Initial Org Setup in ECC

Post on 12-Apr-2016

224 views 4 download

description

ewm setup

Transcript of Initial Org Setup in ECC

1.Initial Org Setup in ECC

Define Plant (Copy from 0001)-

Spro-> IMG Enterprise structure Definition Logistic genral Copy delete check Plant

Define shipping Point

Define Storag location

4. Assign plant to cocode

5. Deifne shipping condition & loading groups

6. Define Warehouse

6. Assign warehouse to plant /Sloc

7. Assign Warehouse to EWM warhouse

Assign shipping points to plants

Maintian shipping point for outbound deliveries

Maintain shipping point for inbound deliveries

Define number range interval for unchecked deliveriesd

VN01

Assign unchecked deliveries number range for Outbound delivery

Assign unchecked deliveries number range for inbound delivery

Define Delivery split by warehouse number

ACTIVATE spm

MAINTAIN ewm SPECIFIC PARAMETERS

Basic Setup in EWM Server

1. Define Warehouse

Or

Copy

\

2. Maintain supply chain unit

3. Assign an SCU and Business partner to Warehouse

4. Assign EWM warehouse to ERP warehouse

5. Define Availability Group f

6. Define non location based stock types

7. Define stock type fro warehouse8.

9. Define stock removal rule

10. Define Storage Types

STORAGE SECTION

11. STORAGE BIN TYPES

WH STYPE SSEC SBINTYPE

SATH NORM GEN1 NORM

SATH FROZ COOL MEAT

SATH COLD MEAT COLD

SATH COLD MILK MILK

12. BIN ACCESS TYPES

BIN IDENTIFIERS FOR STORAGE BIN STRUCTURE

Genrate Bin Structures /n/SCWM/LS10.