J TOMLINSON LIMITED Your Complete Building Solution
Company Profile
J TOMLINSON LIMITED Your Complete Building Solution
J Tomlinson is a £50 million business with 350 directly employed staff and operatives. Our services encompass every aspect of the construction life cycle.
J Tomlinson’s business is split into three main operating centres:
Construction One of our key business strengths is our public sector experience. J Tomlinson project teams have successfully completed projects for Education, Healthcare, Leisure, Commercial, Industrial and High Security clients, ranging from School extensions to Divisional Police Headquarters.
…INTRODUCTION
M&E Installations Maintenance
J TOMLINSON LIMITED Your Complete Building Solution
Unit 9 Newmarket CourtNewmarket DriveDerbyDE24 8NW
Unit 40 Thurnscoe Business CentrePrincess DriveThurnscoeRotherhamS63 0BL
Scimitar House, 100 Lilac Grove, Beeston, NottinghamNG91PF
…ORGANISATIONAL & STRUCTURE
21 Scholes LaneScholesCleckheatonBD19 6NS
…Offices …Management
Pat CassidyManaging Director
Dave YatesSenior
Estimator
Karl ReiterSenior Design
Engineer
Carl DerrickDirector M&E
Projects
Glen DowningSenior
Contracts Engineer
Gary DraperProject
Manager
Martin Gallagher
Construction Director
Support Services
Estimating, Surveying &
Buying
Adam DraperOperations Mgr
Construction Projects
Peter WoodsOperations Mgr
Construction Partnering
Project Operations
Peter JubbBusiness
Development DirectorProjects
Pat CassidyManaging Director
Dave YatesSenior
Estimator
Karl ReiterSenior Design
Engineer
Carl DerrickDirector M&E
Projects
Glen DowningSenior
Contracts Engineer
Gary DraperProject
Manager
Martin Gallagher
Construction Director
Support Services
Estimating, Surveying &
Buying
Adam DraperOperations Mgr
Construction Projects
Peter WoodsOperations Mgr
Construction Partnering
Project Operations
Business Development
J TOMLINSON LIMITED Your Complete Building Solution
No.58964
Gold Level, No. QE6639
No.F381500/HV004670
No. 68132
No. 003943000
No. 184592
Joint Industry Board for the ElectricalContracting Industry No. Y1329000
No.86274
No. 1543
No. C3541
ISO 9001 GB 16364
ISO 14001 GB 16365
…PROFESSIONAL MEMBERSHIP
J TOMLINSON LIMITED Your Complete Building Solution
Company Registration Number:3168455England & Wales
Full Company Name:J Tomlinson Limited
Year Established:Formation: 1950 Registration: 1996
Registered OfficeScimitar House, 100 Lilac Grove, Beeston, Nottingham NG9 1PF
Contact Names:Callum Stewart – Business Development ExecutiveJeremy Warman – Business Development Executive
Telephone:01159 574 390
Email Address:cstewart@jtomlinson.co.ukjwarman@jtomlinson.co.uk
Main Office Telephone:01159 574 300
Office Facsimile:01159 431 079
Office Email Address:enquiries@jtomlinson.co.uk
Company Web Site:http://www.jtomlinson.co.uk
…KEY COMPANY DETAILS
J TOMLINSON LIMITED Your Complete Building Solution
Statement of Turnover:2009 - £41m2008 - £40m2007 - £33m2006 - £26m
Bank Details: Yorkshire Bank plc 1st Floor Lock HouseCastle Meadow RoadNottinghamNG2 1AG
Insurance Details Employers Liability
Name of Insurer Allianz Cornhill
Policy No. 38/CS/11544424/04
Expiry Date 31/3/10
cover held £10M
Insurance Details Contractors all Risks
Name of Insurer Allianz Cornhill
Policy No. 38/CS/11544424/04
Expiry Date 31/3/10
cover held £10M
Insurance Details Professional Indemnity
Name of Insurer Hiscox Insurance
Policy No. HU P16 1300217
Expiry Date 31/3/10
cover held £10M
…FINANCIAL DETAILS
Insurance Details Public Liability
Name of Insurer Ace Europe/ QBE Insurance
Policy No. 46UKC08921/A7033326
Expiry Date 31/3/10
cover held £25M
J TOMLINSON LIMITED Your Complete Building Solution
At J Tomlinson Ltd we are proud of the fact we have never had any notices served.
