksanakan oleh industri (selektif yang lahap energi)
2. Penetapan tarif waktu beban puncak yang lebih tinggi untuk pelanggan double tariff (diatas 200 kVA)
3. Penggalakan penggunaan produk-produk baru untuk mengurangi konsumsi listrik (a.l. : Bersinar, Layanan Daya Maksimal)
4. Pemberlakuan harga internasional BBM untuk industri pertambangan, industri yang berorientasi ekspor dan industri berat lainnya
Surat MESDM kepada Menteri Perindustrian
Surat Persetujuan MESDM kepada PT PLN
Surat MESDM kepada PT Pertamina
Lain-Lain 1. Penerangan jalan umum (PJU), periklanan dan fasilitas lain memakai sistem penerangan hemat energi
2. Penegakan hukum bagi pemakai listrik ilegal/pencuri dan pelaku penyalahgunaan BBM
3. Pegawai pemerintah menggunakan pakaian dinas harian, kecuali pada acara kenegaraan, agar dapat menyesuaikan dengan suhu gedung 250 C
4. Eliminasi diesel dari komposisi BBM sehingga hanya 3 jenis BBM subsidi PKS (Premium, Kerosene, Solar)
5. Mengurangi jam siar TV
Perda
Surat MESDM kepada Kapolri dan Ketua Timdu BBM
Surat MESDM ke Menpan
Pendekatan DESDM, Pertamina dengan konsumen diesel
Surat MESDM ke Menkominfo