Post on 29-May-2020
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PROJECT DESCRIPTION AND SITE PLAN - 1
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS
Joe W. Brown Memorial Park is a one-hundred-eighty-six acre park located on Read Boulevard in New Orleans East. The D-CDBG West Side Enhancements Project focuses on the park west of the lagoon. Since the 1950’s, Joe Brown Park has served as a primary natural and recreational amenity to the New Orleans East Community. Reconceived as a contemporary park with a distinctive identity, the 2013 design seeks to actively participate in the revitalization of the New Orleans East community post-Hurricane Katrina.
Proposed Park Enhancements on Read Boulevard include:(Funding is secured for this work)New Passive Green Forecourt and New Monument Signage at the Primary Entrance on Read Boulevard:-Park gates set back from the property edge on Read Boulevard to allow for a more open, inviting entrance and to create the forecourt area for use by East New Orleans Regional Library patrons and future hospital patrons without entering the Park-Sidewalk connections to the Library and to Read Boulevard -New tree landscaping along the entry drives to reinforce the Park component at the Entrance -Removal of the cyclone fencing between the Library and the Park to promote usage between Library and Park-Benches-New monument signage to identify the entrance
Within Joe Brown Park, Enhancements include:(Funding is secured for this work)-Improvements at Baseball Field #1: Reorient, regrade, and hyrdroseed; new scoreboard, equipment and accessories -New 2960 SF Picnic Shelter with site furniture, accessories, and signage -New Asphalt Walking Path throughout West side, connecting existing “Inner Loop” Walking Path, East New Orleans Regional Library, Read Boulevard, and new Picnic Shelter; New Nature Path on peninsula; New Pedestrian Bridge over lagoon connecting to East side -New Tennis Forecourt at existing Tennis Courts, including landscaping, lighting, and site furniture -New Signage and Wayfinding throughout the Park-New Site Furniture throughout the Park
(Funding is NOT secured for this work)-Future Asphalt Walking Path from Baseball Field #1 to Spartan Field -Landscaping Master Plan for West Side of the Park
SS
Td
Td
Td
Qp
Qp Qp
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Qn
Qv
Qv
Qv
Qv
Qa
Qn
Ls
Ls
Qn
LsQn
Qa
Ul