J Tomlinson places the highest importance on health and safety as it believes that no company can truly be successful without ensuring good health and safety for its employees, clients and the general public.A positive approach to health, safety and quality and mitigation of risk is central to everything that J Tomlinson does and this permeates from the Directors and the Health, Quality & Environmental Manager right down to our site operatives.
Our current AIR is 133, which is well below industry average for the Construction Industry. However we recognise the need for improvement and are actively striving to reduce it even further.We have detailed below accidents to J Tomlinson employees and our subcontractors reportable under the statutory requirements of RIDDOR 1995.HSE Enforcement ActionNo enforcement action has been taken against J Tomlinson in the last 5 years.
…HEALTH & SAFETY
0
0
2
0
2009 2008 2007 2006 2005 2004
Fatal Accidents 0 0 0 0 0
Major Accidents 2 5 2 1 0
> 3 Days off Work 2 4 5 10 7
Dangerous Occurrences 0 0 0 1 1
0
0
0
0
2009 2008 2007 2006 2005 2004
Prosecutions 0 0 0 0 0
Prohibition Notices 0 0 0 0 0
Improvement Notices 0 0 0 0 0
Section 60 0 0 0 0 0
J TOMLINSON LIMITED Your Complete Building Solution
J Tomlinson is renowned for the highest standard of building and maintenance service within the UK construction industry. We operate a fully compliant system to standard BS EN ISO 9001: 2000, and have achieved full accreditation
The principal aims of the company are:
To have a real understanding of clients and their businessrequirements / objectives.To strengthen relationships and encourage repeat business with existing clients.To win work not solely on price but through innovation andby adding real value.To continually strive to improve our performance throughanalysis and continuous improvement of our processes.To develop staff potential through the provision ofappropriate training.To engender a positive commitment to quality and createan environment of teamwork, efficiency and co-operation.To support staff in their day-to-day work by developing anintegrated management system that links all businessactivities within the organisation and is documented tomeet the requirements of BS EN ISO 9001:2000.
…QUALITY ASSURANCE
BEST PRACTICE / QUALITY MANAGEMENT
SYSTEM(BS EN ISO 9001:2000)
BEST PRACTICE / QUALITY MANAGEMENT
SYSTEM(BS EN ISO 9001:2000)
PRODUCE UNIQUE PROJECT QUALITY
PLANS / SET QUALITY
CHALLENGE
PRODUCE UNIQUE PROJECT QUALITY
PLANS / SET QUALITY
CHALLENGE
PROVIDE HIGH CALIBRE PROJECT
TEAMS / DEDICATED QA MANAGER
PROVIDE HIGH CALIBRE PROJECT
TEAMS / DEDICATED QA MANAGER
UNDERTAKE SYSTEMATIC CHECKS AND
AUDITS
UNDERTAKE SYSTEMATIC CHECKS AND
AUDITS
PROVIDE SAMPLE AREAS OF WORKS / SAMPLE BOARDS
PROVIDE SAMPLE AREAS OF WORKS / SAMPLE BOARDS
PROTECT COMPLETED WORKS / MONITOR EXISTING
RETAINED FEATURES
PROTECT COMPLETED WORKS / MONITOR EXISTING
RETAINED FEATURES
IMPLEMENTZERO DEFECTS METHODOLOGY
EARLY INTRODUCTION OF OUR CUSTOMER
CARE TEAM
IMPLEMENTZERO DEFECTS METHODOLOGY
EARLY INTRODUCTION OF OUR CUSTOMER
CARE TEAMUSE ONLY APPROVED
SUBCONTRACTORS (QUALITY NOT LOWEST
PRICE)
USE ONLY APPROVED
SUBCONTRACTORS (QUALITY NOT LOWEST
PRICE)
USE ONLY APPROVED MATERIALS
(QUALITY NOT LOWEST PRICE)
USE ONLY APPROVED MATERIALS
(QUALITY NOT LOWEST PRICE)
APPROACH TOQUALITY
ASSURANCE
J TOMLINSON LIMITED Your Complete Building Solution
J Tomlinson is proud of its environmental standards. We operate a fully compliant system to standard BS EN ISO 14001:2004, and have achieved full accreditation. We are proud of our environmental record, having NEVER received any improvement or prohibition notices.
