AVEVA User ConferenceIntegrated Engineering Deployment in a
New Engineering Office
Jeff Stroh
Director of Engineering, AEA
January, 2017
Engineering | Procurement | Construction | Installation
© 2017 McDermott International, Inc. All rights reserved
Agenda• Intro to McDermott
• Why Integrated Tools?
• Implementation Plan
• The Future
© 2017 McDermott International, Inc. All rights reserved
• vertically integrated
• industry leading
• seafloor to shore
• concept to commissioning
• locally focused and globally integrated
• extensive experience
• strategic partner
• committed to deliver
• superior safety records
McDermott
© 2017 McDermott International, Inc. All rights reserved
© 2017 McDermott International, Inc. All rights reserved
So where are we today?
© 2017 McDermott International, Inc. All rights reserved
What We Do Now
Specialized Tool
Manual processesLots of handovers and interfacesNo “single source of truth”
© 2017 McDermott International, Inc. All rights reserved
What’s Offered
© 2017 McDermott International, Inc. All rights reserved
E3D/PDMS Only70%
Integrated 2D & 3D15%
Integrated 2D, 3D, and Engineering
10%
Integrated Tools with AVEVA NET
5%
State of the Industry
© 2017 McDermott International, Inc. All rights reserved
Why Not?
$$$
“We need to re-train everybody”
“It’ll take too long to implement”
“We couldn’t make it work when we tried it before”
“My schedule is too short and I can’t risk it”
“The way we do projects works, so why change”
“What is my ROI for integrated tools?”
© 2017 McDermott International, Inc. All rights reserved
• Need a project
• Need a Client who understands (or better requires) integrated tools
• Need to be realistic about implementation phases
• Need sufficient time to implement
• Need implementation support
• Need Organizational Change Management
How?
© 2017 McDermott International, Inc. All rights reserved
• Fast Track EPCIC
• Client – PEMEX
• Started in June of 2016
• 30 Month Schedule – Award to Handover
• Execution Model – start in KL, move to Mexico City
NRF-107 – MODELOS ELETRONICOS BIDIMENSIONALES Y TRIDIMENSIONALES INTELEGENTES PARA INSTALACIONES
“2D and 3D Intelligent Electronic Models for Installations”
• Interconnected 2D & 3D Drawings
• Set hierarchy
• Linked Documents
Abkatun A-2
© 2017 McDermott International, Inc. All rights reserved
Address “easy wins” and pain points for consistency
• AVEVA P&ID, Electrical, Instrumentation
• Model and P&ID Integration
• Schematic Model Manager
• Schematic 3D Integrator
• List Generation & Data Consistency
• AVEVA Engineering
Things Not Addressed
• Data Sheets – already had Client format & not enough time
• Structural Detailing – start of fabrication too fast to change systems, already partially integrated with PDMS
Implementation Goals
© 2017 McDermott International, Inc. All rights reserved
AVEVA Clash
Manager
Tag
Data
Third Party
(FEED) DataETAP
Third Party
P&ID
Packages
Pipe Stress/
Structural
Analysis
Interface
AVEVA
Instrumentation
AVEVA
Electrical
DIGITAL INFORMATION HUB (AVEVA NET)
Enterprise Asset
Management/CMMS
Project
Performance
Tools
ERP
Systems
Third Party
Engineering &
Design Tools
P&IDs
PFDs
Ducting Diagrams
Reports
Deliverable Publish to DIHWork / Data Flow
ISM
Information
Standard
Manager
AVEVA
Solution
Instrument Datasheets
Instrument Indexes
Loop Diagrams
Termination Drawings
Junction Box Diagrams
Hookup Diagrams
Cable Schedules
Bills of Material
Cable Block Diagrams
Electrical Datasheets
Load Lists
Single Line Diagrams
Schematic Diagrams
Termination Drawings
Electrical Installation
Diagrams
Cable Drumming
Cable Schedules
Cable Block Diagrams
Bills of Material
Reports
Datasheets
Line Lists
Equipment Lists
Consistency Checks
Reports
Construction Drawings
Isometrics
Gas
Reports
3D
Geometry
and DataAVEVA
REVIEW and
ReviewShare
(3rd
Party Access)
Laser
Data
ERM
Data
Third Party
Scheduling
Tools
SAP, Oracle,
BaaN, IFS
Third Party
Time Clocking
Services
ERP
Data
AVEVA ENGAGE
LFM
Laser
Survey
Data
Clash Reports
Trend Information
Clash Status
AVEVA Global
AVEVA
Engineering
Tagged Items
& Attributes
AVEVA P&ID
AVEVA Everything
3D
AVEVA
Bocad
m
PR
OC
UR
EM
EN
T
PLA
NN
ING
&
CO
NTR
OL
CO
NS
TR
UC
TIO
N
& C
ON
TR
OL
WORKPACK
MANAGEMENT
MATERIAL
MANAGEMENT
ERM
Sequencing (4D)
Status Visualization
Multi-Project
Equipment
Sizing
Calculations
Standards
Management
PROCON
AVEVA
E3D
Insight
AVEVA Catalog
Manager
Integrated Tools Deployment
© 2017 McDermott International, Inc. All rights reserved
© 2017 McDermott International, Inc. All rights reserved
Our Approach:
• Strong Senior Leadership Support
• Deploy in New Office – less organizational resistance
• Leverage support from existing office SMEs for carry-over tools and expose them to the new tools
• Get the SMEs and front-line managers onboard with the new tools
From Here:
• Communications Plan
• Why, What, and How
• Posters, Demos, Online Videos
• Updated Procedures and Training
Organizational Change Management
© 2017 McDermott International, Inc. All rights reserved
• ROI can be difficult to calculate
o Every project is different
o Clients are different
o Companies guard their information – not a lot of sharing
• Our approach to ROI is in the interfaces
o Reduce waste & misordering of materials
o Increase engineering productivity and reduce engineering manhours
Expected ROI
© 2017 McDermott International, Inc. All rights reserved
Discrete Tools
McDermott’s Roadmap
Integrated Engineering
Tools
Process
Mechanical
Electrical
InstrumentPiping
Structural
Safety
Safety
Process
Mechanical
Electrical
Instrument
Piping
Structural
© 2017 McDermott International, Inc. All rights reserved
The Future – PLM
INTEGRATED ENGINEERING TOOLS
Process Mechanical Piping Electrical Instrument
Structural Naval CSE Pipelines Commissioning
Project Lifecycle Management (PLM)Engineering Data
ManagementDocument Control
Project Status & Progress
Multi-CAD 3D Model
Cross-Function Change
Management
NON-ENGINEERING SOFTWAREERP
Project Cost Control
PlanningFabrication
ManagementWork Packaging
© 2017 McDermott International, Inc. All rights reserved
There is a bit of a light at the end of the tunnel; however the industry still has a long way to go as a whole to unlock the potential of integrated engineering tools.
Success factors for integrated tools revolves around addressing organizational change management – without your people onboard, you won’t succeed.
Future state for the industry must revolve around data re-use which is enabled through Integrated Engineering Tools.
Summary