Interoperability at INM Experience with the SREPS system

Post on 15-Jan-2016

32 views 0 download

Tags:

description

Interoperability at INM Experience with the SREPS system. J. A. García-Moya NWP – Spanish Met Service INM SRNWP Interoperability Workshop ECMWF – 14-15 January 2008. Ensemble for Short Range. Surface parameters are the most important ones for weather forecast. - PowerPoint PPT Presentation

Transcript of Interoperability at INM Experience with the SREPS system

Interoperability at INMExperience with the SREPS

system

J. A. García-MoyaNWP – Spanish Met Service INM

SRNWP Interoperability WorkshopECMWF – 14-15 January 2008

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

2

Ensemble for Short RangeSurface parameters are the most important ones for weather forecast.Forecast of extreme events (convective precip, gales,…) is probabilistic.

Short Range Ensembles can help to forecast these events.Forecast risk (Palmer, ECMWF Seminar 2002) is the goal for both Medium- and, also, Short-Range Prediction.

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

3

Errors of the short-range forecast

Due to model formulation.Due to simplifications in parameterisation schemes.Due to uncertainty in the initial state.

Special for LAMs, due to errors in lateral boundary conditions.Due to uncertainties in soil fields (soil temperature and soil water content, …).

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

4

SREPS I

Multi-model approach (Hou & Kalnay 2001).Stochastic physics (Buizza et al. 1999).

Multi-boundaries:From few global deterministic models.From global model EPS (ECMWF).SLAF technique (Hou & Kalnay 2001).

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

5

Multi-model

Hirlam (http://hirlam.org).

HRM from DWD (German Weather Service).

MM5 (http://box.mmm.ucar.edu/mm5/).

UM from UKMO (Great Britain Weather Service).

LM (COSMO Model) from COSMO consortium (http://www.cosmo-model.org).

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

6

Multi-Boundaries

From different global deterministic models:ECMWFUM from UKMO (UK Weather Service)

GFS from NCEPGME from DWD (German Weather Service)

CMC (Canadian Met Centre, ongoing work)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

7

SREPS at INM

Mummub: Multi-model Multi-boundaries72 hours forecast two times a day (00 & 12 UTC).Characteristics:

5 models.4 boundary conditions.2 latest ensembles (HH & HH-12).

20 member ensemble every 12 hoursTime-lagged Super-Ensemble of 40 members every 12 hours.

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

8

All models X bcs

Whole Area

Zoom over Spain

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

9

Multi-boundariesWhat can we get from using multi-boundaries from deterministic high resolution global models?

Full advantage of Variational Data Assimilation Schemes in global modelsThe best possible data for boundary conditionsMore spread for the short-range than using one single-model EPS

What can we loose using data from different operational centres?

Daily transmission of very large amount of data (full resolution global model fields).Dependence of different priorities at the different operational centres.

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

10

What do we need?

Operational priority at the centres.DWD versus UKMO

Development and maintenance of the interoperability software.Human resources for monitoring.Clear European Policy of commercial rights for using operational NWP data from other centres

Improved exchange of NWP data among Met Services in Europe

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

11

Single BC’s Ensembles ( 4 members each)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

12

Single model Ensembles (4 members each)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

13

SLAF (Scaled Lagged Average Forecast)

Integration area 194x181x40.17.5 N – 62.5 N / 28.25 W – 20.0 E.0.25º lat x lon horizontal resolution.ECMWF forecast as boundary files.Forecast up to 48 hours every 6 hours.Test Period of 20 days: 2002120200-2002122418

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

14

SLAFSLAF (AN K • ( AN - FCHH ), 0 k 1)

Four different Ensembles with 9 members each.EXP Initial Files Boundaries

SLAF1 Errors H+06 No perturb.SLAF2 Errors H+48 No perturb.SLAF3 No perturb. Errors H+48SLAF4 Errors H+48 Errors H+48SLAF5 Errors H+24 Errors H+24

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

15

Errors H+06

SLAF (AN K • ( AN - FCHH ), 0 k 1)Experiments:

