Global requirements on the machineGlobal requirements on the machine
Highest energy proton collisions for ATLAS and CMSHighest energy proton collisions for ATLAS and CMS Nominal luminosity 10Nominal luminosity 103434 cm cm-2-2 s s-1-1 in points 1 and 5 in points 1 and 5
Highest energy proton collisions for LHCbHighest energy proton collisions for LHCb Nominal luminosity ~ 5 10Nominal luminosity ~ 5 103232 cm cm-2-2 s s-1-1 in point 8 in point 8
Proton collisions @ various energies for ALICEProton collisions @ various energies for ALICE Nominal luminosity ~ 10Nominal luminosity ~ 103030 cm cm-2-2 s s-1-1 in point 2 in point 2
Ion collisions @ various energies for ALICEIon collisions @ various energies for ALICE Nominal luminosity ~ 10Nominal luminosity ~ 102727 cm cm-2-2 s s-1-1 in point 2 in point 2 ATLAS and CMS will also take dataATLAS and CMS will also take data
Proton collisions @ various energies for TOTEMProton collisions @ various energies for TOTEM
Proton luminosity
running
Dedicated
Dedicated
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Lower energy runsLower energy runs
TOTEM would like to have low energy runs during the first TOTEM would like to have low energy runs during the first phase of the LHC operation:phase of the LHC operation:
√√s= 1.8 TeV for direct comparison with TEVATRON s= 1.8 TeV for direct comparison with TEVATRON √√s ~ 8 TeV to measure s ~ 8 TeV to measure
ALICE would like to have a dedicated pp run at √s= 5.5 TeV ALICE would like to have a dedicated pp run at √s= 5.5 TeV (nucleon-nucleon √s for nominal Pb-Pb runs) for a direct (nucleon-nucleon √s for nominal Pb-Pb runs) for a direct comparison of the Pb-Pb and pp data. A lower energy Pb-Pb comparison of the Pb-Pb and pp data. A lower energy Pb-Pb run may be requested too. However both requests are for a run may be requested too. However both requests are for a later stage of the LHC operationlater stage of the LHC operation
Lower energy pp runs during early running are also discussedLower energy pp runs during early running are also discussed
Low energy runs are currently neither in the ATLAS nor in the Low energy runs are currently neither in the ATLAS nor in the CMS baseline physics program. However this request may CMS baseline physics program. However this request may come at a much later phase of the LHC operationcome at a much later phase of the LHC operation
0)(Im
)(Re
t
el
el
tf
tfinelel
teltot NN
dtdN
0
2
)/(
)1(
16
- From Chamonix XIV -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Proton luminosity runningProton luminosity running
HHSM SM -> 4 l (M -> 4 l (MHiggs Higgs = 140-155 GeV and 190-450 GeV) can be discovered with = 140-155 GeV and 190-450 GeV) can be discovered with ~ 4 fb~ 4 fb-1 -1
Some supersymmetry can be discovered at more modest luminosities ~ 1 fbSome supersymmetry can be discovered at more modest luminosities ~ 1 fb -1-1
Potential for b-physics right from startupPotential for b-physics right from startup
ATLAS and CMSATLAS and CMS Minimize event pileup early onMinimize event pileup early on Go to 25ns as soon as possibleGo to 25ns as soon as possible Will make use of any beam for detector commissioningWill make use of any beam for detector commissioning
LHCbLHCb Tune IP8 to optimize luminosity (1m < Tune IP8 to optimize luminosity (1m < ** >> 50m)50m) Go to 25ns as soon as possible (optimized for ~ 1 events/crossing)Go to 25ns as soon as possible (optimized for ~ 1 events/crossing) Dipole polarity change ~ every fillDipole polarity change ~ every fill
ALICEALICE Will use proton beams (intrinsic interest and reference data)Will use proton beams (intrinsic interest and reference data) Tune IP2 to optimize luminosity (0.5m < Tune IP2 to optimize luminosity (0.5m < ** >> 50m)50m) Magnet polarities change ( + - 0 ) a few times per yearMagnet polarities change ( + - 0 ) a few times per year
(106 seconds @ <L> of 1033 cm-2 s-1 = 1 fb-1)
- From Chamonix XIV -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
High luminosity runningHigh luminosity running
