Iran-EU Project Presentation- Investment, Joint Venture, Cooperation

Post on 16-Apr-2017

399 views 4 download

Transcript of Iran-EU Project Presentation- Investment, Joint Venture, Cooperation

EU-Iran ProjectsPresentation

1

Introduction to EILB

• The European Institute for Law and Business (EILB) is an institution affiliated to The Hague Center for Law and Arbitration (HCLA) dedicated to providing services in diverse fields of international business.

• Our Strength:o Locationo Knowledge to Market:

o Knowledge of Iran and EU and their markets as well as the contacts established with licensors, technology owners and industry associations and institutions

2

EILB Services • Project Management Consultancy

• PMBOK (ANSI/PMI 99-001-2008)

• Integration management

• Scope management

• Time management

• Cost management

• Resource management

• Quality management

• Communication management

• Risk management

3

Pre-Order & Post-Order Services

• Solicitiation & purchasing• Commercial services• Expediting• Inspection• Logistic coordination

4

Oil & GasEnergy

Projects

5

South Azadegan Oil Field Development

• Location: Khuzestan Province• Client/Owner: Petroleum

Engineering and Development Company

• Contractor: Jahan pars Group • Estimated budget: 700 MEURO• Duration: 18 Months• Description: Engineering Design,

Procurement, Construction, Installation, Commissioning and Finance of Central Treatment and Export plant (CTEP)

6

Olefin petrochemical

complex• Location: Chahbahar Free-zone• Client/Owner: Sina chemical

industrial development• Estimated budget: 1400 MEURO• Duration: 48 Months• Description: EPC and investment

for the following plants o Gas to Methanolo Methanol to Olefino Olefin to polyolefin (type/grade of PO will be

selected when the conceptual studies be finalized by the consultant)

7

Dehgolan -Miandoab 56 inch

Pipeline• Location: North West Iran• Client/Owner: Iranian Gas

engineering development• Contractor: Jahan Pars Group• Estimated budget: 483 MEURO• Duration: 36 Months• Description: Engineering Design,

Procurement, Construction, Installation , Commissioning and financing of 230 Km length 56 inches Gas Pipeline

8

Sahar Oil Refinery• Location: Qeshm Island• Client/Owner: Sohar Oil Refinery• Estimated budget: 240 MEURO• Duration: 48 Months• Description: EPC for 40,000 BBD

heavy crude oil refinery in Qeshmisland free zone• Products: Gasoline, Gasoil,

Bitumen, Fuel Oil, and LPG

9

Linear Alkyl Benzene Plant

• Location: KoshkuiyehPetrochemical Complex, Kerman province, Centre Iran• Client/Owner: Kerman Pet. Co.• Estimated budget: 600 MEURO• Duration: 48 Months• Description: EPC for LAB plant

with capacity of 150,000 MT/year

10

Jask Crude Oil Tank Terminal

• Location: Jask, Hormozgan Iran• Owner: Atyieh Damavand

Investment Group • Project cost: 263 MEURO• Description: 10 Million barrel fixed

and floating roof tank farm in Hormozgan province

11

Gas Engine Power Plant

• Location: Rasht, Gillan, North Iran• Client/Owner: Ghadir Investment

Co.• Estimated budget: 10 MEURO• Duration: 12 Months• Description: EPC and investment

for 25 MW Gas engine power plant (DG)

12

Gas engine power plant

• Location: Kerman, Iran• Client/Owner: Mahtab Gostar Karmania Company• Estimated budget: 14 MEURO (25 MW)• Duration: 12 Months • Description: EPC and investment for 4X 25 MW Gas engine power

plant (DG) in centre of Iran

13

Jalal Combined Cycle Power Plant

• Location: Tehran, Iran• Client/Owner: Tamin Energy

Development Co.• Estimated budget: 255 MEURO• Duration: 36 Months• Description: Investment in

construction of a 500 MW combined cycle power plant in the field of large scale thermal power plants

14

Wind Power Plant• Location: Nehbandan, Khorasan,

East Iran• Client/Owner: Tamin Energy

Development Co.• Estimated budget: 73 MEURO• Description: Investment in

construction of a 50 MW wind power plant

15

Photovoltaic Power plant

• Location: Kerman province, Centre Iran• Client/Owner: Kerman Chamber of

Commerce• Estimated budget: 1.8 MEURO• Duration: 12 Months• Description: Investment on EPC for

1.2 MW, Photovoltaic power plant in Centre of Iran

16

Water Management&

Civil WorksProjects

17

Water Conveyance from Persian Gulf to

Yazd Province• Location: Yazd, Keman and Hormozgan provinces• Client/Owner: Yazd province water distribution co.• Contractor: Jahan Pars Group• Estimated budget: 1756 MEURO• Duration: 48 Months

• Description: Transporting of 250 million cu. m/yearof water from Persian Gulf to Yazd, construction ofwater desalination unit with capacity of 250 million cu.m /year (Reverse Osmosis Technology)

o Pipeline Length: App.700 Km.o Line Diameter : 2,200 mmo Pipe Material : Steel

18

National Water company projects

No. Description Estimated cost MEURO Investment type

1 EPC and operation of Wastewater treatment plant (70 villages) 123 BOT

2 EPC for Disalination unit in Fars province (3 projects) 73 BOO

3 EPC for Disalination unit in Southern provinces (3 million m3 in two phases) 1756 BOO

4 EPC watre transmission and supply including pumping stations 35 BOT

5 Implementation of NRW projects (35 projects) 175 BOT/ROT

6 Sludge management and construction ofWWTP in large cities 179 BOT

7 Completion of wastewater systems against allocation of effluents in the frame (17 projects) 675 Buyback

8 Construction of small scale treatment plants in the administration buildings of the Ministry of Energy (100 units) 159 Purchase

19

Water Transmission to Gorgan

• Location: Golestan Province, North Iran• Client/Owner: Golestan water

organization• Estimated budget: 35 MEURO

(BOT)• Description: 40 KM water pipeline

to Gorgan including 3 pump stations, desalination unit and tanks

20

Water Transmission project

• Location: Golestan Province, North Iran• Client/Owner: Golestan water

organization• Estimated budget: 75 MEURO

(BOT)• Description: Water transmission to

3 different cities in North of Iran

21

Bandar Abbas-Kerman Free way

• Location: Bandar Abbas to Kerman• Client/Owner: Kerman Alavi

development group• Estimated budget: 900 MEURO• Duration: 48 Months• Description: 356 Km freeway from

south to centre of Iran

22

Agricultural Projects

23

Greenhouse project

• Location: Khuzestan province, South Iran

• Client/Owner: Saba Gol Khuzestan Co.

• Estimated budget: 12 MEURO• Duration: 12 Months• Description: EPC and operation of 10

Hectare modern Greenhouse in Khuzestan province

oProducts: o Decorative flowerso Vegetables

24

Greenhouse Project

• Location: Karaj, North/Centre Iran• Client/Owner: Soil and Water

Company• Estimated budget: 150 MEURO• Duration: 48 Months• Description: EPC and operation of

100 Hectare modern greenhouse in Karaj area, nearby Payam airport in different phases

oProducts: o Decorative Flowerso Tomato, Cucumber and Strawberry