ICAO UPDATE...PBN IMPLEMENTATION UPDATE Global Overview 16 April 2018. PBN Implementation Plan Yes...

Post on 03-Oct-2020

5 views 0 download

Transcript of ICAO UPDATE...PBN IMPLEMENTATION UPDATE Global Overview 16 April 2018. PBN Implementation Plan Yes...

ICAO UPDATE

16 April 2018

)

Proceedings of the 2018 International Flight Inspection Symposium,Monterey, California, April 16-20, 2018

1

Overview• Global Picture and 

the challenges aviation is facing

• PBN implementation update

• ICAO Developments

– PBN

– AIM

– Flight Inspection16 April 2018 2

2

GLOBAL PICTURE AND THE CHALLENGES AVIATION IS FACING

Global Overview

16 April 2018

3

 ‐

 50

 100

 150

 200

 250

0

1000

2000

3000

4000

5000

6000

7000

8000

1944

1946

1948

1950

1952

1954

1956

1958

1960

1962

1964

1966

1968

1970

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

2010

2012

2014

2016

Revenu

e Pa

ssen

ger‐Kilometres

(billion)

Oil

cris

is

Gul

f war Asi

an c

risis

Iran-

Iraq

war

SAR

S

9/11

terr

oris

t at

tack

Wor

ld

rece

ssio

n

Freight Tonne‐Kilometres

(billion)

Growth of Air Transport

Scheduled commercial trafficTotal (international and domestic) servicesSource: ICAO Annual Report of the Council

205billion FTK

+3.8%vs. 2015

7.1trillion RPK

+7.4%growth rate vs. 2015

4

TRAFFIC DENSITY

2010202020302040

5

A Global Picture

16 April 2018Source: Aviation Benefits 2017 (https://www.icao.int/sustainability/Pages/IHLG.aspx) 

6

Link aviation to socio‐economic benifits• ICAO’s Strategic Objectives are strongly 

linked to 15 of the 17 United Nations Sustainable Development Goals (SDGs). 

• ICAO is fully committed to work in close cooperation with States and other UN Bodies to support related targets

16 April 2018Source: https://www.icao.int/about‐icao/aviation‐development/Pages/SDG.aspx

7

Our Aspirational Safety Goal

Our Aspirational Safety Goal

8

We are not that far…Regional Accident Statistics: 2015Regional Accident Statistics: 2013

Regional Accident Statistics: 2014 Regional Accident Statistics: 2016

For 2017 (non‐validated results)MID and AFI(APAC 2 – PA 1)

ZERO fatalities

9

Other Challenges

Cyber Safety RPAS Space TransportationGlobal TrackingConflict Zones

16 April 2018

10

GLOBAL PLANS AND THE 13TH AIR NAVIGATION CONFERENCE

Global Overview

16 April 2018

11

16 April 2018

13th AN Conference – October 2018

40th Assembly – October 2019

12

PBN IMPLEMENTATION UPDATEGlobal Overview

16 April 2018

13

PBN Implementation PlanPBN Implementation Plan

Yes

NoNo Data

14

Implementation of PBN Approach Procedures (World total)Implementation of PBN Approach Procedures (World total)

Total instrument runway ends: 3486

PBN runway ends: 233767%

15

Implementation of PBN Approach Procedures –With vertical guidance (World total)

Implementation of PBN Approach Procedures –With vertical guidance (World total)

Total instrument runway ends: 3486

LNAV/VNAV: 165247.4%

LPV: 1000

28.7%

16

PBN SID/STAR Implementation (World)

17

Summary• Still some way to go:

– Not all States have a PBN Implementation plan– Not all runways have PBN approaches– A37‐11 EXPIRED at the end of 2016

New impulse required through GANP and GASP

18

RECENT AND UPCOMING DEVELOPMENTS - PBN

Global Overview

16 April 2018

19

Flight OperationsPBN Ops approval – (Annex 6)

– Ops Approval for PBN– Only AR requires Specific Approval– All PBN requires regulator approval

• Approve the Operations Manual with PBN included

20

RNP AR APCH Approvals– Simplification of the process– Maintain high standard of oversight– Develop guidance on how to conduct approval

• Coordinated with PBN SG

Flight Operations

21

Flight Operations

PBN procedures for pilots and dispatchers• PANS OPS Vol I (Applicable 2018)

– New structure – All new PBN content– PBN requirements in PANS for 1st time

22

RNP Chart Identification• Circ. 353 published

– Advanced Copy• Transition plan

– Change from RNAV to RNP• Regional Plan

– Coordinate with States– Determine timeframe– Develop sequence

• Global Plan– Coordinated with PBN Programme Office

23

Sample Charts for PBN (AIS Manual):– A‐RNP Examples– PBN SID and Star– RNP AR APCH

24

PBN applications 

VPT RNAV (RNAV Visual)Two streams of work:– Development of Standardized approach

– Best practice for developing ‘specials’

25

PBN Applications

PBN to xLS– Hybrid procedures maximize flexibility– PBN path to a precision approach– Efficient and predictable path– Better access to airports

26

PBN ApplicationsTransitions

– Currently developed by many States

– No consistency– Need standardized criteria

27

PBN applications

Parallel Approach Operations– Extended to include PBN– RNP AR APCH– RNP APCH with vertical guidance

28

PBN applications

Established on RNP– RNP AR APCH only– Aircraft ‘established’ after IAF– Separation can be reduced accordingly

29

New PBN requirements

• PBN Manual 5th Planned for 2019– New AR Departures specification– Guidance for use of RF Legs– Additional Guidance

• Advisory VNAV explanation• A‐RNP implementation• All RNAV must be PBN

– Includes free route airspace

30

RECENT AND UPCOMING DEVELOPMENTS – AIS TO AIM

Global Overview

16 April 2018

31

Requirements and performance specifications

State provisions (or « what »)

Operational provisions AIM Practitioners’ 

instructions (or « how to »)

ExplanatoryGuidance text

PANS‐AIMAnnex 15 AIS manual

New AIM Provisions

AIM‐ SG/ First meeting

32

1) AIM Awareness

2) Training

3) QMS Implementation & Oversight

4) Data Origination

5) AIRAC

6) WGS‐84

7) Aeronautical Charting

8) NOTAM

9) Digital Datasets

10 )AIM interoperability

11) AIM for SWIM

12) AIM for drones

16 April 2018

AIM Steering GroupAIM Implementation

33

RECENT AND UPCOMING DEVELOPMENTS – FLIGHT INSPECTION

Global Overview

16 April 2018

34

Flight Inspection – doc 8071 update• Truly flight inspection

– Flight validation in doc 9906

• Emphasis on operational impact of testing Nav Aids• Types of inspection extended ‐ Consistency• Modern systems• Organizational aspects (QA, SMS)• Flight inspection interval

16 April 2018

35

Flight Inspection – doc 8071 update• ILS – extended def of ILS, DME and alternative height checks

• DME – build‐in test, together with PBN as support

• PBN – satisfies reference from PBN Manual

• VOR – material bends, roughness, scallopping errors, alternative errors

• PAR – modern type PARs

• NDB – minor additions on coverage

• En‐route VHF marker – improvement of measurement of coverage distance

36

THANK YOU!

16 April 2018

37