Eventual goal: luminosity of 10Eventual goal: luminosity of 103434 cm cm-2-2 s s-1 -1 (ATLAS & CMS) (ATLAS & CMS)
Nominal ParametersNominal Parameters
Beam energy (TeV)Beam energy (TeV) 7.07.0
Number of particles per bunchNumber of particles per bunch 1.15 101.15 101111
Number of bunches per beamNumber of bunches per beam 28082808
Crossing angle (Crossing angle (rad)rad) 285285
Nomalised transverse emittance (Nomalised transverse emittance (m rad)m rad) 3.753.75
Bunch length (cm)Bunch length (cm) 7.557.55
Beta function at IP 1, 2, 5, 8 (m)Beta function at IP 1, 2, 5, 8 (m) 0.55,10,0.55,100.55,10,0.55,10
FfkN
Ln
b*
2
4
Related parametersRelated parameters
Luminosity in IP 1 & 5 (cmLuminosity in IP 1 & 5 (cm-2-2 s s-1-1)) 10103434
Luminosity in IP 2 & 8 (cmLuminosity in IP 2 & 8 (cm-2-2 s s-1-1)) ~5 10~5 103232
Transverse beam size at IP 1 & 5 (Transverse beam size at IP 1 & 5 (m)m) 16.716.7
Transverse beam size at IP 2 & 8 (Transverse beam size at IP 2 & 8 (m)m) 70.970.9
Stored energy per beam (MJ)Stored energy per beam (MJ) 362362
2
*21/1
zcF
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
28082808 is a lot of bunches per beam is a lot of bunches per beam
Filling scheme requires Filling scheme requires 12 SPS cycles per 12 SPS cycles per beambeam
Each with 2,3 or 4 Each with 2,3 or 4 batches of 72 bunchesbatches of 72 bunches
Crossing angle neededCrossing angle needed Emittance conservation with 10Emittance conservation with 101111
protons per bunch throughprotons per bunch through InjectingInjecting RampingRamping Squeezing to 0.55mSqueezing to 0.55m
This is going to take us a little This is going to take us a little while !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!while !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
362MJ362MJ is a lot of beam energy to handle is a lot of beam energy to handle
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
So how to get there ?So how to get there ?
Both machine and experiments will have to learn how to stand running Both machine and experiments will have to learn how to stand running at nominal intensitiesat nominal intensities
An early aim is to find a balance between robust operation and An early aim is to find a balance between robust operation and satisfying the experimentssatisfying the experiments
Maximize integrated luminosityMaximize integrated luminosity Minimize event pile-up (to event + 2)Minimize event pile-up (to event + 2)
Avoid quenches (and damage)Avoid quenches (and damage) Higher Higher ** to avoid problems in the (later part of) the squeeze to avoid problems in the (later part of) the squeeze Reduce total current to reduce stored beam energyReduce total current to reduce stored beam energy
Lower iLower ibb
Fewer bunchesFewer bunches Reduce energy to get more margin ?Reduce energy to get more margin ?
Against transient beam lossesAgainst transient beam losses Against magnet operating close to training limitAgainst magnet operating close to training limit Hardware commissioning will tell us moreHardware commissioning will tell us more
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Other considerationsOther considerations
Electron cloud ( LHC simulations and SPS experience )Electron cloud ( LHC simulations and SPS experience ) iibb < 35% nominal for 25ns spacing < 35% nominal for 25ns spacing iibb ~ nominal for > 50ns ~ nominal for > 50ns
With With lower currentslower currents in mind, two machine systems will be staged in mind, two machine systems will be staged Only 8 of 20 beam dump dilution kickers initially installedOnly 8 of 20 beam dump dilution kickers initially installed
Total beam intensity < 50% nominalTotal beam intensity < 50% nominal Install the rest when neededInstall the rest when needed
Collimators ( robustness, impedance and other issues )Collimators ( robustness, impedance and other issues ) Phased approachPhased approach Run at the impedance limit during phase IRun at the impedance limit during phase I
Lower currentsLower currents Higher Higher **
Under review!