By adopting a pro-active approach to environmental safety on site, we have achieved and continue to maintain a zero improvement and prohibition notice record.
J Tomlinson follow the Constructing Excellence Toolkit which covers:- Corporate Social Responsibility- Economic Sustainability- Social Sustainability- Environmental Sustainability
J Tomlinson personnel have completed numerous BREEAM ‘Excellent’ rated projects.
… SUSTAINABILITY
USE OF KPI’SSet Environmental KPI’s
Implement Environmental PlansUndertake Waste Audits
RECYCLESegregate Waste
Identify Waste Streams Early
RENEWAL ENERGYEmploy the most efficient technology to hit the KPI
Targets
REDUCE / RESTRICT CONSUMPTION
Set Targets < CO2 EmissionsWater Usage
Transport Movements
EFFICIENT MANAGEMENT
Materials Ordering / StorageGood Housekeeping
Employ a Project ChampionTraining
Learning ExperienceProvide viewing facilities
Demonstration rooms
PROCUREMENTUse Managed & Approved
Material SourcesFollow Codes of Practice
MATERIALSIncrease the use of
Sustainable Materials / Technology / Prefab Items
ACHIEVING SUSTAINABILITYOUR APPROACH
J TOMLINSON LIMITED Your Complete Building Solution
KEY SECTORS
Education
Health Care
High Security
Commercial
Industrial
Social Housing
Leisure
… PREVIOUS EXPERIENCE
KEY CLIENTS
J TOMLINSON LIMITED Your Complete Building Solution
Client:East Midlands Property Alliance
Value:£400m
Duration:4 years
Contract:NEC
J. TOMLINSON LTD
EMPA CONSTRUCTION PARTNERING FRAMEWORK
Key features/AchievementsNew build ECO Homes.Design & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.
This framework is available for use by any East Midlands public sector organisation.The projects covered by the frameworks are for contracting work and include new build, extensions and refurbishment projects.
The framework will run for 4 years. All projects are based on the NEC family of contracts.
J TOMLINSON LIMITED Your Complete Building Solution
Client:Quantum Consortium
Value:£100.0m
Duration:4 years
Contract:PPC 2000 (2003 amended)
J. TOMLINSON LTD
J. TOMLINSON LTD
QUANTUM CONSORTIUM HOUSING FRAMEWORK
Key features/AchievementsNew build ECO Homes.Design & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.
J Tomlinson are delighted to be a member of the £100 million Quantum Consortium housing framework. Development partner status currently comprising of Derwent Living, East Midlands Housing Association and Futures Housing Group. The consortium currently operates in the East and West Midlands ranging from Sheffield to Milton Keynes.
J TOMLINSON LIMITED Your Complete Building Solution
Client:Alliance Boots Plc
Value:£2m
Duration:4 years
Contract:PPC 2000
J. TOMLINSON LTD
J. TOMLINSON LTD
BOOTS CONSTRUCTION PARTNERSHIP
Key features/AchievementsDesign & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.Live sterile production & office environment
Building and civil engineering maintenance and small projects Framework Agreement. Projects include the Structural Alterations to grade 2 listed D10 Building.
J TOMLINSON LIMITED Your Complete Building Solution
Client:Rotherham Construction Partnership
Value:£4.0m
Duration:4 years
Contract:PPC 2000
J. TOMLINSON LTD
J. TOMLINSON LTD
ROTHERHAM CONSTRUCTION PARTNERSHIP
Key features/AchievementsDesign & Build Projects.Logistically Complex Sites.Value Engineering / Whole Life Costing.
