How to use this template Here are some examples to get you started. Want to add more? Click the...

Post on 14-Jan-2016

222 views 0 download

Tags:

Transcript of How to use this template Here are some examples to get you started. Want to add more? Click the...

How to use this template

Here are some examples to get you started. Want to add more?• Click the “New Slide Button” to insert a slide directly after the one

you’re using. Home Tab>New Slide

• To pick the layout, use the drop down menu at the bottom of the “New Slide” button (an arrow)

• Or, in the Normal view you can right-click and of the slides at the left with your mouse and select “New Slide”

• You may also duplicate and/or overwrite existing slides in this master presentation for additional options

• Images in template are placeholders; replace with images relevant to your presentation

• UPDATE: For increased contrast try using the newly added Red and Black slide options. Find them here: Home Tab>New Slide.

Techniques for Coordinating

Utility Relocation

Presented by: Bill Morris, PE

Process

• Right of Way Plans.

• Engineering Contacts and

Agreements.

• Prepare Utility Plans.

• Relocation Agreements.

• Relocation Construction.

What could go wrong?

Who are utility owners?

Who Are the Utility Owners?

Who Are the Utility Owners?

Who Are the Utility Owners?

• Gas company said they were there.

• Said they were going to cut & cap line

prior to construction.

• Said they did cut & cap line.

• Said they were not on the project.

Who Are the Utility Owners?

Who Are the Utility Owners?

• Ownership of Utility Company Challenged.

JUM Markups

Right of Way Plans

ROW Plans – Utilities Highlighted

ROW Plans – Utilities Highlighted

ROW Plans – Utilities Highlighted

ROW Plans – Utilities Highlighted

ROW Plans – Incomplete

Right of Way Plans

• Identifying the Utility Lines.

• Utility Lines incomplete.

• Utility Lines incorrect.

JUM Markups

JUM Markups

Coordination with Design Team

Redesign Ramp to miss Telephone RTS

Redesign Mainline to miss RTS

Redesign to Accommodate Transmission Tower

Redesign to Accommodate Transmission Tower

Schedule

• Letting

• KYTC Priorities

• Waiting on other Utility Companies

▪ Design

▪ Construction

JUM Markups

Proposed Conflicts

Proposed Conflicts

• With Other Utility Companies.

• With Cranes.

• With Existing Structures.

• With Drainage.

• Clear Zone.

Identify

Conflicts with Other Utilities

Conflicts with Crane

Conflicts with Crane

Conflicts with Crane

Conflicts with Existing Structures

Utility Design

• Leave existing poles within disturbed

limits.

• Put proposed poles within disturbed

limits.

• Put proposed underground within

disturbed limits.

Utility Design

Right of Way

• Prioritize Parcels.

• Relocation Phases/Sections.

• Utility Corridor.

• US 62 in Leitchfield.

• Newton Pike D/B in Lexington.

• KY 56 in Union County.

• Who is Acquiring Utility Easements.

• Property Owner’s Dilemma.

Construction Schedule

• Disasters

▪ Hurricanes

▪ Tornados

▪ Floods

▪ Ice Storms

• Too Wet

• Other Oddities

JUM Markups

Get Organized

Spreadsheet

General InformationS

ecti

on

Uti

lity

Typ

e

Uti

lity

Co

mp

any

Co

nsu

ltan

t

Est

imat

ed C

ost

of

Rel

oca

tio

n

Est

imat

ed C

ost

of

En

gin

eeri

ng

10-126.12 5/29/2015 9/24/2014

STP 61058 Communication AT&T Kentucky N/A 445,254.62 180 9/17/2014

FD52 077 61708 03U Telephone Foothills Rural Telephone PEC 102218.15.15 26,903.65 14 after AT&T completes 9/17/2014

Communication Howard TV N/A 82,582.25 14 after Foothills completes 9/17/2014Water Magoffin County Water District Kenvirons 166,500.00 41,299.00 with roadway contract 9/17/2014Gas John Gray Energy Gas N/A cut & cap 9/17/2014Gas Resolution Gas cut & cap 9/17/2014

694,336.87 68,202.65

9/3/2015 12:22

762,539.52

Cal

end

ar D

ays

for

Co

nst

ruct

ion

Pro

ject

Au

tho

riza

tio

n

Let

tin

g

Join

t U

tili

ty M

eeti

ng

EngineeringR

ecei

ved

Res

po

nse

Pel

imin

ary

Co

nst

ruct

ion

Est

imat

e

Co

nsu

ltan

t F

ee

Pro

po

sal

ES

C

KY

TC

Ap

pro

val

GE

C A

pp

rova

l

Co

mp

any

Fee

P

rop

osa

l

Rei

mb

urs

emen

t C

alcu

lati

on

s

Sen

t to

KY

TC

fo

r A

pp

rova

l

Rec

eive

d A

pp

rova

l fr

om

KY

TC

Mai

led

to

Uti

lity

Co

. fo

r S

ign

atu

res

Exe

cute

d

PO

No

.

9/8/2014 9/18/2014 3/30/2015 3/16/2015 3/16/2015 4/13/2015 4/16/2015 5/28/2015 5/28/2015 6/1/2015 6/1/2015 6/22/2015

9/3/2014 9/18/2014 3/27/2015 3/10/2015 3/24/2015 3/27/2015 3/30/2015 4/23/2015

Consultant Request Engineering Services Contract Package Engineering Services Agreement

Plans & Relocation AgreementP

lan

s

Sp

ecif

icat

ion

s

Est

imat

e

KD

OW

Per

mit

Co

nst

ruct

ion

Day

s

Rei

mb

urs

emen

t C

alcu

lati

on

s

Sen

t to

KY

TC

fo

r A

pp

rova

l

Rec

eive

d A

pp

rova

l fr

om

KY

TC

Mai

led

to

Uti

lity

Co

. fo

r S

ign

atu

res

Exe

cute

d

PO

No

.

3/17/2015 3/12/2015 3/20/2015 3/23/2015 3/23/2015 4/6/2015 1500004466

3/30/2015 3/16/2015 3/31/2015 YES 4/7/2015 5/13/2015 1500004697

4/3/2015 4/10/2015 4/14/2015 YES 4/15/2015 6/5/2015 15000050453/23/2015 4/7/2015 3/27/2015 3/11/2015 3/24/2015 3/27/2015 3/30/2015 4/8/2015 1500004554

12/1/2014

PS&E Relocation Agreement

Construction

RO

E

NT

P

Beg

in

En

d

Cu

t &

Cap

ped

As-

Bu

ilts

5/7/20155/7/2015VERBAL

5/12/2015

5/7/20154/21/2015VERBAL

4/22/2015

5/7/2015 6/22/2015

5/29/2015

Construction

KURTS

• Depository for the documents.

• Process.

• Keeps track of approvals.

Get the project built.