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Proposal for early proton runningProposal for early proton running
Phase I collimators and partial beam dumpPhase I collimators and partial beam dump
1.1. Pilot physics run with few bunchesPilot physics run with few bunches No parasitic bunch crossingsNo parasitic bunch crossings Machine de-bugging no crossing angleMachine de-bugging no crossing angle 43 bunches, unsqueezed, low intensity43 bunches, unsqueezed, low intensity Push performance (156 bunches, partial squeeze in 1 and 5, push intensity)Push performance (156 bunches, partial squeeze in 1 and 5, push intensity)
2.2. 75ns operation75ns operation Establish multi-bunch operationEstablish multi-bunch operation Relaxed machine parameters (squeeze and crossing angle)Relaxed machine parameters (squeeze and crossing angle) Push squeeze and crossing angle Push squeeze and crossing angle
3.3. 25ns operation with Phase I collimators + partial beam dump25ns operation with Phase I collimators + partial beam dump Needs scrubbing for higher intensities ( iNeeds scrubbing for higher intensities ( ibb > 3 - 4 10 > 3 - 4 101010 ) )
Phase II collimators and full beam dumpPhase II collimators and full beam dump
4.4. 25ns operation25ns operation Push towards nominal performancePush towards nominal performance
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Commissioning for Stage 1Commissioning for Stage 1 - From Chamonix XIV -
- 450GeV machine -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Commissioning for Stage 1Commissioning for Stage 1- From Chamonix XIV -
- Ramp and Squeeze -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
- From Chamonix XIV -
- 450GeV machine - - Ramp and Squeeze -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Along the wayAlong the way
Equipment commissioning with beamEquipment commissioning with beam Machine protection commissioningMachine protection commissioning Instrumentation commissioningInstrumentation commissioning
First turn i.e. immediatelyFirst turn i.e. immediately Screens, BPMs, fast BCT, BLMsScreens, BPMs, fast BCT, BLMs
Circulating beams at 450 GeVCirculating beams at 450 GeV BPMs, DC BCT & lifetime, BLMsBPMs, DC BCT & lifetime, BLMs Transverse diagnosticsTransverse diagnostics Emittance: wire scanners..Emittance: wire scanners..
Snapback and RampSnapback and Ramp Chromaticity, PLLChromaticity, PLL OrbitOrbit BLMs to BIC etc.BLMs to BIC etc.
Checks with beam Checks with beam BPM Polarity, corrector polarity, BPM responseBPM Polarity, corrector polarity, BPM response
Beam measurementsBeam measurements beam parameter adjustment, energy, linear optics checks, aperture beam parameter adjustment, energy, linear optics checks, aperture etc. etc.etc. etc.
- From Chamonix XIV -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Stage 1 – pilot run luminositiesStage 1 – pilot run luminosities
No squeeze to startNo squeeze to start 43 bunches per beam (some displaced in one beam for LHCb)43 bunches per beam (some displaced in one beam for LHCb) Around 10Around 101010 per bunch per bunch Push one or all ofPush one or all of
Partial optics squeeze in 1 and 5 (2m ???)Partial optics squeeze in 1 and 5 (2m ???) Increase bunch intensityIncrease bunch intensity 156 bunches per beam (some displaced in one beam for LHCb)156 bunches per beam (some displaced in one beam for LHCb)
Beam energy (TeV)Beam energy (TeV) 6.0, 6.5 or 7.0 6.0, 6.5 or 7.0 6.0, 6.5 or 7.0
Number of bunches per beamNumber of bunches per beam 43 43 156
* in IP 1, 2, 5, 8 (m)* in IP 1, 2, 5, 8 (m) 18,10,18,10 2,10,2,10 2,10,2,10
Crossing Angle (Crossing Angle (rad)rad) 0 0 0
Transverse emittance (Transverse emittance (m radm rad)) 3.75 3.75 3.75
Bunch spacing (Bunch spacing (s)s) 2.025 2.025 0.525
