Kingdom of CambodiaKingdom of Cambodia
Infrastructure DevelopmentInfrastructure Development
September 2011September 2011
1
Hong Sinara, Ph.DHong Sinara, Ph.DDeputy Director General of Deputy Director General of
Public WorksPublic Works
Ministry of Public Works and TransportMinistry of Public Works and Transport
Chapter A-1
Economy
Rice cropping plays an important role in the economyIn 2010 Cambodia's per capita income is $2,470 and $1,040 in nominal per capita. Cambodia's per capita income is rapidly increasing but is low compared to other countries in the region.Most rural households depend on agriculture and its related sub-sectors. Rice, fish, timber, garments and rubber are Cambodia's major exports.
Based on the Economist, IMF: Annual average GDP growth for the period 2001–2010 was 7.7% making it one of the world's top ten countries with the highest annual average GDP growth.
China is the biggest source of foreign direct investment in the kingdom. China plans to spend $8 billion in 360 projects in the first seven months of 2011.It is also the largest source of foreign aid, providing about $600 million in 2007 and $260 million in 2008.
2Chapter A-1
Tourism
The tourism industry is the country's second source after the textile industry. In 2007, visitor arrivals were about 2.0 million. The ministry of Tourism of Cambodia prepare to receive three million tourists in 2011 and five million in 2015.
Most visitors (51%) arrived through Siem Reap with the remainder (49%) through Phnom Penh and other destinations. Other tourist destinations include Sihanoukville in the south east which has several popular beach resorts and the area around Kampotand Kep including the Bokor Hill Station.
Most of the tourists were Japanese, Chinese, Americans, South Koreans and French people, it was report that, the industry earned 1400 million USD in 2007, almost 10% of the gross national products.
3Chapter A-1
Economic IndicatorEconomic IndicatorKey Economic Indicator (21 Jul 2011) Key Economic Indicator (21 Jul 2011)
NN Economic Indicator projection 2012p 2011p
1 GDP (million US$) 14,120 12,792
2 GDP Growth Rate 6.6% 8.7%
3 GDP per Capita (US$) 958 879
4 Inflation (Dec/Dec) 4.5% 6.3%
Source: Economic Institute Cambodia
4Chapter A-1
5Chapter A-1
6
Road Network Rehabilitation Map with International Assistant 2011
Chapter A-1
CAMBODIA ROAD NETWORKCAMBODIA ROAD NETWORKOddar MeancheyOddar Meanchey
Banteay MeancheyBanteay Meanchey
Siem ReapSiem Reap
BattambangBattambang
PailinPailin PursatPursat
Preah VihearPreah Vihear
Kampong ThomKampong Thom
Stung TrengStung Treng
KratieKratieMondul KiriMondul Kiri
Ratanak KiriRatanak Kiri
Kampong Kampong ChamCham
Prey VengPrey Veng
Svay RiengSvay RiengTakeoTakeo
KandalKandal
Phnom PenhPhnom PenhKampong Kampong SpeuSpeu
Koh KongKoh Kong
KampotKampot
KepKep
SihanoukvilleSihanoukville
Kampong Kampong ChhnangChhnang
11--Digit Digit RoadsRoads
22--Digit Digit RoadsRoads
Provincial Provincial RoadsRoads
Rural Rural RoadsRoads
Classification Lengths
1- Digit National Road:
2,115 Km
2- Digit National Road:
3,372 Km
Provincial Road (3 & 4 digits):
6,427 Km
National and Provincial Road:
11,914 Km
Rural Road : 38,527 KmTotal Road length :
