Jelsa Project
25.06.2009
Primary Crusher – 2.600 t/h feed from two sides
25.06.2009
Material flow from PPP to SPP – mostly direct feed
Secondary plant – Building Ensemble
Tertiary plant feed stock – Total 250.000 tons for 5 process days
Tertiary Screening + Crushing – Compact Design
Crusher Building
Screening Building – 2 parallel processing lines
Wet Sand – Free loading access from all sides
Dry Sand – Dust reduction through complete covering
Stock Area – 500.000 tons on 2 x 450m tunnels possible
Stacker – Flexible two arm stock feeding
Off-Shore stock – 150.000 tons for 4 vessels
Shiploader – High flexibility for short ship loading time