Control SFCAN = AN00SF1 and SF2 AN = AN00 1 • (AN00-FC06)SF3 and SF4 AN = AN00 3/4 • (AN00-FC12)SF5 and SF6 AN = AN00 1/2 • (AN00-FC18)SF7 and SF8 AN = AN00 1/4 • (AN00-FC24)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

16

Errors H+24

SLAF (AN K • ( AN - FCHH ), k=cte. )Experiments:

Control SFCAN = AN00S11 and S12 AN = AN00 1.5 • (AN00-FC12)S13 and S14 AN = AN00 1 • (AN00-FC24)S15 and S16 AN = AN00 0.75 • (AN00-FC36)S17 and S18 AN = AN00 0.50 • (AN00-FC48)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

17

Errors H+48

SLAF (AN K • ( AN - FCHH ), k=cte. )Experiments:

Control SFCAN = AN00S11 and S12 AN = AN00 2.5 • (AN00-FC12)S13 and S14 AN = AN00 2 • (AN00-FC24)S15 and S16 AN = AN00 1.5 • (AN00-FC36)S17 and S18 AN = AN00 1 • (AN00-FC48)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

18

Spread: BC’s vs. IC’s

SLAF2 – Pert IC

SLAF3 – Pert BC

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

19

Spread (cont.)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

20

MM5 Multi-physics (5 members)

Same initial and boundary fields.Different parameterizations schemes

Convection (Grell, Kain-Fritsch, Betts-Miller)Boundary layer (MRF, ETA).Shallow convection “on” and “off”.

Two months of parallel test (20060101 – 20060228)

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

21

MSLP H+48

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

22

Cooperation in EuropeINM ARPA SIM DWD

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

23

COSMO-SREPS (Short-Range Ensemble Prediction System) short range (up to 3 days)

16 LM runs at 10 km

LM at 25 km on IFS

IFS – ECMWF globalb

y I

NM

Sp

ain LM at 25 km on GME

GME – DWD global

LM at 25 km on UM

UM – UKMO global

LM at 25 km on NCEP

AVN – NCEP global

P1: conv. scheme (KF)

P2: turb. parameter 1

P3: time filter

P4: turb. parameter 2

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

24

ARPA SIM DWD

UNCERTAINTY INTRODUCED BY LATERAL BOUNDARIES(Ensemble ‘LBC’) transfer of uncertainty across scales in an 'ensemble chain' COSMO-DE is nested into the COSMO-SREPS (16 members, ARPA-SIM, Bologna) COSMO-SREPS uses a COSMO model version with 10km grid spacing and perturbed physics COSMO-SREPS is nested into the INM ensemble (INM, Spain) 16 members in total

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

25

Verification

Verification exercise, April-June 2006:

Calibration: with synoptic variables Z500, T500, PmslResponse to binary events: reliability and resolution of surface variables 10m surface wind, 6h and 24h accumulated precipitation

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

26

Pmsl- ECMWF

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

27

Pmsl- Obs

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

28

ECMWF

Reliab. - 24 h Acc. Precip H+54 (1,5,10,20) mm

Reliab. - 6 h Acc. Precip H+24 (1,5,10,20) mm

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

29

ObservationsReliab. - 6 h Acc. Precip H+24 (1,5,10,20) mm

Reliab. - 24 h Acc. Precip H+54 (1,5,10,20) mm

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

30

ROC curves – 24 h Acc Precip (1, 5, 10 & 20 mm)

ECMWF Observations

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

31

ECMWF - AnalysisR

OC

10 m wind H+24 (10,15,20) m/s

Reliab

ilit

y

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

32

Observations10 m wind H+24 (10,15,20) m/s

Reliab

ilit

yR

OC

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

33

European Climate Networks

24 hours acc. precipitation (from early morning).From Spain, Germany, France, UK, …More than 12,000 observations every day.