J Tomlinson are proud to have be one of ten contractors selected for the Rotherham Construction Partnership for the provision of Building works and mechanical and electrical installation works for public buildings.
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesSustainable construction (e.g. solar panels)New build, alterations and refurbishmentLong working relationship with client
New offices, involving new build, structural alteration and refurbishment, for East Midlands Housing increasing their Coalville based operations.
Client:
East Midlands Housing
Value:
£1.2 million
Duration:
26 weeks
Contract:
JCT 2005 Standard Without Quantities
Contract Administrator:
rg+p
EAST MIDLANDS HOUSING OFFICES
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesGrade 1 Listed BuildingClose liaison with English HeritageConservation workUse of traditional construction materials and techniques
Refurbishment and renovation of 60 ornate roof lights and roof structure on a Grade 1 Listed building.
Client:
Welbeck Estates
Value:
£500k
Duration:
26 weeks
Contract:
JCT 2005 Standard Without Quantities
Contract Administrator:
Church Lukas
WELKBECK ESTATE ROOFLIGHTING, WORKSOP
J TOMLINSON LIMITED Your Complete Building Solution
As part of our clients strategic property plan we successfully completed the construction of a new Extra Care Facility and full refurbishment of Listed Buildings whilst retailing the clients use of the remainder of the complex.
Client:
The Retail Trust
Value:
£10.0 m
Duration:
65 weeks
Contract:
JCT 2005 with Contractors Design
Architect:
Howard Fairbairn & Partners
Structural Engineer:
Howard Cavanna
Key FeaturesNew Build Nursing HomeMajor refurbishment & extension to grade 2 listed buildings Restricted site (Logistically complex)Phased workingPiled foundations / basement constructionSensitive siteExacting finishes
LEYLAND’S ESTATE, EXTRA CARE COMPLEX, DERBY
J TOMLINSON LIMITED Your Complete Building Solution
LEYLAND’S ESTATE, EXTRA CARE COMPLEX, DERBY
J TOMLINSON LIMITED Your Complete Building Solution
The construction of a new therapy centre with soft play room, multi sensory room, hydrotherapy pool, dual-purpose surround-sound cinema and training room. Their will also be a new young people’s wing with six extra children’s bedrooms, The existing 10 room’s will undergo full refurbishment .
Client: Rainbows Children’s Hospice
Value: £4.0m
Duration: 50 weeks
Completion: December 2009
Contract: JCT 2005 Design & Build
Architect: B3 Architects
Structural Engineer: Diamond Wood Partnership
Key Features:Specialist acoustic considerationsHighly serviced buildingHydrotherapy PoolPhased working to minimums DisruptionHighly Sensitive Operational Environment
J. TOMLINSON LTD
J. TOMLINSON LTD
RAINBOWS CHILDREN’S HOSPICE EXTENSION, LOUGHBOROUGH
J TOMLINSON LIMITED Your Complete Building Solution
Major refurbishment comprising all external envelope elements – re-roof, ornate lead work, brickwork repairs cleaning and re-pointing, replacement windows and insulated render system, and renewal of mechanical and electrical systems.
Client:University of Derby
Value:£1.7m
Duration:26 weeks
Completion:December 2008
Contract:JCT 2005 Design & Build
Architect:Tombs Associates
Structural Engineer:
Collis Hall & Greeny
Key Features:
Maintain IT suite during worksWork in occupied buildingExtensive structural alterationsIntricate phased workingRe-roofing including movable roof systemKey architectural featuresContractors Design
BRITANNIA MILL, UNIVERSITY OF DERBY
J TOMLINSON LIMITED Your Complete Building Solution
BRITANNIA MILL, UNIVERSITY OF DERBY
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesSensitive ecological siteLive University campusUse of reclaimed materialsMatching new to existing construction
Refurbishment of a single dwelling hunters lodge into multi-occupancy self contained units for University lecturers and demolition, reclamation and new build construction of bungalow.
The works involved the reclaiming of materials from the old stable block to be used on the bungalow.