50,441 Km
Gross Vehicle Weight: 25 T
Oddar MeancheyOddar Meanchey
Banteay MeancheyBanteay Meanchey
Siem ReapSiem Reap
BattambangBattambang
PailinPailin PursatPursat
Preah VihearPreah Vihear
Kampong ThomKampong Thom
Stung TrengStung Treng
KratieKratieMondul KiriMondul Kiri
Ratanak KiriRatanak Kiri
Kampong Kampong ChamCham
Prey VengPrey Veng
Svay RiengSvay RiengTakeoTakeo
KandalKandal
Phnom PenhPhnom PenhKampong Kampong SpeuSpeu
Koh KongKoh Kong
KampotKampot
KepKep
SihanoukvilleSihanoukville
Kampong Kampong ChhnangChhnang
1
23
7
6
5
4
8
7
6
Present ConditionPresent Condition
NR-1: 167Km-Japan: 51km, AC
Underway 9km -ADB:107 Km, DBST Completed
NR-2 :121km -Japan : 52km ( AC ) - Flood Project
NR-3 :201.5 km, -WB :21.5km, DBST
Completed-Korea:170 km DBST
Underway 137Km
NR-4 :214km -USA : AC - BOT
NR-5 :407km - ADB: AC , 48 Km
DBST, 316km - RGC : 91 km ,DBST
NR-6 :415km - ADB: AC ,102 Km
DBST, 236km - Japan: 77km ,AC NR-7 :461km
- ADB:DBST ,102 KmDBST, 204km
- Japan: 59km ,AC-China: 198 Km DBST
Ongoing
Completed
NR-8: 132Km-China: 132km, AC
Underway
Oddar MeancheyOddar Meanchey
Banteay MeancheyBanteay Meanchey
Siem ReapSiem Reap
BattambangBattambang
PailinPailin PursatPursat
Preah VihearPreah Vihear
Kampong ThomKampong Thom
Stung TrengStung Treng
KratieKratieMondul KiriMondul Kiri
Ratanak KiriRatanak Kiri
Kampong Kampong ChamCham
Prey VengPrey Veng
Svay RiengSvay RiengTakeoTakeo
KandalKandal
Phnom PenhPhnom PenhKampong Kampong SpeuSpeu
Koh KongKoh Kong
KampotKampot
KepKep
SihanoukvilleSihanoukville
Kampong Kampong ChhnangChhnang
1
23
7
6
5
4
8
7
6
BRIDGES Update BRIDGES Update
-Kizona Bridge-Japan 1 360m
Sekon Bridge- 1 057m
Neakloeun BridgeJapan 2 220mUnderway
-Koh kong Bridge-BOT 1 900m
Chrey Thom Bridg
Takmov BridgeChinaUnder construction
-Prek Kdam -China 981m
Prek Tamak BridgeChian 1 066m
Prek Phnov bridge
10Chapter A-1
Shortcut to GMS.lnk
Chapter A-1 11A
H11
AH11 AH1
AH1AH123
GMS
Asian Highway
ASEAN Highway
GMSRoute
Transit cities Length,Km
Primary Class I Class II Class III BeCl
AH1 AH1 Central-Sub corridor
Poipet-Sisophon 47.5 48
AH1 AH1 Central-Sub corridor
Sisophon-PhomPenh 360.0 360
AH1 AH1 Central-Sub corridor
Phnompenh-Bavet 164.0 57 107
Sub-total 571.5 104.45 467
AH11 AH11 Inter -corridor
Phnom penh-Sihanoukville
226.4 226.4
AH11 AH11 Inter –corridor
PPenh-Skun 75.0 75
AH11 AH11 Inter -corridor
Skun-Kg.Cham 49.0 49
AH11 AH11 Inter -corridor
Kg.Cham-Trapeangkriel 411.8 411.8
Sub-total 762.2 350.4 411.8
AH123 SouthernCoastal cor.
ChamYeam-kohkong 13.0 13.0
AH123 SouthernCoastal cor.
Kohkong-Sreambel 138.0 138.0
AH123 SouthernCoastal cor.
Sreambel-Vealring 42.0 42.0
AH123 SouthernCoastal cor.
Vealring-Kampot 36.0 36.0
AH123 SouthernCoastal cor.
Kampot-Prekchak 51.8 51.8
Sub-total 280.8 55.0 225.8
Northern sub corridor
Siemreap- Thalaborivat 305.2 38.8
Northern Thalaborivat 19 19 0
Chapter A-1 12
The rehabilitation program along AH1 from Phnom Penh to Neak Loeung and Neak Loeung Bridge at Lower Mekong River by Japan grant aid of $131M as follows:– Stage1: construction of 2 bridges of NR1
(completed in 2006).– Stage2: reconstruction of 43km of NR1 from
Neak Loeung to PK13 from Phnom Penh (completed).