Ul
Qn
Ua
UaAb
QvQn
Fp
Td
Fp
Fp
Qn
Fp
Fp
Td
Fp
Td
Td
Ls
Ls
Ls
Qm
Qm
Td
Td
Td
Td
Td
Td
Td
Td
QnQn
Qn
Qn
Qn
Qv
Qv
Qv
Ar
Ar Ar
Ar
Ar
Ar
Ar
ArAr
ArArArArArAr
ArAr
Ar
Ar
Ar
Po
PoPoPoPoPo
PoPo
PoPo
PoPo
PoPo
PoPo
PoPo
PoPo
Po
Po
PoPo
PoPo
PoPo
PoPo
PoPo
Qa
Qa
Qn
Qa
Ab
Qa
Ls
Cv
Cv
Cv
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
TdTd
TdTd
TdTd
TdTd
TdTd
TdTd
Td
Ar
ArAr
ArArArArAr
Ar
Ar
Ar
ArAr
Ar
Bn
Bn
Po
REFORESTATION AREA 1
REFORESTATION AREA 2
Ab
Pb
Pb
Mv
Mv
Mv
Mv
Mv
MvMv
MvMv
Mv
Mv
Mv
Mv
MvMv
MvMv
Mv
Td
TdTd
Td Td
Td
Td
Po
Po
TdLs
Po Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Ar
Ar
Qv
Qv
Ar
Po
Po
Po
Po
Po
Qv
TdTd
Qv
Qv
Td Td
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Mc
Mc
Mc
Mc
Mc
Mc
Mc
Td
Td
TdAr
Ar
Ar
Td
Td
Td
Td
Td
Td
Fp
Fp Td
Td
TdTd
Td Td
Ar
Qv
Ar
Ar
Ar
Ar
Td
Td
Td
Qp
Qm
Td
Td
Td
Td
Qp
Qp
Qp
Qp
Qp
Qp
Qp
TdTd
Td
Td
Td
Qm
Qm
Qm
Fp
Ar
Ar
Ar
Td
Td
Fp
Mc
Mc
McMc
McMc
Mc Sn
Fp
Mc
McSn
Sn
NaNa
TdTd
Td
TdTdTd
Td
Ar
Ar
Qm
Qm TdTd
Qp
Qp
Qp
Qp
TdTd
Td
Td
Ar
Fp
Fp
Qn
Qn
Qn
Ls
Qa
Ua
Ua
Fp
Ar Qn
Qn
Qv
Qv
Qv
Qv
Qn
Qn
Qn
Ar
Ar
Ar
Ar
Qv Qv
Qv
Sb
Sb
Sb
Qv
Po
ArQv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Td
Qp
Ar
LsQa
Qn
Qn Qn
Ul
Ul
Qn
TdTd
Td
Td
Td
Td
Ar
Td
Ar
Ls
Qp
Qp
Qp
Qp
TdTd
Po
Ar
Ar
Fp
Ar
Po
Ua
Fp
Po
Po
LsQp
Ua
Td
Td
Td
TdTd
Td
TdTd
Td
Td
QvQv
QvTd
TdTdTd
Td Td
Fp
Ls
Ar FpFp
Fp
Ls
Ls
Qp
UaUa
Ua
ArTd
Td
Td
Td
FpFp
Fp
FpFp
Ar
Ar
Qp
Ls
Qm
Qm
Ls
Qm
Td
Td Td
Ar
ArArUa
Td
Td
TdTd
Td
Na
Td
TdTd
Sn
Na
Qm
Qa
Qm
Qn
Fp
TdSn
SnSn
SnSn
Fp
Td
Sn
Sn
Sb
Na
Fp
Td
Td
Td
Sb
Qv Qv
Qv
Qv
Ar
Ar
Po
Po
Po
Po
Po
PoPoPo
PoPoPo
PoPo
PoPo
SS
Td
Td
Td
Qp
Qp Qp
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Qn
Qv
Qv
Qv
Qv
Qa
Qn
Ls
Ls
Qn
LsQn
Qa
Ul
Ul
Qn
Ua
UaAb
QvQn
Fp
Td
Fp
Fp
Qn
Fp
Fp
Td
Fp
Td
Td
Ls
Ls
Ls
Qm
Qm
Td
Td
Td
Td
Td
Td
Td
Td
QnQn
Qn
Qn
Qn
Qv
Qv
Qv
Ar
Ar Ar
Ar
Ar
Ar
Ar
ArAr
ArArArArArAr
ArAr
Ar
Ar
Ar
Po
PoPoPoPoPo
PoPo
PoPo
PoPo
PoPo
PoPo
PoPo
PoPo
Po
Po
PoPo
PoPo
PoPo
PoPo
PoPo
Qa
Qa
Qn
Qa
Ab
Qa
Ls
Cv
Cv
Cv
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
TdTd
TdTd
TdTd
TdTd
TdTd
TdTd
Td
Ar
ArAr
ArArArArAr
Ar
Ar
Ar
ArAr
Ar
Bn
Bn
Po
REFORESTATION AREA 1
REFORESTATION AREA 2
Ab
Pb
Pb
Mv
Mv
Mv
Mv
Mv
MvMv
MvMv
Mv
Mv
Mv
Mv
MvMv
MvMv
Mv
Td
TdTd
Td Td
Td
Td
Po
Po
TdLs
Po Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Ar
Ar
Qv
Qv
Ar
Po
Po
Po
Po
Po
Qv
TdTd
Qv
Qv
Td Td
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Mc
Mc
Mc
Mc
Mc
Mc
