Post on 14-Jul-2016
description
Joint Special Meeting of The Board of Trustees
Gregory-Portland ISD and
The City Council City of Portland
March 22, 2016
Growth in the City and School Communities
March 22, 2016
0
5,000
10,000
15,000
20,000
25,000
City of Portland Estimated Population
BRAC
New Single Family Residential PermitsFiscal Year 2015-2016
0
20
40
60
80
100
120
140
PRO
JECT
ED
G-PISD Enrollment History
3,000
3,250
3,500
3,750
4,000
4,250
4,500
4,750
5,000
0
10,000
20,000
30,000
40,000
50,000
60,000
2016 2020 2025 2030 2035 2040 2045 2050
City of Portland Projected PopulationAssuming 2.0% and 3.0% Growth Rate
G-PISD – Gearing Up for Growth
• Long-range facilities planning based on substantial student and community growth projections
• Conservative financial management to attain goals while meeting expected needs
• Appreciative of community support (Bonds 2012 & 2015) to support increase in student enrollment
Facilities: Capacity & Load Comparisons
Campus Building
Age Building Capacity Enrollment % of Capacity
Optimum Maximum Capacity
Andrews 36 415 344 83% 85-90%
Austin 8 575 472 82% 85-90%
Clark 22 671 618 92.1% 85-90%
East Cliff 58 354 398 112.4% 85-90%
Facilities: Capacity & Load Comparisons
Campus Building Age
Building Capacity Enrollment % of
Capacity
Optimum Maximum Capacity
Intermediate 51 729 472 65% 85%
Junior High 51 1,086 729 67.1% 80-85%
High School 13 1,800 1,357 75.3% 70-80%
Facilities: Expansion in Progress
• Only 3 of 7 campuses have life expectancy beyond 20 yrs – High School, W.C. Andrews & S.F. Austin
• There are 2 of 7 campuses exceeding optimum capacity – East Cliff & T.M. Clark
• Bonds 2012 & 2015 are addressing some of these needs.
• Current construction projects meet immediate needs, while also considering future student enrollment growth.
Student Enrollment Growth
4277 4253 4341 4315
4197 4292
4433 4488 4518
4588 4606
4797
4989
5147
5284
5469
5645
5878 5920 5949 6066
3500
4500
5500
6500
ACTUAL PROJECTED
Bond 2012: East Cliff Elementary School $15.9 Million Project
Bond 2012: East Cliff Elementary School
• New campus will be nearly twice the size (80,392 sq. ft.) of the current campus (44,908 sq. ft.)
• Feature state-of-the-art security system
• Top-quality energy efficiency, 90% LED lighting
• Three times the parking space of current campus
• High-resolution exterior digital marquee
Bond 2015: Making Progress
Bond 2015 Projects Cost Estimate Completion to Date
Land Aquisition $1 Million 100%
New Elementary School $25 Million 5%
New Middle School $55 Million 0%
High School Addition & Career Tech Center $16.5 Million 0%
Capitalization Items $19.5 Million 50%
$117 Million Bond Package
Bond 2015: Making Progress 5-Year Capitalization Items Cost Estimate Completion to Date
Band Instruments – HS & Junior High $585,000 90%
Video Technical $300,000 10%
Health Sciences $69,000 80%
Secondary & Elementary Music $200,200 85%
Athletic Uniforms $97,200 95%
Theater $28,800 10%
Technology $3,400,00 5%
School Buses $1,452,000 25%
Service Vehicles $150,000 25%
HVAC Equipment $255,000 10%
Furniture @ New Campuses $4,875,000 0%
Maintenance Projects (Short-Term Projects, Athletic Restrooms, Concessions Stands, Ticket Booths)
$8,087,600 15%
Bond 2015: Land Acquisition & New Elementary School
Bond 2015: Land Acquisition & New Elementary School
Bond 2015: Land Acquisition & New Elementary School
• Land acquired: 58 acres on Moore Ave.
• New elementary campus planned to be larger than new East Cliff Elementary School at approx. 92,000 sq. ft. (new East Cliff is 80,392 sq. ft.)
