I-95/Route 630 Interchange, Alternative E

FUNDING(Cumulative)

SCHEDULE

JULY2007

JULY2008

JULY2009

JULY2010

JULY2011

JULY2012

JULY2013

JULY2007

JULY2008

JULY2009

JULY2010

JULY2011

JULY2012

JULY2013

$4.5M $7.2M $13.0M $16.2M $22.5M $28.8M

Needed to Complete:

$157M Priorto2007

BeyondJuly 2013

COST IN 2013 DOLLARSPreliminary Engineering $18,000,000Right of Way and Utilities $48,000,000Construction $120,000,000Total $186,000,000

(1994)

Project Funding and Schedule: I-95/Route 630

AUTHOR-IZATION

SCOPING

PRELIM. REVIEW

FIELD INSPECTION

ADVER-TISEMENT

RIGHT OF WAY

I-95/Route 630 Interchange Status Summary

• VDOT will utilize consultants for project development

• VDOT will be seeking a consultant contract in the next few months

• Significant additional funding will be required

• Project will probably be developed in phases

I-95/Route 630 Interchange – additional item

General Discussion:

• Through 2008 and into early 2009 VDOT will be performing additional studies to refine interchange design concepts and right of way footprint.

• An update of the Location Study will follow which will include an the NEPA required Environmental Assessment document and a Public Hearing.

• An interchange modification report will also be developed for FHWA approval to assure adequate performance of the design for future year traffic.

• It is anticipated these activities will be completed by late 2009 or early 2010.