Mc
Td
Td
TdAr
Ar
Ar
Td
Td
Td
Td
Td
Td
Fp
Fp Td
Td
TdTd
Td Td
Ar
Qv
Ar
Ar
Ar
Ar
Td
Td
Td
Qp
Qm
Td
Td
Td
Td
Qp
Qp
Qp
Qp
Qp
Qp
Qp
TdTd
Td
Td
Td
Qm
Qm
Qm
Fp
Ar
Ar
Ar
Td
Td
Fp
Mc
Mc
McMc
McMc
Mc Sn
Fp
Mc
McSn
Sn
NaNa
TdTd
Td
TdTdTd
Td
Ar
Ar
Qm
Qm TdTd
Qp
Qp
Qp
Qp
TdTd
Td
Td
Ar
Fp
Fp
Qn
Qn
Qn
Ls
Qa
Ua
Ua
Fp
Ar Qn
Qn
Qv
Qv
Qv
Qv
Qn
Qn
Qn
Ar
Ar
Ar
Ar
Qv Qv
Qv
Sb
Sb
Sb
Qv
Po
ArQv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Td
Qp
Ar
LsQa
Qn
Qn Qn
Ul
Ul
Qn
TdTd
Td
Td
Td
Td
Ar
Td
Ar
Ls
Qp
Qp
Qp
Qp
TdTd
Po
Ar
Ar
Fp
Ar
Po
Ua
Fp
Po
Po
LsQp
Ua
Td
Td
Td
TdTd
Td
TdTd
Td
Td
QvQv
QvTd
TdTdTd
Td Td
Fp
Ls
Ar FpFp
Fp
Ls
Ls
Qp
UaUa
Ua
ArTd
Td
Td
Td
FpFp
Fp
FpFp
Ar
Ar
Qp
Ls
Qm
Qm
Ls
Qm
Td
Td Td
Ar
ArArUa
Td
Td
TdTd
Td
Na
Td
TdTd
Sn
Na
Qm
Qa
Qm
Qn
Fp
TdSn
SnSn
SnSn
Fp
Td
Sn
Sn
Sb
Na
Fp
Td
Td
Td
Sb
Qv Qv
Qv
Qv
Ar
Ar
Po
Po
Po
Po
Po
PoPoPo
PoPoPo
PoPo
PoPo
SS
Td
Td
Td
Qp
Qp Qp
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Qn
Qv
Qv
Qv
Qv
Qa
Qn
Ls
Ls
Qn
LsQn
Qa
Ul
Ul
Qn
Ua
UaAb
QvQn
Fp
Td
Fp
Fp
Qn
Fp
Fp
Td
Fp
Td
Td
Ls
Ls
Ls
Qm
Qm
Td
Td
Td
Td
Td
Td
Td
Td
QnQn
Qn
Qn
Qn
Qv
Qv
Qv
Ar
Ar Ar
Ar
Ar
Ar
Ar
ArAr
ArArArArArAr
ArAr
Ar
Ar
Ar
Po
PoPoPoPoPo
PoPo
PoPo
PoPo
PoPo
PoPo
PoPo
PoPo
Po
Po
PoPo
PoPo
PoPo
PoPo
PoPo
Qa
Qa
Qn
Qa
Ab
Qa
Ls
Cv
Cv
Cv
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
Td
TdTd
TdTd
TdTd
TdTd
TdTd
TdTd
Td
Ar
ArAr
ArArArArAr
Ar
Ar
Ar
ArAr
Ar
Bn
Bn
Po
REFORESTATION AREA 1
REFORESTATION AREA 2
Ab
Pb
Pb
Mv
Mv
Mv
Mv
Mv
MvMv
MvMv
Mv
Mv
Mv
Mv
MvMv
MvMv
Mv
Td
TdTd
Td Td
Td
Td
Po
Po
TdLs
Po Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Ar
Ar
Qv
Qv
Ar
Po
Po
Po
Po
Po
Qv
TdTd
Qv
Qv
Td Td
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Po
Mc
Mc
Mc
Mc
Mc
Mc
Mc
Td
Td
TdAr
Ar
Ar
Td
Td
Td
Td
Td
Td
Fp
Fp Td
Td
TdTd
Td Td
Ar
Qv
Ar
Ar
Ar
Ar
Td
Td
Td
Qp
Qm
Td
Td
Td
Td
Qp
Qp
Qp
Qp
Qp
Qp
Qp
TdTd
Td
Td
Td
Qm
Qm
Qm
Fp
Ar
Ar
Ar
Td
Td
Fp
Mc
Mc
McMc
McMc
Mc Sn
Fp
Mc
McSn
Sn
NaNa
TdTd
Td
TdTdTd
Td
Ar
Ar
Qm
Qm TdTd
Qp
Qp
Qp
Qp
TdTd
Td
Td
Ar
Fp
Fp
Qn
Qn
Qn
Ls
Qa
Ua
Ua
Fp
Ar Qn
Qn
Qv
Qv
Qv
Qv
Qn
Qn
Qn
Ar
Ar
Ar
Ar
Qv Qv
Qv
Sb
Sb
Sb
Qv
Po
ArQv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Qv
Td
Qp
Ar
LsQa
Qn
Qn Qn
Ul
Ul
Qn
TdTd
Td
Td
Td
Td
Ar
Td
Ar
Ls
Qp
Qp
Qp
Qp
TdTd
Po
Ar
Ar
Fp
Ar
Po
Ua
Fp
Po
Po
LsQp
Ua
Td
Td
Td
TdTd
Td
TdTd
Td
Td
QvQv
QvTd
TdTdTd
Td Td
Fp
Ls
Ar FpFp
Fp
Ls
Ls
Qp
UaUa
Ua
ArTd
Td
Td
Td
FpFp
Fp
FpFp
Ar
Ar
Qp
Ls
Qm
Qm
Ls
Qm
Td
Td Td
Ar
ArArUa
Td
Td
TdTd
Td