Client:
University of Nottingham
Value:
£800k
Duration:
26 weeks
Contract:
JCT 2005 Minor Works
Contract Administrator:
King Sturge
EVITON HOUSE, SUTTON BONNINGTON
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesTight schedule working during Summer holidaysHistoric Listed Building WorkP.I.R. LightingPrefabricated Material Office Site Construction
Refurbishment of 20 dormitories with the Elfin all in one self contained cooker, microwave, sink and fridge kitchen unit. Bathroom’s were also fully refurbished to provided a completely revitalised and vibrant living environment.
Client:
Trent College
Value:
£100k
Duration:
6 weeks
Contract:
JCT 2005 Minor Works
TRENT COLLEGE REFURBISHMENTS
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesAlterations to live control roomsNew air conditioning24 Hour Working to suit Clients specific needsDDA worksSecurity alterations
Alterations to live 24 hour Emergency Response Call Centre to include minor demolition and alterations, electrical and mechanical improvements and installation of air conditioning units.
Client:
Nottinghamshire Police
Value:
£200k
Duration:
9 weeks
Contract:
JCT Minor Works
Contract Administrator:
Focus Consultants (UK) Ltd
SHERWOOD LODGE CONTROL ROOM & MANSFIELD POLICE STATION ALTERATIONS
High Security - Photography Prohibited
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesIntensive liaison with statutory undertakersHigh securityEffectively MOD siteOut of hours working24 hour shiftsPlanned and co-ordinated detailed and precise sequencing
Replacement of HV switchgear to multi million pound nuclear facility to include civils, structural alterations, fire upgrade works, and major electrical improvements.
Client:
Rolls Royce
Value:
£1m
Duration:
12 weeks
Contract:
JCT Intermediate with Contractors Design
Contract Administrator
Cundall
ROLLS ROYCE HV SWITCH GEAR UPGRADE, DERBY
High Security - Photography Prohibited
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesLive site with vulnerable peopleContaminated sitePhased work to minimise disruption to building usersRestricted M&E break in timesOut of hours workingStringent dust control
New build, refurbishment and large extension to educational facilities to provide foundation care units. Works included glulam timber frame construction, cedar cladding, standing seem zinc, proprietary coloured render systems, feature architectural glazing, environmental lead services.
Client:
Nottingham City Council
Value:
£2.0m
Duration:
26 weeks
Contract:
JCT 2005 Local Authority Edition
Architect
Alan Joyce Architects
Structural Engineer
City Consultants
DUNKIRK & MELLORS PRE-SCHOOL UNITS, NOTTINGHAM
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesIntensive liaison with statutory undertakersHigh securityEffectively MOD siteOut of hours working24 hour shiftsPlanned and co-ordinated detailed and precise sequencing
Complete internal and external refurbishment of existing cadet centre, which will including new roof coverings new electrical and mechanical services, new windows and doors and minor demolition.
Client:
East Midlands Reserve Forces
Value:
£500K
Duration:
22weeks
Contract:
JCT Intermediate with Contractors Design
Architect:
Alan Joyce Architects
Structural Engineer:
City Consultants
CADET TRAINING CENTRE, MELTON MOWBRAY
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesTimber FrameDDA Compliant (Lift)P.I.R. LightingPrefabricated Material Office Site Construction
Construction of a new Bowling Pavilion facility. The new club house incorporates changing, catering and meeting rooms. Fully DDA compliant with the installation of lifts and ramps.
Client:
Gedling Borough Council
Value:
£200K
Duration:
18 weeks
Contract:
JCT Intermediate with Contractors Design
Architect:
Alan Joyce Architects
Structural Engineer:
City Consultants
ARNOT BOWLS PAVILION, NOTTINGHAM
J TOMLINSON LIMITED Your Complete Building Solution
Client:Trent & Dove Housing
Value:£12.0m
Duration:5 years
Contract:PPC 2000
New kitchens, bathrooms, replacement central heating and disabled adaptations over 5 year partnering contract.
