Humber Zero

Project Summary & Partners

2

Overall Plot Plan

A presentation by Wood.3

Layout

A presentation by Wood.4

Process Configuration

A presentation by Wood.5

Layout - Uniper

Concept Layout

- Uniper Plot

• Green H2

• Blue H2 - SMR

Large H2 Blue Reformer – (ATR)

• Air blown design

• ~1 GW natural gas

Produces • 823 MWth H2/N2

syngas

• 735 tph steam

A presentation by Wood.6

Layout – Blue H2 ATR

VPII GT Refuelling

A presentation by Wood.7

Increasing Quantities of CO2 Captured through to 2030

8

Configuration

0

1

2

3

4

5

6

7

8

9

2021 2022 2023 2024 2025 2026 2027 2028 2029 2030

CO2 Export Volumes (MTPA)

VPII PCC LOR/HR PCC SMR/ATR ATR

Volumes of CO2

to T&S system

increase from

3.4 up to 8.1 mtpa

9

Humber Zero