Na
Td
TdTd
Sn
Na
Qm
Qa
Qm
Qn
Fp
TdSn
SnSn
SnSn
Fp
Td
Sn
Sn
Sb
Na
Fp
Td
Td
Td
Sb
Qv Qv
Qv
Qv
Ar
Ar
Po
Po
Po
Po
Po
PoPoPo
PoPoPo
PoPo
PoPo
SS
READ BOULEVARD
AUDUBON LOUISIANA NATURE CENTER
DWYER ROADNOFD ENGINE 36
NOPD 7TH DISTRICT
LAKE FOREST BOULEVARD
JOE W. BROWN MEMORIAL PARK5601 READ BOULEVARDNEW ORLEANS, LA 70127
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 RENDERING - SITE PLAN - 2
BASEBALL FIELD
NEW PICNIC SHELTER
REFORESTATION
PRIMARY ENTRANCE
READ BOULEVARD
BLEACHERS
PEDESTRAIN BRIDGE
ASPHALT PATH
AUDUBON LOUISIANA NATURE CENTER
DWYER ROADNOFD ENGINE 36
NOPD 7TH DISTRICT
JOE BROWN PARK WEST SIDE ENHANCEMENTS SITE PLAN
TENNIS FORECOURT
NATURE PATH
LAKE FOREST BOULEVARD
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PHOTOGRAPHS OF EXISTING SITE - 3
ENTRANCE ON READ BLVD. ENTRANCE ON READ BLVD.
SITE OF NEW PICNIC SHELTER ON LAGOONEXISTING PICNIC SHELTER
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 RENDERING - NEW PARK ENTRY, READ BLVD. - 4
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 ENTRANCE SIGN - ELEVATIONS & SECTIONS - 5
13'-0"
PRE-CAST CONCRETEPANEL, TYP.,CONNECTION BY GC
FABRICATED METAL LETTERSIGNAGE, 1'-0" TALL, SIGNAGETYPE 6
FABRICATED METAL LETTERSIGNAGE, 3'-0" TALL, SIGNAGETYPE 6
33'-1
1/2"
8'-6"
8'-0"
8'-0"
8'-0"
TRANSLUCENTRESINOUS PANEL, TYP.,REMOVABLE FORMAINTENANCE
TRANSLUCENTRESINOUS PANEL, TYP.,REMOVABLE FORMAINTENANCE
4'-0"
12'-0"
PRE-CAST CONCRETEPANEL, TYP.,CONNECTION BY GC
TRANSLUCENTRESINOUS PANEL,TYP., REMOVABLEFOR MAINTENANCE
TRANSLUCENTRESINOUS PANEL, TYP.,
REMOVABLE FORMAINTENANCE
PRE-CAST CONCRETEPANEL, TYP.,CONNECTION BY GC
1.5" UNISTRUT
PT-1
PT-1
1'-7"
1/A205
2/A20
5
32'-2
1/2"
4'-0"
TRANSLUCENTRESINOUSPANEL
PRE-CAST CONCRETEPANEL, TYP., CONNECTIONBY GC
1.5" UNISTRUT@ 2'-0" O.C.VERTICAL
PT-1
32'-2
1/2"
13'-0"
TRANSLUCENT RESINOUSPANEL, TYP., REMOVABLE FORMAINTENANCE
1.5" UNISTRUT@ 2'-0" O.C.VERTICAL
1'-7"
PT-1
4'-0"
TRANSLUCENT RESINOUSPANEL, TYP., REMOVABLE FORMAINTENANCE
CUT ALUMINUMSIGNAGE, 6" TALL,SIGNAGE TYPE 1
PRE-CASTCONCRETEPANEL, TYP.,CONNECTIONBY GC
32'-2
1/2"
8'-7 1
/2"8'-
0"8'-
0"7'-
5 1/2"
12'-0"
7'-6"
7'-6"
3"
6"
8"
CONNECTION TOSTRUCTURE BY GC,GALVANIZED STEEL,
SLOPED TOPREVENT WATER
POOLING
CONNECTION TOSTRUCTURE BY GC,GALVANIZED STEEL,
SLOPED TOPREVENT WATER
POOLING
COLUMN
87.46°
3'-0"
GC TO RELOCATE EXISTING SOIL ATENTRANCE TO CREATE HILL
BP
PR
OJE
CT
NO
.: LA
08.0
162.