J. TOMLINSON LTD
J. TOMLINSON LTD
TRENT & DOVE HOUSING MAINTENANCE FRAMEWORK, BURTON UPON TRENT & UTTOXETER
Key features/AchievementsOriginal programme of 450 kitchens and bathrooms per annum1000th kitchen and 600 bathrooms installed after only 15 monthsExcellent levels of customer satisfaction (latest survey – 100%)7 day installation periods (target was for 10 days)Good site according to Considerate Constructions Auditor
J TOMLINSON LIMITED Your Complete Building Solution
Alterations and extensions to existing catering facilities at the East Midlands Conference Centre doubling the size of the facilities.
This will allow the University to provide a full catering service for up to 500 people.
Client:
University of Nottingham
Value:
£500k
Duration:
22 weeks
Contract:
JCT 2005 Intermediate
Architect:
Cox Freeman
Structural Engineer:
SLS Design Consultants
Key FeaturesTight site constraintsWorking in fully operational building & campusStaged handoverComplicated phasing to suit client’s requirements
EAST MIDLANDS CONFERENCE CENTRE
J TOMLINSON LIMITED Your Complete Building Solution
Client:Melton Borough Council
Value:£1.0m
Duration:4 years
Contract:JCT Minor Works
Housing maintenance including bathroom & kitchen strip out and complete refitting as part of a 4 year Partnering Framework Agreement.
J. TOMLINSON LTD
MELTON BOROUGH COUNCIL HOUSING MAINTENANCE FRAMEWORK
Key features/Achievements
Work in occupied propertiesExcellent customer satisfactionResident liaison officerHigh rise work
J TOMLINSON LIMITED Your Complete Building Solution
The new building will provide additional space for the increased delivery of courses by the Human Performance Department. The current Human Performance Centre offers state-of-the-art facilities for the delivery of a range of sports courses and subjects including Sport and Exercise Physiology, Sports Biomechanics, Sports Psychology, Coach Education and Sports Nutrition.
Client:
University of Lincoln
Value:
£1.9m
Duration:
36 weeks
Contract:
JCT 2005 Intermediate
Architect:
Stem Architects
Structural Engineer:
Peter Cole Consulting
Key FeaturesTight site constraintsBREEAM RatedWorking in fully operational leisure facilityStaged handoverComplicated phasing to suit client’s requirements
HUMAN PERFORMANCE CENTRE, LINCOLN
J TOMLINSON LIMITED Your Complete Building Solution
HUMAN PERFORMANCE CENTRE, LINCOLN
J TOMLINSON LIMITED Your Complete Building Solution
Conversion of halls of residence to 117 Houses of Multiple Occupancy including the total refurbishment including remodelling of kitchens and bathrooms, electrical rewiring, central heating installation and roofing works and site wide service infrastructure upgrading.
Client:Morris Properties Ltd
Value:
£4.8m
Duration:
26 weeks
Completion:
April 2008
Contract:
JCT 2005 Intermediate
Architect:
Michael Dyson Associates
Key Features:117 Individual Houses of Multiple OccupancyHMO Regulation compliantSite wide infrastructure upgradeOverall completion in 26 weeksIn-house M&E servicesHigh security
J. TOMLINSON LTD
J. TOMLINSON LTD
NORFOLK PARK STUDENT ACCOMMODATION, UNIVERSITY OF SHEFFIELD
J TOMLINSON LIMITED Your Complete Building Solution
NORFOLK PARK STUDENT ACCOMMODATION, UNIVERSITY OF SHEFFIELD
J TOMLINSON LIMITED Your Complete Building Solution
J Tomlinson Ltd successfully completed this state of the art facility for the East Midlands Ambulance Service as part of their strategic plan to provide an up to date service to the public using modern technology – The fit out was completed in sections to allow the client direct specialist installations.
