Intelligent facility management & energy efficiency systems

Post on 12-Jul-2015

347 views 1 download

Tags:

Transcript of Intelligent facility management & energy efficiency systems

Facilities’ Energy Challenges from an

Intelligent Perspective

Intelligent Facility Management &

Energy Efficiency Systems

SATCHNET ELECTRONIC SYSTEMSLocal Systems’ Integration Experts

Firas Obeido CEM

Who We Are?

A Leading Facility Automation Systems’ Integrators with A Major Vision to Step In & Change the

Local Perception of Energy Management Solutions

Power Monitoring

& Management

Metering and Monitoring

Variable Speed Drives

Power Quality (UPS)

LightingSchedule Based Lighting Control

Facility AutomationHVACWater & PumpingEnergy Management

SecurityDigital Video ManagementAccess ControlIntrusion Detection

Design

&

Installation

Operations

&

Maintenance

Evaluation

&

Retrofit

Single Source Solutions throughout the Facility Life Cycle

Fire and Life Safety

Service & Maintenance (CMMS)

Complete Facility Solutions

For All Phases of your

Facility

The Challenge

The life cycle cost of a Facility

A Peek at the Solution

Measure it

Control It

Manage it

Oth

ers

..

Security

&

Fire

Fuel

Managem

en

t

Wate

r

Lig

hting

Pow

er

Managem

en

t

HV

AC

Contr

ols

Integrated Facility Management System

High Performance Green

Facility

Fault Detection and

Diagnostics (FDD)

Automated Demand

Response (ADR)

Automated Measurement

& Verification (M&V)

Energy Information

Systems (EIS)

Energy Information

Systems

Facility Owners,

Developers,

Occupants,

Consultants

Facility Managers, Operators, Financial Managers

Energy Efficiency Service

Providers &

Suppliers

Government Utilities, Policy

Makers

Intelligent Energy

Management Triangle

Visualization

Performance Indicators

Energy Saving Through BMS

ECM # 1 : Occupancy Time

Scheduling

10-20%

Case Study: Packaging Industrial Company

(PIC)

Operations & Actual Energy Savings

Boiler Stop

after 1000

second

Pump Stop

after 1800

second

Shut down timers

are user

adjustable

System start the

most energy

efficient chiller first

Chiller plant will start

if only one film

machine is working

Petra chiller start when

water temperature more

than 16 (14+2)

And stop when water

temperature less than

12 (14-2)

All these value are

user adjustable

Only when it needed

Hiross chiller (less

efficient chiller ) start

only Petra chiller can't

keep cold enough water

temperature

The schedule

weekly plan

This time

schedule start at

Saturday at 09:00

AM

And stop at

Thursday 11:00

PM

Special event

configured for

next Thursday

Since it will be

labor day holiday

Weekly schedule

remain as it is

except May

2,2013 it will be

stop

List of trend logs

One or more

value can be

display at once

Depending on

the purpose of

the report

There are several

type of the output

report

Se the period of

the data

Set the report title

The data can be

saved

Exported data

can be viewed

and formatted in

common program

All data in one page

Make it easy to monitor the

operation

Energy Saving Report

88,831.00 87,457.40

March - Dec. 2011 March - Dec. 2012

Energy (MWH) 1,354.84 1,333.89

Production TON 2,856.72 3,821.73

.KWH/Ton 474.26 349.03

1,3

54

.8

1,3

33

.9

2,8

56

.7

3,8

21

.7

474.3 349.0 -

500.00

1,000.00

1,500.00

2,000.00

2,500.00

3,000.00

3,500.00

4,000.00

4,500.00

Electricity for PIC SAVING = 32,555.6 = 27%

JO

D 2

60

,26

1.0

0

JO

D 3

15,9

21.1

6

JO

D 2

57

,80

7.3

1

JO

D 5

8,1

13

.85

JO

D 3

0,0

00

.00

JOD -

JOD 50,000.00

JOD 100,000.00

JOD 150,000.00

JOD 200,000.00

JOD 250,000.00

JOD 300,000.00

JOD 350,000.00

2011 ActualCost Before

BMS

2012 ExpectedCost Before

BMS

2012 ActualAfter BMS

Saving BMSInstallation

Cost

2011 Actual Cost BeforeBMS2012 Expected CostBefore BMS2012 Actual After BMS

Saving

Simple Payback (ROI) = 6.2

Months

Saving = 58,113.85 JOD = 18.4

%

Intelligence Out of the

Data

0

5

10

15

20

25

30

35

0

100000

200000

300000

400000

500000

600000

-367 1978 4521 1878 2052 3089 4428 3507 5691 5778

Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12

Variables Analysis

Sum of KWH Sum of KG Sum of Average Tempe (°C)

Thank You

Firas Obeido

Questions??