20
RE
AD
BO
ULE
VA
RD
AN
D L
AK
E F
OR
ES
T B
OU
LEV
AR
D
|
NE
W O
RLE
AN
S, L
A 7
0127
JOE
W. B
RO
WN
ME
MO
RIA
L P
AR
KE
NH
AN
CE
ME
NTS
- WE
ST
(D-C
DB
G)
Scale: 3/8"=1'-0"
NORTH & SOUTH ELEVATION1A2.05 - Scale: 3/8"=1'-0"
WEST ELEVATION2A2.05 - Scale: 3/8"=1'-0"
SECTION A3A2.05 - Scale: 3/8"=1'-0"
SECTION B4A2.05 -
Scale: 3/8"=1'-0"
PLAN7A2.05 -Scale: 3/8"=1'-0"
PRE-CAST CONCRETE PANEL5A2.05 - Scale: 1/4"=1'-0"
HILL @ ENTRANCE6A2.05 -
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 RENDERING - NEW PICNIC SHELTER - 6
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PICNIC SHELTER PLAN - 7
1 2 3 4 5 6
AB
14'-0" 14'-0" 14'-0" 14'-0" 14'-0"
32'-0
"4'-
0"4'-
0"
8"12
'-0"
3/204C
1/204C
4/204
C
2/204
C
20'-0" 8'-0" 42'-8"
STEEL COLUMN,PTD, TYP.
LINE OF ROOFABOVE
TA-13TA-10,TYP.TA-06
TA-05
TA-01,TYP.TA-09,TYP.
TA-08, TYPTA-02TA-02
TA-12 (ADA) TA-04
TA-02TA-02
TA-12 (ADA)TA-04
TA-13
TA-05TA-06
TA-01TA-09
1/A8001/A800
5'-0" 3'-2"
2'-0"
6'-0"
4'-8"
5'-1"
4'-8" 5'-0"3'-2"5'-8"
5'-8"
6'-0"
2'-0"
8'-8" 14'-0"
SF-03 SF-03 SF-03 SF-03 SF-03
SF-03SF-03SF-03SF-03SF-03
6/204
C
5/204
C
3'-0"
EQ EQ
3'-6 1
/2"3'-
0"
EQ EQ
FE-1 FE-1
SIM
CMU WALL TOCEILING
CMU WALL TOCEILING
FLOOD VENT
FLOOD VENT FLOOD VENT FLOOD VENT
FLOOD VENT
FLOOD VENT
SLASH PADSYSTEM VAULT
1 2 3 4 5 6
AB
14'-0" 14'-0" 14'-0" 14'-0" 14'-0"
32'-0
"4'-
0"
2'-0"
74'-0"
40'-0
"
3/204C
1/204C
4/204
C
2/204
C
STANDING SEAM METAL ROOF
Scale: 1/4"=1'-0"
PLAN- PICNIC SHELTER 21A2.02 -
BP
PR
OJE
CT
NO
.: LA
08.0
162.
20
RE
AD
BO
ULE
VA
RD
AN
D L
AK
E F
OR
ES
T B
OU
LEV
AR
D
|
NE
W O
RLE
AN
S, L
A 7
0127
JOE
W. B
RO
WN
ME
MO
RIA
L P
AR
KE
NH
AN
CE
ME
NTS
- WE
ST
(D-C
DB
G)
Scale: 1/4"=1'-0"
ROOF PLAN- PICNIC SHELTER 22A2.04A -
NOTES:1. ALL CONCRETE FLOOR SLABS TO BE SLOPED TO FLOOR DRAINS, SLOPE TO BE MIN 1
8" PER 1'-0".2. ALL INTERIOR PARTITIONS ARE 7-5/8" CMU TO A HEIGHT OF 8'-8" UNLESS OTHERWISE NOTED.SEE DRAWING 09/A6.01 FOR PARTITION DETAILS.3. SEE SHEET A0.02 AND DRAWING 2/A8.00 FOR TOILET ACCESSORY MOUNTING HEIGHTS.
