TREATMENT OF EXPANSION JOINT AT
BLOCK 115 BUILDINGPAKISTAN AIR FORCE
PAF ACADEMY RISALPUR
PICTURES OF JOB DONE
www.idealsolutionspk.com
Hump was created to stop
leakage by Client’s Engineer on
expansion joint
Hump was created to stop
leakage by Client’s Engineer on
expansion joint
Removal of Hump created by
Client’s Engineer on expansion
joint
Application of crystalline
waterproofing material on
surrounding areas of joint
Crystalline waterproofing material
Crystalline waterproofing material
Cutting of actual expansion joint
Cutting of actual expansion joint
Cutting of actual expansion joint
Removal of existing sealant from
expansion joint
Found wetness after the Removal
of existing sealant from expansion
joint
Found wetness after the Removal
of existing sealant from expansion
joint
Found water stopper after going
further deep
There was no concrete under
water stopper & Steel was wet
There was no concrete under
water stopper & Steel was wet
There was
no concrete
under
water
stopper &
Steel was
wet and
rusted as
well
The depth
of removal
of materials
job from
actual roof
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Removal of
loose
concrete
Repair is
done by
chemicals
and grouts
Repair is
done by
chemicals
and grouts
Repair is
done by
chemicals
and grouts
Sealant is being applied on the
bottom of concrete slab
Sealant is being applied on the
bottom of concrete slab
Sealant
is being
applied
on the
bottom
of
concrete
slab
Sealant
is being
applied
on the
bottom
of
concrete
slab
Finishing of
sealant on
the bottom
of concrete
slab
Finishing
of sealant
on the
bottom of
concrete
slab water
is standing
over it
Finishing
of sealant
on the
bottom of
concrete
slab water
is standing
over it
Finishing
of sealant
on the
bottom of
concrete
slab water
is standing
over it
Sealing the
joint up to the
top of slab,
Waterproofing
coating was
done and
water is
standing over
it
Sealing the
joint up to the
top of slab,
Waterproofing
coating was
done and
water is
standing over
it
Sealing the
joint up to the
top of slab,
Waterproofing
coating was
done and
water is
standing over
it
Sealing the
joint up to
the top of
slab, Water-
proofing
coating was
done and
water is
standing
over it
Sealing the
joint up to
the top of
slab, Water-
proofing
coating was
done and
water is
standing
over it
Sealing the
joint up to
the top of
slab, Water-
proofing
coating was
done and
water is
standing
over it
Final Water-
proofing
coating is
being applied
Final Water-
proofing
coating is
being applied
Final leveling
by cement
sand screed is
being done
by putting
the sheet on
expansion
joint
Final leveling
by cement
sand screed is
being done
by putting
the sheet on
expansion
joint
Final leveling
by cement
sand screed is
being done
by putting
the sheet on
expansion
joint
Final leveling
by cement
sand screed is
being done
by putting
the sheet on
expansion
joint
Final leveling
by cement
sand screed is
being done
by putting
the sheet on
expansion
joint