Bunch IntensityBunch Intensity 1 1010 4 1010 4 1010
Luminosity IP 1 & 5 (cmLuminosity IP 1 & 5 (cm-2-2 s s-1-1)) ~ 3 1028 ~ 5 1030 ~ 2 1031
Luminosity IP 2 (cmLuminosity IP 2 (cm-2-2 s s-1-1)) ~ 6 1028 ~ 1 1030 ~ 4 1030
FfkN
Ln
b*
2
4
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Stage 2 – 75ns luminositiesStage 2 – 75ns luminosities
Partial squeeze and smaller crossing angle to startPartial squeeze and smaller crossing angle to start Luminosity tuning, limited by event pileupLuminosity tuning, limited by event pileup Establish routine operation in this modeEstablish routine operation in this mode Move towards nominal squeeze (1m ???) and crossing angleMove towards nominal squeeze (1m ???) and crossing angle Increase bunch intensity ?Increase bunch intensity ? Tune IP2 and IP8 to meet experimental needsTune IP2 and IP8 to meet experimental needs
Down in IP8 (1m ???)Down in IP8 (1m ???) Up in IP2 (50m ??? Then transverse beam displacement probably needed)Up in IP2 (50m ??? Then transverse beam displacement probably needed)
FfkN
Ln
b*
2
4
Beam energy (TeV)Beam energy (TeV) 6.0, 6.5 or 7.0 6.0, 6.5 or 7.0 6.0, 6.5 or 7.0
Number of bunches per beamNumber of bunches per beam 936 936 936
* in IP 1, 2, 5, 8 (m)* in IP 1, 2, 5, 8 (m) 2,10,2,10 1,10,1,10 1,10,1,10
Crossing Angle (Crossing Angle (rad)rad) 250 285 285
Transverse emittance (Transverse emittance (m radm rad)) 3.75 3.75 3.75
Bunch IntensityBunch Intensity 4 1010 4 1010 9 1010
Luminosity IP 1 & 5 (cmLuminosity IP 1 & 5 (cm-2-2 s s-1-1)) ~ 1 1032 ~ 2 1032 ~ 1 1033
Luminosity IP 2 & 8 (cmLuminosity IP 2 & 8 (cm-2-2 s s-1-1)) ~ 2 1031 ~ 2 1031 ~ 1 1032
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Production physics runningProduction physics running Start with bunch intensities below electron cloud thresholdStart with bunch intensities below electron cloud threshold Scrubbing run (1-2 weeks)Scrubbing run (1-2 weeks) Increase bunch intensities to beam dump & collimator limitIncrease bunch intensities to beam dump & collimator limit
Install beam dump kickers Install beam dump kickers Install phase II collimatorsInstall phase II collimators
Increase bunch intensities towards nominalIncrease bunch intensities towards nominal Tune IP2 and IP8 to meet experimental needsTune IP2 and IP8 to meet experimental needs
Transverse beam displacement certainly needed in IP2Transverse beam displacement certainly needed in IP2
Stage 3 & 4 – 25ns luminositiesStage 3 & 4 – 25ns luminosities FfkN
Ln
b*
2
4
Beam energy (TeV)Beam energy (TeV) 6.0, 6.5 or 7.0 6.0, 6.5 or 7.0 7.0
Number of bunches per beamNumber of bunches per beam 2808 2808 2808
* in IP 1, 2, 5, 8 (m)* in IP 1, 2, 5, 8 (m) 1,10,1,10 1,10,1,10 0.55,10,0.55,10
Crossing Angle (Crossing Angle (rad)rad) 285 285 285
Transverse emittance (Transverse emittance (m radm rad)) 3.75 3.75 3.75
Bunch IntensityBunch Intensity 3 1010 5 1010 1.15 1011
Luminosity IP 1 & 5 (cmLuminosity IP 1 & 5 (cm-2-2 s s-1-1)) ~ 4 1032 ~ 1 1033 1034
Luminosity IP 2 & 8 (cmLuminosity IP 2 & 8 (cm-2-2 s s-1-1)) ~ 4 1031 ~ 1 1032 ~ 5 1032
Long shutdown (6months)
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
0.0
2000.0
4000.0
6000.0
8000.0
10000.0
12000.0
14000.0
-3000.0 -2000.0 -1000.0 0.0 1000.0 2000.0
Time [s]
MB
cu
rren
t
0
1
2
3
4
5
6
7
8
9
B [
T]
Preinjection plateau
Ramp down
Start ramp
Injection
Beam dump
Physics PreparePhysics
** adjustments - Squeeze adjustments - Squeeze
SqueezeGoing to be tricky to set up in any case (Optics changes and collimators)Foresee to do it after ramp to physics energy
• IP 1 and 5 to 2m or maybe 1m should become routine• IP 8 to values between 10m and 1m more tricky• IP 2 to values between 10m and 50m more tricky
Squeezing at other energies will be even more tricky• Stick with injection optics at lower energies ?