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

34

Reliability & Sharpness

Good reliability according tothresholds (base rate)forecast length

NoUnder-samplin

g

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

35

BMA500 hPa Temperature (T500) & Geopotential (Z500)

3, 5 and 10 days of training period3 months of calibration (April, May and June of 2006) 24, 48 and 72 hours forecast

10m Wind speed (S10m)3, 5, 10 and 25 days of training period1 month for S10m (April 2006)24, 48 and 72 hours forecast

Calibration using TEMP and SYNOP obs over Europe

Calibration and bias correction: BMA

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

36

RESULTS

MULTIMODEL

BMA 3 T. DAYS

BMA 5 T. DAYS

BMA 10 T. DAYS

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

37

RESULTS

MULTIMODEL

BMA 3 T. DAYS

BMA 5 T. DAYS

BMA 10 T. DAYS

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

38

RESULTS

MULTIMODEL

BMA 3 T. DAYS

BMA 5 T. DAYS

BMA 10 T. DAYS

BMA 25 T. DAYS

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

39

RESULTS

BMA 3 T. DAYS

BMA 5 T. DAYS

BMA 10 T. DAYS

BMA 25 T. DAYS

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

40

HRM T500 td 3 H+72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T HAV

HEC

HGM

WEIGHTS TIME SERIES

HIRLAM T500 td 3 H+72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATEW

EIG

HT

IAV

IEC

IGM

IUK

LM T500 td 3 H+72

0,000

0,100

0,200

0,300

0,400

0,500

0,600

0,700

0,800

0,900

1,000

DATES

WE

IGH

TS LAV

LEC

LGM

LUK

MM5 td 3 H+72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

MAV

MEC

MGM

MUK

UM T500 td 3 H+72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

UAV

UEC

UGM

UUK

HRM HIRLAM LOKAL MODEL

MM5 UM

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

41

HIRLAM td 3 H+48

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

IAV

IEC

IGM

IUK

HIRLAM T500 td 3 H+72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

IAV

IEC

IGM

IUK

WEIGHTS TIME SERIES

HIRLAM td 3 H+24

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

IAV

IEC

IGM

IUK

HIRLAM

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

42

HIRLAM T500 td 3 H+72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

IAV

IEC

IGM

IUK

WEIGHTS TIME SERIES

HIRLAM td 5 H+72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

IAV

IEC

IGM

IUK

HIRLAM td 10 h+ 72

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

IAV

IEC

IGM

IUK

HIRLAM

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

43

WEIGHTS TIME SERIES

HIRLAM td 3 H+24

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WE

IGH

T

IAV

IEC

IGM

IUK

Z500 td 3 H + 24

0.000

0.100

0.200

0.300

0.400

0.500

0.600

0.700

0.800

0.900

1.000

DATE

WEI

GH

T

IAV

IEC

IGM

IUK

HIRLAM

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

44

Conclusions

A Multi-model-Multi-boundaries Short Range Ensemble Prediction System (MMSREPS), has been develop at the INM-Spain.Taking advantage of using IC’s & BC’s from different high resolution global models.

Nice spread in the short-range, but …Daily transmission of very large amount of data (full resolution global model fields).Dependence of different priorities of the different operational centres.

Good cooperation across Europe:UKMO, DWD, COSMO INMINM ARPA – SIM DWD

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

45

Weaknesses of the interoperability project

Development and maintenance of interface software.Commercial policy of NWP data across Europe.Easy exchange of software among Met Services.

No model is better than others every time and everywhere

Improved exchange of NWP data and software among Met Services in Europe

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

46

Questions

j.garciamoya@inm.es

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

47

Analysis ECMWF December, 27 1999 at 18 UTC

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

48

ECMWF - OPR Comparison H+42

HIRLAM ECMWF

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

49

ECMWF - OPR Comparison H+30

HIRLAM ECMWF

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

50

ECMWF - OPR Comparison H+18

HIRLAM ECMWF

ECMWF, 14-15 January 2008

SRNWP Interoperability Workshop

51

ECMWF - OPR Comparison H+6

HIRLAM ECMWF