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PICNIC SHELTER ELEVATIONS - 8
AB
STANDING SEAM METAL SOFFIT FASCIA
STEEL COLUMN, PT-7 TYP.
POLYCARBONATEPANEL TRANSOM
HM DOOR AND FRAME, PT-7
CMU, PT-1
SF-03, TYP
FLOOD VENT
6 5 4 3 2 1
STANDING SEAM METAL SOFFIT
STEEL COLUMN, PT-7 TYP.
POLYCARBONATEPANEL TRANSOM
CMU, PT-1 4" EDGE OFSIGNAGE
6'-0"
BOT
TOM
OF S
IGNA
GE
4" EDGE OFSIGNAGE
6'-0"
BOT
TOM
OF S
IGNA
GE
FIXED LOUVER19" X 16"
1 2 3 4 5 6
STANDING SEAM METAL ROOF
STEEL COLUMN, PT-7 TYP.
POLYCARBONATEPANEL TRANSOM
CMU, PT-1SF-03, TYP
6'-0"
1'-6"FLOOD VENT FLOOD VENT FLOOD VENT
BA
STANDING SEAM METAL SOFFIT FASCIA
STEEL COLUMN, PT-X TYP.
POLYCARBONATEPANEL TRANSOM
CMU, PT-1
SF-03, TYP
FLOOD VENT
HM DOOR AND FRAME, PT-7
CMU PT-1
HM DOOR AND FRAME, PT-7
CMU, PT-1
POLYCARBONATEPANEL TRANSOM
POLYCARBONATEPANEL TRANSOM
Scale: 1/4"=1'-0"
EAST ELEVATION- PICNIC SHELTER 22A2.04C A2.04A
BP
PR
OJE
CT
NO
.: LA
08.0
162.
20
RE
AD
BO
ULE
VA
RD
AN
D L
AK
E F
OR
ES
T B
OU
LEV
AR
D
|
NE
W O
RLE
AN
S, L
A 7
0127
JOE
W. B
RO
WN
ME
MO
RIA
L P
AR
KE
NH
AN
CE
ME
NTS
- WE
ST
(D-C
DB
G)
Scale: 1/4"=1'-0"
NORTH ELEVATION- PICNIC SHELTER 21A2.04C A2.04A
Scale: 1/4"=1'-0"
WEST ELEVATION- PICNIC SHELTER 24A2.04C A2.04AScale: 1/4"=1'-0"
SOUTH ELEVATION- PICNIC SHELTER 23A2.04C A2.04A
Scale: 1/4"=1'-0"
EAST ELEVATION6A2.04C A2.04AScale: 1/4"=1'-0"
WEST ELEVATION5A2.04C A2.04A
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 WAYFINDING - 9
23456789101112FDL141516171819
1C JOE W. BROWN MEMORIAL PARK
LIBRARY
ENTRANCE / EXIT
JBP BASEBALL FIELD
PICNIC SHELTER 1
PLAYGROUND WEST
PICNIC SHELTER 2
SPLASH PAD
GAZEBO
TENNIS COURTS
PICNIC SHELTER 3
SPARTAN FIELD
HURRICANE KATRINA, AUGUST 2005
VICTORY PLAZA
VICTORY TRACK
VICTORY FIELD
RECREATION CENTER
POOL
PLAYGROUND EAST
1B1A
AUDUBON NATURE CENTER
EAST NEW ORLEANS REGIONALBRANCH LIBRARY
VARI
ES4"
TYP
POWDER COATEDSTEEL MESH, 2" OPENINGS
2" POWDER COATEDSTEEL TUBES
SCHE
DULE
LINE
11'-8
"
2'-2"
BENT STAINLESS STEELPLATE, 16 GAUGE,
1" WIDTH
SLOPE CONCRETE BASEFROM CENTER TO EDGE
BENT STAINLESS STEELPLATE, 16 GAUGE,2 12 " WIDTH
CUT STAINLESS STEELLETTERS, SURFACEMOUNTED,SIGNAGE TYPE 5
POWDER COATED STEELPANEL, MECHANICALLYFASTENED,SIGNAGE TYPE 4
GRADE
FLOOD DATUMV.I.F.