Estimated Tax Values through 2035
Low Wealth to High Wealth
• Big changes will affect our tax roll (revenue) very soon
• As we transition to becoming a ‘high wealth’ district, there will be an even greater need for sound financial planning
• More local income also means an increase in contributions to the state – thus, we will continue to rely on community support
• We will continue to exercise a conservative approach to determine budgets, project revenue, and maintain a healthy fund balance
City of Portland Future Growth Corridor
March 22, 2016
2014 Annexation • 2.9 Square Miles • Up to 1,200 new home sites
2015 Annexation • 1.3 Square Miles • Up to 440 new home sites
TPCO voestalpine
Oxy Ethylene
Cheniere Sherwin
Future Growth Corridor 13,000 Ac
Future Growth Corridor 13,000 Ac
GP-ISD
Development of Workforce Education
March 22, 2016
Del Mar College Serving Portland, GPISD
and San Patricio County
Lenora Keas Interim Provost and Vice President of Instruction and Student Services
And Vice President of Workforce Development and Strategic Initiatives
43
Corpus Christi Ship Channel
M & G Plastics
NSI Occidental Petroleum
LyondellBasell Cheniere LNG
Martin Operating
T.P.C.O. American Tubular
La Quinta Terminal
Voestalpine Steel
Trafigura
Castleton Commodities
Oxy Propane
Liquid
Gas
OXY ETHYLENE
KIEWIT
SHERWIN ALUMINA
OXY ENERGY
INGLESIDE
TRAFIGURA BUCKEYE
ELEMENTIS
AIR LIQUIDE
CELANESE BISHOP, TX
AEP TEXAS
LYONDELLBASELL
CITGO WEST
FLINT HILLS
MAGELLAN
GULF MARINE FABRICATORS
FLINT HILLS INGLESIDE
MARTIN MIDSTREAM
GULF COMPRESS
TPCO CHENIERE
VOESTALPINE
M&G
EMAS
PLAINS
CASTLETON
PLAINS
BTB REFINING
INTERSTATE GRAIN PLAINS
CHENIERE CONDENSATE
EXCALIBUR
DUPONT VALERO
HALIBURTON
BAY
ADM GRAIN ELEVATOR SUPERIOR
WEIGHTING
MARKWEST JAVELINA
NUSTAR
FLINT HILLS EAST
TEXAS LEHIGH/ NORTHERN WHITESAND
TOPAZ POWER GROUP
CITGO EAST
$40 BILLION NEW INVESTMENT
BALANCING EXPLOSIVE GROWTH WITH CLEAN AIR AND CLEAN WATER
PLAINS
Del Mar College Worldwide Impact
Targeted Occupations 2015 Workforce Solutions of Coastal
Bend by SOC Code
• Bus and Truck Mechanics and Diesel Engine Specialist
• Chemical Plant and Systems Operators • Electrical and Electronics Engineering
Technicians – Instrumentation Technicians • Heating, Air Conditioning, and Refrigeration
Mechanics • Machinists – Including CNC • Operating Engineers and other Construction
Equipment Operators • Petroleum Pump System Operators, Refinery
Operators – Process Technology • Rotary Drill Operators, Oil and Gas • Welders, Cutters, Solderers and Brazers
47
Targeted Occupations 2015 • Business – Accountants, Paralegals and
Legal Assistants • Education – School Teachers • Health Care – EMS, Occupational Health
and Safety Specialists, Physical Therapists Assistants, Registered Nurses
• Public Service – Firefighters, Police and Security Guards
• Miscellaneous – Aircraft Mechanics and Service Technicians
• Emerging Technology Occupations
48
Industry Partners – Texas Workforce Skills Grants and Other Support Voestalpine Cheniere Energy Lyondell Basell Chemours Occidental Chemical – Oxy Chem/Mexi Chem CB&I TPCO America Dynamic M & G Polymers Sherwin Alumina Flint Hills Resources CITGO Petroleum Valero Energy
Programs at GPISD • Dual Credit in Associate of Liberal Arts
and Associate in Applied Science Degrees, Certificates and Industrial Certifications – NCCER Certification
• Students Earn Credits in General Education Courses, Welding, and Process Technology
• Non-Credit Courses and Corporate Training
• Additional Options in Applied Health Sciences and Engineering
Welding and Process and Instrumentation Technology
Del Mar College Serving Workforce $2.2 Million Investment
Process Technology and Instrumentation Pilot Plant
Pilot Plant
Career & Technology Education (CTE) • Bond 2015: High School Addition & Career Tech Center
• Planning to provide as many dual-credit courses as possible (partnership with Del Mar College)
• Goal to provide enough dual-credit courses so that students can obtain certifications and/or Associates’ degrees in addition to a high school diploma
• Anticipating workforce needs to prepare program offerings relevant to available job opportunities in our area
Sample of Dual-Credit Courses • PROCESS TECHNOLOGY: Purchased several
models/simulators for this year, now part of curriculum
Sample of Dual-Credit Courses • WELDING: Doubling size of welding lab this
Spring/Summer to accommodate increase in student enrollment – Many students are now ready to test for NCCER certification in
Welding
Sample of Dual-Credit Courses • HEALTH SCIENCE: As of this year, we now have four
students who have earned a certification in phlebotomy
• ENGINEERING: Now registering students for classes beginning next year, 2016-2017
• VIDEO TECHNOLOGY: Several students involved with audio/visual production classes (GPTV) will soon test for an Adobe certification
• Full course catalog now available: www.g-pisd.org
Joint School-Library Services
March 22, 2016
The concept of a combined public and
school library is one that has worked for several communities in Texas and elsewhere and is being explored for the City of Portland and Gregory-Portland ISD to maximize efficiencies with shared resources.
