IC-IC Design and ideation

Post on 09-May-2015

1.482 views 1 download

Transcript of IC-IC Design and ideation

15 Nov 201315 Nov 2013 1IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Enhancing interconnectivity of short and long distance transport networks through passenger focused interlinked information-connectivity

Project 266250. Coordinator: Star Engineering GmbH

ICS development statusIdeation & Design WP5

15 Nov 201315 Nov 2013 2IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Ideation and design

This presentation serves as introduction to the current state of the development of the Info Connectivity System (ICS) concerning tasks of “Ideation & Design” in WP4 and WP5.

The results are work-in-progress and will be further developed for Deliverable D4.9 scheduled for end of November 2013.

15 Nov 201315 Nov 2013 3IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Working session at ESPI Amsterdam

Working Session at edenspiekermann (NL), Amsterdam

15 Nov 201315 Nov 2013 4IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Personas, costumer journey

Based on existing research we continued development of personas (hypothetical travellers) and traveller (customer) journeys for contextualized scenarios to verify the functional scope of the ICS mobile application (app).

15 Nov 201315 Nov 2013 5IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Personas, Costumer journey

Costumer journey of Japanese elderly couple and daughter visiting their son in Amstelveen (Tokyo Amsterdam Schiphol) used, being the one most profitable for the ICS development.

15 Nov 201315 Nov 2013 6IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Rapid Prototyping & Testing

Working Session at Fuenfwerken, Berlin Rapid prototyping the ICS app

15 Nov 201315 Nov 2013 7IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

ICS app functional scope

Output: Detailed concept wireframes of the functional scope of the app, and a clickable prototype invis.io/ZEJMCM2H. Copy&paste link for desktop or mobile-view.

15 Nov 201315 Nov 2013 8IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Testing the frontend

Scenario: Testing wireframes using customer journeys

15 Nov 201315 Nov 2013 9IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Design development

Impression: Design development

15 Nov 201315 Nov 2013 10IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Design refinement

Impression: Further design refinement

15 Nov 201315 Nov 2013 11IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

Output: Basic front-end concept for the app

15 Nov 201315 Nov 2013 12IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

What comes next?

Next steps:

• Development of screen designs for the ICS on the basis of current wireframe sets.

• Conception based on to be defined technical affordances of the ICS

• Animated demonstration of the ICS application in accordance with the chosen scenario– the costumer journey of the Japanese elderly couple and daughter visiting their son in Amstelveen (Tokyo Amsterdam Schiphol)

15 Nov 201315 Nov 2013 13IC-IC Status ICSIC-IC Status ICS5W/ESPI/FLU5W/ESPI/FLU

The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/2007-2013) under grant agreement n° 266250.