Client:
EMAS NHS Trust
Value:
£3m
Duration:
52 weeks
Contract:
IFC 2005
Architect
Stephen George & Ptnrs
Structural Engineer
BWB Consulting
Key Features:Construction of server room Concurrent with Clients Direct ContractorsSpecialist acoustic considerationsPhased workingHighly serviced buildingExacting finishesAntistatic surfacesStandby generator & UPS systemsDDA compliantMajor civils works
J. TOMLINSON LTD
J. TOMLINSON LTD
EAST MIDLANDS AMBULANCE SERVICE, CONTROL CENTRE
J TOMLINSON LIMITED Your Complete Building Solution
EAST MIDLANDS AMBULANCE SERVICE CONTROL CENTRE, NOTTINGHAM
From: Lee Merrin [******@mspm.co.uk] Sent: 05 December 2008 15:39To: ADraperSubject: EMAS HQ
Dear AdamIt gives me great satisfaction to enclose the Completion Certificate and Hand Over Snagging Report (which is very minimal indeed).We all know how rare it is for projects to follow their planned timescales and so I must congratulate you, the J Tomlinson team and all of the other key team members with this success.Have a good weekend - I will no doubt speak to you next week.Kind Regards
Lee MerrinDirectorMSPM Ltd
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesHigh specification officesIn-house M&E installationOnsite anaerobic digesterRe-use of existing steel frame
Construction of new Headquarter Offices for John Bowler Eggs, one of the UKs largest egg producers.
Client:
John Bowler Group
Value:
£850k
Duration:
22 weeks
Contract:
JCT 2005 with contractors design
Contract Administrator:
Church Lukas
BOWLER EGG HEADQUARTERS, HILTON
J TOMLINSON LIMITED Your Complete Building Solution
BOWLER EGG HEADQUARTERS, HILTON
J TOMLINSON LIMITED Your Complete Building Solution
Key FeaturesMultiple sitesExacting finishesFast-track construction methods24 hour working to minimise construction period
Refurbishment of head office Training Facility and hair salons in Long Eaton, Ashbourne and Leicester.
Client:
Keith Hall
Value:
£300k
Duration:
6 weeks
Contract:
JCT Minor Works
KEITH HALL TRAINING CENTRE
J TOMLINSON LIMITED Your Complete Building Solution
Alterations and refurbishment of a dilapidated northern light factory unit into multi-use learning and media centre for use by South Leicester College, Muslim Asian TV Network and Central News.
Client: South Leicestershire College
Value: £1.3m
Duration: 24 weeks
Completion: April 2008
Contract: JCT Intermediate with Contractors Design
Architect: Metz Architects
Structural Engineer: Diamond Wood Partnership
Key Features:Specialist acoustic considerationsM&E Contractors DesignHighly serviced buildingExacting finishesDemolition and Asbestos DecontaminationConcurrent with Clients Direct special Audio Visual Contractors
J. TOMLINSON LTD
J. TOMLINSON LTD
ROSS WALK MEDIA INNOVATION CENTRE, LEICESTER
J TOMLINSON LIMITED Your Complete Building Solution
Tried , Tested &Tried , Tested &Regional Project Regional Project
TeamsTeams
Construction Construction SpecialistsSpecialists
Established Established Regional & Supply Regional & Supply
ChainChain
Established Established Regional OfficeRegional Office
FinancialFinancialStrengthStrength
Commitment & Commitment & EnthusiasmEnthusiasm
Able to Provide Able to Provide Innovative & Viable Innovative & Viable
SolutionsSolutions
Design & Build Design & Build SpecialistsSpecialists
OUR STRENGTHS
Trust, Honesty Trust, Honesty & Loyalty& Loyalty
The Clients NeedsThe Clients Needs
The EnvironmentThe Environment
Employees & Employees & SuppliersSuppliers
Hard Work & Hard Work & DedicationDedication
Commitment & Commitment & EnthusiasmEnthusiasm
Innovative Innovative & Continuous & Continuous ImprovementImprovement
Safe Working Safe Working EnvironmentEnvironment
OUR VALUES
…WHY CHOOSE J TOMLINSON
J TOMLINSON LIMITED Your Complete Building Solution
Scimitar House100 Lilac Grove
BeestonNottingham
NG9 1PFtel: 0115 9574300fax: 0115 9431079
e-mail: marketing@jtomlinson.co.uk