Concept & Precedent
• Improved collection of resources
• Maximization of financial resources
• Facilities & Accessibility • Availability of new
technology for community • Enhanced Programs &
Services • Extended Hours of
Operation • Creation of a community
focal point for adults and youth
Potential Advantages
Issues to be Considered
• A clear sense of our shared mission would be vital
• Public support and involvement are essential
• Staffing and funding • Blending adult usage with
student usage • Differences in technology
needs for varied library patrons
Texas Library Statistics
887 Public Libraries 8,400 Public School Libraries
29 Combined Public/School Libraries
City of Portland Bond 2016 Briefing
March 22, 2016
Bond Election History
• 1969 - GO streets and drainage • 1971 - GO street improvements • 1978 - GO storm drains, new PD, library expansion • 1993 - Adopted ½¢ Type B Sales Tax (Community
Center) • 2003 - Adopted ½¢ Venue Sales Tax (Aquatics
Center)
• 95% of our current debt is serviced by Certificates of Obligation
Excellent Financial Health
• General Obligation Bond Rating - AA • Utility Bond Insured Rating - AA • Sales Tax Bond Insured Rating - AA • Venue Sales Tax Insured Rating - AA
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
$1,800
$2,000
Asse
ssed
Val
ue in
Mill
ions
Total Assessed Value - Projected
2% growth assumed beyond 2018
Major Infrastructure and Facilities Projects
$0
$10
$20
$30
$40
$50
$60
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Mill
ions
Project Expenditures by Class
Streets
Utilities
Recreation Facilities
Community Center
Community Center Expansion
• 1993—Venue Sales Tax Election • 1995—Constructed • 2012—Roof replacement • 2013—New HVAC and lighting controls • 2014—Elastomeric coating and envelope
repairs
Community Center Expansion
Element Estimated Cost Minor Renovations $800,000 Major Renovations $1,800,000 New Construction $7,300,000
Site Work $900,000
Total Proposed Project $10,800,000
Sports Complex & Municipal Park Expansion
Softball Complex and Municipal Park Element Estimated Cost
Softball Complex Rehabilitation/Maintenance $2,000,000 Expansion $4,600,000 Artificial Turf (Full) $3,200,000 Municipal Park
Rehabilitation/Maintenance $2,000,000
Expansion $4,500,000
Artificial Turf (Full) $1,600,000
Project Total $17,900,000
(Less Certificate of Obligation issued July, 2015) ($3,500,000)
Total Proposed Project $14,400,000
Ad Valorem Tax Impact
$0.00
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
I&S
Tax
Rate
per
$10
0 Va
luat
ion
I&S Rate with GO Bond Projects
I&S Rate without GO Bond Projects
Tax Impact to the Homeowner
G.O. Bond Projects
Tax Rate Impact
Annual Impact
Monthly Impact
Daily Impact
Community Center $0.0288 $43.20 $3.60 $0.12
Sports Complexes $0.0312 $46.80 $3.90 $0.13
Total $0.060 $90.00 $7.50 $0.25
Based on the average taxable home value of $150,000 @ $0.06
• To minimize the initial tax impact, the bonds and the certificates will be sold in installments over a 3-year period.
• Taxpayers will not feel the year over year impact until FYE 2019.
• Illustration of estimated I&S Tax Rate Requirement if all bonds approved:
Bond Issuance Plan
FYE 9/30: I&S Tax Rate
2017 20.73¢
2018 19.09¢
2019 25.09¢
2016 Uniform Election Calendar
• Early voting begins April 25, 2016 • Early voting ends May 3, 2016 • Election day May 7, 2016