– Stage3: reconstruction of the 9,1 km section to Phnom Penh PK 4, Completed.
– Stage 4: from PK4 to Monivong Bridge (MOU on project preparation signed on September 6, 2011).
– Neak Loeung cable stayed Bridge is under construction and expected to be finished in 2015.
Chapter A-1 13
Future rehabilitation projects: Project expansion (4 lanes) of AH1from Phnom Penh to Prek Kdam 30 km: 2012-2014 ($36M, Chinese loan)Expansion AH1 (4 lanes) from Prek Kdam to Sisophon about 337 km (under study by JICA team) Project implementation will be in 2012-2017, loan request from JICAExpansion AH11(NR6) to 4 lanes: Phnom Penh-Thnal Keng (42km)Expansion AH11(NR4) to 4 lanes: Phnom Penh -Sihanouk Ville.
Chapter A-1 14
15Chapter A-1
Financing Project’s Name Project Amount MUS$
Description of Projects Period Status
ChinaON-GOING PROJECTSRoads
Construction of NR 8 Prektamak-Anlounchey
Soft Loan 71.5 Total length 109km ,surface AC , width 11m,bridges 28 pcs 2007-2011 89.33%
Construction of NR 76 Snoul-Senmonorom
Soft Loan 51.9 Total length127km ,surface DBST , width 11m,bridges 14 pcs 2007-2009 96.81%
Construction of NR 57 Battambang-Pailin-Tai border
Soft Loan 41.88 Total length103km ,surface DBST , width 11m,bridges 19 pcs 2007-2011 95.19%
Rehabilitation of NR62 (Tbengmeanchey-Preasvihear ) and R.No. 210
Soft Loan 57.8 Total length 150km ,surface DBST , width 11m,bridges 44 2008-2011 87.91%
Rehabilitation of NR 62 (Kampong Thom-Tbeng Mean Chey )
Soft Loan 52 Total length 128km ,surface DBST , width 11m 2009-2012 39.77%
Reconstruction of NR 78, O Pongmoan-Banlung .
Soft Loan 73.3Total length is 123km, with Double Bituminous Surface Treatment- DBST).width 10m,bridges 13
2009-2013 28.02%
Extension Roads NR8-1 ( Krabao-Moeunchay ) and NR8-2 ( Anlung chrey-Krek).
Soft Loan 14.8 Total length NR8-1( 5.6km ) and NR8-2 ( 18.6km). surface AC , width 11m
2010
Rehabilitation of NR3762 ( Senmonorom-Dadam )
Soft Loan 14.89 Total length26.5km ,surface DBST , width 11m, 2010
Widerning of NR 61 ( Prek kdam- Thnol Totoeung NR6 )
Soft Loan 9.76 Total length 16 km , surface DBST , width 11m 2010-2011
Rehabilitation of NR59 ( Pinlin- Kundomrey )
72.89 Total length 144 km, surface DBST , width 11m 2010-2013
Rehabilitation of NR57B (Thor Kol-Bovel-Samphaovloun) , PR 1593 ( Bovel-Phom 30-Phnom Preuk) ,PR 1BB1 (Phom 30 -Komrean) .