PHOTOPOLYMERBONDED TO ACRYLIC
SIGNAGE, TYP,SIGNAGE TYPE 2
POWDER COATEDSTEEL MESH LID,
2" OPENINGS
6" SQUARE FORMED LEAVE-OUT FOR TUBES AND GROUT
BOLT
1'-4"
5'-0"
1'-0"
1'-0"
#5 @ 24" OC TYP
(5) #5 CONT. LAP, 36Db.#4 w/ STD HW @ 12" OC TYPCONSTRUCTION JOINT
KIOSK FOUNDATION
4"
3'-0"
2" POWDER COATEDSTEEL TUBE BRACING
2" POWDER COATEDSTEEL TUBE BRACING
EMBEDDED STEEL TUBES -PRIMED ONLY
1'-0"
2'-2"
3'-0"
2" POWDER COATEDSTEEL TUBES
BENT STAINLESSSTEEL PLATE
2'-2"
3'-0"
POWDER COATEDSTEEL MESH
2" OPENINGS
6" SQUARE FORMED LEAVE-OUT FOR TUBES AND GROUT
SLOPE CONCRETE BASEFROM CENTER TO EDGE
2" POWDER COATED STEELTUBE BRACING, TOP AND
BOTTOM OF FRAME
2" POWDER COATEDSTEEL TUBES
PHOTOPOLYMERBONDED TO ACRYLIC
SIGNAGE, TYP,SIGNAGE TYPE 2
BENT STAINLESSSTEEL PLATE
SLOPE CONCRETE BASEFROM CENTER TO EDGE
VARI
ES4"
TYP
12"-0
"
BENT STAINLESSSTEEL PLATE
CUT STAINLESS STEELLETTERS, SURFACEMOUNTED;SIGNAGE TYPE 5
POWDER COATEDSTAINLESS STEEL PANEL,MECHANICALLY FASTENED,SIGNAGE TYPE 4
POWDER COATEDSTEEL MESH
2" OPENINGS
CORE BASE FOR TUBES AND GROUT
GRADE
FLOOD DATUMV.I.F.
POWDER COATEDSTEEL MESH LID,
2" OPENINGS
VARI
ES
GRADE
FLOOD DATUMV.I.F.
STAINLESS STEEL MESH,HORIZONTAL BAR
FASTENERCLIP
ACRYLIC BASEADHESIVEACRYLIC PLAQUE
STAINLESS STEEL MESH,VERTICAL BAR
2"2"
2"
HURRICANE KATRINA, AUGUST 29th 2005
COUNTER SUNKMECHANICAL FASTENER,POWDER COATED TOMATCH PANEL
BP
PR
OJE
CT
NO
.: LA
08.0
162.
20
RE
AD
BO
ULE
VA
RD
AN
D L
AK
E F
OR
ES
T B
OU
LEV
AR
D
|
NE
W O
RLE
AN
S, L
A 7
0127
JOE
W. B
RO
WN
ME
MO
RIA
L P
AR
KE
NH
AN
CE
ME
NTS
- WE
ST
(D-C
DB
G)
Scale: 1"=1'-0"
WAYFINDING KIOSK - ELEVATION, TYP1A9.02B-
Scale: 1"=1'-0"
WAYFINDING KIOSK - PLAN, TYP2A9.02B- N.T.S.
WAYFINDING KIOSK - PERSPECTIVE, TYP.3A9.02B-
Scale: 1"=1'-0"
NOT USED4A9.02B-
N.T.S.
FLOOD DATUM LINE CONCEPT6A9.02B- N.T.S.
ACRYLIC SIGNAGE ATTACHMENT DETAIL7A9.02B-
Scale: 1"=1'-0"
FLOOD DATUM LINE PANEL, TYPE 45A9.02B-
1
1
1
1
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 PEDESTRIAN BRIDGE - 10
JOE BROWN PARK D-CDBG WEST SIDE ENHANCEMENTS - DESIGN ADVISORY COMMITTEE SUBMISSION - OCTOBER 2, 2013 SITE FURNITURE - 11