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
0.0
2000.0
4000.0
6000.0
8000.0
10000.0
12000.0
14000.0
-3000.0 -2000.0 -1000.0 0.0 1000.0 2000.0
Time [s]
MB
cu
rren
t
0
1
2
3
4
5
6
7
8
9
B [
T]
Preinjection plateau
Ramp down
Start ramp
Injection
Beam dump
Physics PreparePhysics
FillingFilling
SchemeScheme Number Number of of bunches bunches per ringper ring
Nominal Nominal bunch bunch spacing spacing ((μμs)s)
Number Number of of bunches bunches in PSin PS
SPS filling pattern SPS filling pattern (number of PS cycles (number of PS cycles per SPS cycle and per SPS cycle and number of SPS cycles)number of SPS cycles)
SPS SPS cycle cycle length length (s)(s)
Filling Filling time per time per ring ring (min)(min)
4343 4343 2.0252.025 11 244 344 344 344 244 344 344 344
(12 SPS cycles, 43 PS cycles)(12 SPS cycles, 43 PS cycles)21.621.6 ~ 4~ 4
156156 156156 0.5250.525 44 234 334 334 334 234 334 334 334
(12 SPS cycles, 39 PS cycles)(12 SPS cycles, 39 PS cycles)21.621.6 ~ 4~ 4
75ns75ns 936936 0.0750.075 2424 234 334 334 334 234 334 334 334
(12 SPS cycles, 39 PS cycles)(12 SPS cycles, 39 PS cycles)21.621.6 ~ 4~ 4
25ns25ns 28082808 0.0250.025 7272 234 334 334 334 234 334 334 334
(12 SPS cycles, 39 PS cycles)(12 SPS cycles, 39 PS cycles)21.621.6 ~ 4~ 4
FillingAll the beams below have been made, but …Complicated scheme for all physics runs• 12 SPS cycles per LHC ring• Procedures defined (LHC is the master)• Need to demonstrate that we can do it• Reliability implications for injectors• Compounded by LHCb magnet polarity switch
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
IonsIons
Experiment sideExperiment side ALICE, ATLAS and CMS will all take Pb-Pb dataALICE, ATLAS and CMS will all take Pb-Pb data Detectors and machine will be already commissioned with ppDetectors and machine will be already commissioned with pp ALICE requests ALICE requests
4 week ion runs at the end of each year4 week ion runs at the end of each year first short run as early as possiblefirst short run as early as possible
Machine sideMachine side Start with early ion scheme (62 bunches instead of 592, 7 10Start with early ion scheme (62 bunches instead of 592, 7 1077 ions per bunch) ions per bunch) Will have to Will have to
Re-commission injection, first turnRe-commission injection, first turn Set up RF capture and instrumentationSet up RF capture and instrumentation Re-commission ramp and squeezeRe-commission ramp and squeeze Establish collisionsEstablish collisions
Could do (some of) this early on if injectors are ready (same optics as for p)Could do (some of) this early on if injectors are ready (same optics as for p) Ion runs could provide cool down of PS SPS LHC after proton operationIon runs could provide cool down of PS SPS LHC after proton operation After early ion scheme run, increase number of bunchesAfter early ion scheme run, increase number of bunches Move to nominal when possible Move to nominal when possible
Estimate 1-3 weeks for first setup
Followed by physics run
- From Chamonix XIV -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Ion filling and luminositiesIon filling and luminosities
EarlyEarly NominalNominal
Beam energy / nucleon (TeV)Beam energy / nucleon (TeV) 2.76 2.76
Number of bunches (per beam)Number of bunches (per beam) 62 592
* in IP 2 (m)* in IP 2 (m) 1 0.5
Crossing Angle (Crossing Angle (rad)rad) 0 0
Transverse emittance (Transverse emittance (m radm rad)) 1.5 1.5
Bunch spacing (Bunch spacing (s)s) 0.099 1.350
Bunch IntensityBunch Intensity 7 107 7 107
Luminosity in IP2 (cmLuminosity in IP2 (cm-2-2 s s-1-1)) ~ 5 1025 1027
FfkN
Ln
b*
2
4
SchemeScheme Number Number of of bunches bunches per ringper ring
Nominal Nominal bunch bunch spacing spacing ((μμs)s)
Number Number of of bunches bunches in PSin PS
SPS filling pattern SPS filling pattern (number of PS cycles (number of PS cycles per SPS cycle and per SPS cycle and number of SPS cycles)number of SPS cycles)
SPS SPS cycle cycle length length (s)(s)
Filling Filling time per time per ring ring (min)(min)
Early ionEarly ion 6262 1.3501.350 11 2444 4444 4444 4444 2444 4444 4444 4444
(16 SPS cycles, 62 PS cycles)(16 SPS cycles, 62 PS cycles)21.621.6 ~ 6~ 6