Soft Loan 73(89.98) Rehabilitation of NR57B (Thor Kol-Bovel-Samphaovloun) 91Km , PR 1593 ( Bovel-Phom 30-Phnom Preuk)70Km ,PR 1BB1 (Phom 30 - Komrean) 21Km.Total length 182Km, surface DBST , width 11m
2010-2012
Chapter A-1 16
Financing Project’s Name Project Amount MUS$ Description of Projects Period Status
China NEGOTIATING PROJECTSRoads
Widerning of NR 5 ( Phnom Penh - Prek kdam ) 4 lane
Soft Loan 36 Total length 30 km , surface DBST , 2010-2012
Widerning of NR 6 ( Choy chava-Tholkaing ) 4 lane
Soft Loan 57 Total length 40 km , surface AC , 2010-2012
Rehabilitation of NR41 ( Thnol totoeung NR4- Chum kiri )
Soft Loan 46.25 Total length 95.28km,surface DBST 2010-2012 Commitment
Road connecting to Ta Kmao Bridge Soft Loan 7.49 Total length 11.1km 2010-2012
Bridges
Construction of Ta Kmao Bridge Soft Loan 25.4 Total length 795m , width m 2010-2012
Construction of Chroy Chava II Bridge
Soft Loan 27.5 Total length 719m , width m 2011-2013 Commitment
PRIORITY PROJECTSRoads
Construction of National Road 76 ( Ta ang – Senmonorom )
Loan 100 Construct new road with a length about 172 Km.
2010
Construction of Raod No 214 ( Tbeang Mean Chhey - Thalaboriwatt-Stung Treng).
Loan 100 Rehabilitation of a two-lanes in class III (DBST) of road in the total length about130Km of Thean Mean Chhey to Thala Boriwatt/(west bank of Stung Treng) .
2010
Construction and Rehabilitation NR 55 ( Posat- Thai border ).
Loan 60 Total length about 186Km 2010
Construction and Rehabilitation NR 43 ( Treang Trayoeung- Kampot ).
35 Total length about 78Km 2010
Construction and Rehabilitation NR 6 ( Thnol Kaing-Skun-Kampong Thom-Siem Reap ).
Loan Total length about 270Km 2011
Construction and Rehabilitation NR 44 ( Kampong Speu- Oral- Thmar Bang-Au Daung).
Loan 150 Total length about 161Km 2012
Construction and Rehabilitation NR 58 ( Banteay Meanchey-Banteay Meanrith-Thmor Daun ).
Loan Total length about 132Km 2013
Construction and Rehabilitation NR 55 ( Pursat-Phnom Kror Vanh-Thmor D )
Loan Total length about 189.7Km 2014
Chapter A-1 17
MUS$
Japan ON-GOING PROJECTSThe Project on the Improvement of NR1 (P.penh-Neakloung)
Grant 70.3 1/ Construction 2 bridge( Kompong Phnom and Samrong Thom ) 2/ Rehabilitation 42 Km ( PK 13 -PK 55 ) 3/ Rehabilitation 9 Km ( PK 4-PK 13 ) Total length 51km ,surface AC
2005-2011 100%
The constrution the second mekong bridge in Cambodia ( Neak Loeung )
Grant 100 2010-2013 On studying
PRIORITY PROJECTSConstruction of NR 76 b (Taveng-O Keo)
Loan 1.5 Construct a new road with a length about 30Km.
2010-2011 Proposed
The Project for Improvement of Siem Reap City Ring Road
Grant 13 2010-2012
Construction of Roads No. 3785 (78A) from Ban Lung to the Cambodia – Laos border.
Grant/loan
150 Construct new road with a length 150 Km. 2011-2014
Construction of NR5 Battambang - Sisophon upgraded 2lances and overlay from Posat to Battambang .
Grant/loan
46 Construction of NR5 from Battambang PK 291 to Sisophon PK 359 , upgraded 2lances total length 68 km and overlay from Posat PK 171 to BattambangPK 291 : 120Km .
2011-2014
Construction of NR5 Kampong Chnang -Posat upgraded 2lances .
Grant/loan
40 Construction of NR5 from Kampong Chang PK 91 to Thleama am PK 171 , upgraded 2lances total length 80 km .
2011-2014
The Improvement of the Road Construction Equipment at Provincial Areas Based on RCC.
Grant 5 2010-2010 Proposed
Urgent Bridges Rehabilitation Programe (8 bridges)
Grant 10 2010-2011 Proposed
The constrution the second mekong bridge in Cambodia ( Neak Loeung )
Grant 100 2010-2015 On going
Chapter A-1 18
Financing Project’s Name Project Amount MUS$
Description of Projects Period Status
ADBON-GOING PROJECTSRoads
GMS : Southern Coastal Corridor Project
Loan 18.5 2009-2011
Road Asset Management Project ( ADB WB AUS )
Loan 59 2008-2013
GMS: Cambodia Northwestern Provincial Road Improvement Project.
Loan 48Upgrade 113Km of NR 56 and some road safety and maintenance issues.
2010-2013
Korea Road Improvement Project, 32,5km Trapieng Ropeu-Kompot ( I )
Loan 17.1Construction a new bridge (Angtanou Bridge ) 300m .Repair damage base course and provide new surface.
2003-2007 Complete
NR 3 Improvement Project, 137,5km Phnompenh-Kompot ( II )
Loan 36.5Repair damaged base course, provide new surface, rehabilitate or replace weak bridges.
2008-2011 100%
Improvement of NR31 ,33 and Provincial R. No 117 and Kampot Bypasse Project.
Loan 35.4Repair damaged base course, provide new surface, rehabilitate or replace weak bridges.
2011-2013 on going
Chapter A-1 19
Financing Project’s Name Project MUS$ Description of Projects Period Status
Thailand Rehabilitation NR5 Poipet-Sisophon
Grant 5.8 1993-1994 - Rehabilitation NR5 Poipet-Sisophon
Rehabilitation of NR48 phase I (Laterat)
Grant 2.8 2000-2002 - Rehabilitation of NR48 phase I (Laterat)
Rehabilitation of NR48 phase II (Bituminous )
Loan 21.9 2004-2006 - Rehabilitation of NR48 phase II (Bituminous )
Rehabilitation NR 67 ( ChamSagnam-AnlounVeng ) 18Km.
Loan 2.6 2005-2007 - Rehabilitation NR 67 ( ChamSagnam-AnlounVeng ) 18Km.
Rehabilitation NR 67 ( AnlounVeng -Siem Reap)
Loan 34.2Total length 131 km 2007-2009 - Rehabilitation NR 67 ( AnlounVeng -Siem Reap)
Bridges Bridges
Construction for 4 Bridges on NR48
Grant 8 2003-2006 - Construction for 4 Bridges on NR48
Viet Nam
Reconstruction of NR 78(BanLung-Viet Nam border )
Loan 22.12 Provide a new layer of base course and asphalt concrete surface of 70km ,improve drainage and bridge .
2006-2010 Complete
Construction of Chrey Thom Bridge
Grant 22 Bridge Type Permanent structure . Bridge’s width : Carriageway :2 x 3.50m = 7.00m, Shoulder including safety strips : 2 x (1.5~2.5m) =3~5m, Parapets:2 x 0.5m =1.00m , Total 11.5 ~ 13m.
2009-2010 negotiate
Chapter A-1 20
21
Old Jetty
-Oknga Mong Port
-Sihanoukvill Port
-PhnomPenh Port
-PhnomPenh new terminal port : China
Under Study
Chapter A-1
Road Safety Trends on AH Road Safety Trends on AH (fatalities/accidents by sections)
Chapter A-1 22
8350
28
134
217
58
178
134
8660
43
166
230
38
131110110
5133
97
239
42
180146
95
4763
114
191
31
161181
0
50
100
150
200
250
300
NR1 NR2 NR3 NR4 NR5 NR6A NR6 NR7
2007 2008 2009 2010
AH1 AH11 AH11 AH11AH11AH1
OnOn--going initiatives to improve going initiatives to improve road safety situationroad safety situation
NN Measures Initiatives
Pillar 1 Road Safety Management
Develop expertise and capacity building of staff
Pillar2 Infrastructure Engineering solutions to reduce speed
Pillar3 Safe Vehicles Improvements and expansion of fleet safety
Pillar4 Road user behavior
Helmets on motorcyclists
Pillar5 Post crash care First Aids
Pillar6 Law enforcement Traffic police capacity building
Pillar7 Driving Licenses Improvement of training systemInitiate a demerit point system
Chapter A-1 23
THANK YOUTHANK YOU 24Chapter A-1