Nominal ionNominal ion 592592 0.1000.100 44 81313 121313 121313 12131381313 121313 121313 121313
(12 SPS cycles, 148 PS cycles)(12 SPS cycles, 148 PS cycles)5454 ~ 10~ 10
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
TOTEMTOTEM
A standard TOTEM year would beA standard TOTEM year would be σσtot tot measurement high prioritymeasurement high priority
Nominal emittance OK for Nominal emittance OK for σσtottot, 1 , 1 μμm needed for elastic scatteringm needed for elastic scattering 3 * 1 day runs at 3 * 1 day runs at * of 1540m with 43 or 156 bunches per beam * of 1540m with 43 or 156 bunches per beam 2 * 1 day runs at 2 * 1 day runs at * of 18m with 2808 bunches per beam (25ns)* of 18m with 2808 bunches per beam (25ns)
ATLAS requests a period of a few weeks after first years of runningATLAS requests a period of a few weeks after first years of running
Machine sideMachine side Special machine conditions, similar to polarisation runs at LEPSpecial machine conditions, similar to polarisation runs at LEP Very demanding on beam and optics quality, and for collimationVery demanding on beam and optics quality, and for collimation Initial setup will take several days (maybe better dispersed)Initial setup will take several days (maybe better dispersed) Subsequent setups should take a shift or twoSubsequent setups should take a shift or two Longer runs may be more efficient if machine reproducibility is an issueLonger runs may be more efficient if machine reproducibility is an issue
- From Chamonix XIV -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
TOTEM luminositiesTOTEM luminosities
Total Cross Section and Elastic scatteringTotal Cross Section and Elastic scattering Diffraction and minimum biasDiffraction and minimum bias Characterized byCharacterized by
Several 1 day runs per year (starting early)Several 1 day runs per year (starting early) Some single beam runsSome single beam runs 43 and 156 bunches per beam (as during Stage 1)43 and 156 bunches per beam (as during Stage 1) IP5 IP5 ** = 1540m = 1540m IP5 IP5 ** = 18m = 18m
Beam energy (TeV)Beam energy (TeV) 6.0, 6.5 or 7.0 6.0, 6.5 or 7.0 6.0, 6.5 or 7.0
Number of bunches per beamNumber of bunches per beam 43 156 2808
* in IP 5 (m)* in IP 5 (m) 1540 1540 18
Crossing Angle (Crossing Angle (rad)rad) 0 0 285
Transverse emittance (Transverse emittance (m radm rad)) 3.75 3.75 3.75
Bunch spacing (Bunch spacing (s)s) 2.025 0.525 0.025
Bunch IntensityBunch Intensity 3 1010 6 1010 1.15 1011
Luminosity IP 5 (cmLuminosity IP 5 (cm-2-2 s s-1-1)) ~ 4 1027 ~ 6 1028 ~ 3 1032
FfkN
Ln
b*
2
4
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
SchedulingScheduling
Every year we will need a long shutdown (3-4 months)Every year we will need a long shutdown (3-4 months)
At the end of every shutdownAt the end of every shutdown Close the machine personnel access systemClose the machine personnel access system Get all equipment ready for beam (machine checkout, ~ 4 weeks)Get all equipment ready for beam (machine checkout, ~ 4 weeks) Get machine ready for operation (setup with beam, 2-3 weeks)Get machine ready for operation (setup with beam, 2-3 weeks)
During periods of operationDuring periods of operation Need regular technical stops (3 days every month)Need regular technical stops (3 days every month)
Interventions need careful but flexible planningInterventions need careful but flexible planning Get machine ready for operation (1 day)Get machine ready for operation (1 day) Machine development (around 15% during first years)Machine development (around 15% during first years) Operations for physicsOperations for physics Access as required for unscheduled stopsAccess as required for unscheduled stops
- From Chamonix XIV -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
Breakdown of a normal yearBreakdown of a normal year
7
140 days for physics per yearNot forgetting ion and TOTEM operation
Leaves ~ 100 days for proton luminosity running? Efficiency for physics 40% ?
40 days ~ 1000 h ~ 4 106 s of colliding beams / year
- From Chamonix XIV -
R,Bailey, LHCMAC, June 2005R,Bailey, LHCMAC, June 2005
So the first few years could look like …So the first few years could look like …
Starting in 07, phase II collimators in 09/10Starting in 07, phase II collimators in 09/10