How to participate in the webinar

All attendees are muted. To adjust your audio settings

during the meeting, click on Audio Settings.

Please use theQ&A window to ask

questions or offercomments.

CHAT is disabled during the presentation. Please communicate with the team through

the Q&A window.

3

Welcome and introductions

Graham

• Project Director – John Welch

• Host and MSVWBE Manager – Tom McMillan

ZANN – Diversity & Inclusion Specialists

• Diversity & Inclusion Manager – Suzanne Arkle

• Diversity & Inclusion Resource Specialist – Darling Nava

4

Welcome and introductions

• SR 520 Director of Construction – Dave Becher

• Mega Projects Diversity & Inclusion Manager – Regina Glenn

• Mega Projects Compliance Manager – Bobby Forch

WSDOT

5

Who we are

91 YEARS OF CONSTRUCTION

PROJECTS

ANNUAL REVENUES OVER $2.3 BILLION

$500 MILLION ANNUALLY IN THE US

US HEAD OFFICE IN BELLEVUE

1,300+ STAFF EMPLOYEES AND 5,000+

CRAFT EMPLOYEES

100% EMPLOYEE-OWNED

VisionTo be North America’s premier integrated construction solutions partner.

MissionTo provide superior integrated construction solutions throughout NorthAmerica while offering our employees a challenging and rewarding career within a safe work environment.

6

Our values

Health, Safety and Environment

We are on the Road to Zero incidents through good management and utilization of our resources, a comprehensive HSE management system, a strong supervisory presence, an actively caring culture and leadership engagement.

Quality

From planning, design and scheduling to materials, construction and environmental practices, we build care and quality into every step.

SR 520 Montlake Project

What is this project?• Replacement of the old

SR 520 eastbound bridge

• Remove the 24th Avenue East and Montlake Boulevard overpasses

• Construct a new lid and park

Looking west at the existing Montlake Boulevard overpass(to be demolished).

8

Looking east at the existing 24th Avenue East overpass (to be demolished).

9

Looking east at the existing SR 520eastbound bridge (to be demolishedand replaced).

10

MSVWBE program components

11

MSVWBE Program

Outreach Procurement Supportive Services

Compliance Monitoring &

Reporting

Capacity Building

12

Commercial Requirements

Bonding for Contracts over $200,000 Prompt Pay Insurance

MSVWBE Participation Certified Payroll Prevailing Wage

Project goals: total 26%MBE 10% SBE 5%VBE 5%WBE 6%

Bid process – next stepsPlease be sure to fill out our Subcontractor Registration Form if you haven’t already. You will receive an email from SmartBidNet.com to update your company with Graham through SmartBid semi-annually.

Your firm will be receiving an Invitation to Bid by e-mail.

If your company is interested in quoting any project:• Please respond to the invitation to let us know you will be quoting. You must have a valid e-mail

and NAICS codes in the system to receive an invitation. • Be sure to let us know ALL scopes of work you are interested in quoting.• You will need to sign the confidentiality agreement (on SmartBidNet.com) before you can view the

project documents.

On SmartBidNet.com, you will be able to access the owner’s documents, bid instructions and scope packages.

Quotes must be received by the deadline in the invitation. Send quotes through SmartBid, to WashingtonBids@grahamus.com or by fax to (425) 691-5524.

13

Evaluation process

Best value criteria• Competitive Pricing• Capacity• Experience• Safety Record• Bonding Capacity• Insurability

14

Current opportunities in theSR 520 Montlake Project scopes of work

GRAHAM WORK Landscaping Guardrail Pigmented sealer Misc. metals – canopies

& railings supply Misc. metals – canopies

& railings erect Sign bridges Valve control building

GRAHAM WORK Painting – canopies,

anti-graffiti Permanent fence Standing seam metal

roof & gutters Waterproofing Concrete flatwork Road signs

(procurement/ placement)

MAJOR SUBS American Bridge Diving Pig seal (and other coatings) Eastbound on-ramp

demolition

Elcon 26 KV Line – material Misc. equipment material Misc. electrical sub-

contractor

15

Sign bridges – bids late 2020

16

Overhead signs – bids late 2020

17

Roadside signs – bids late 2020

18

Waterproofing – bids late 2020

19

canopies – bids early 2021Pigmented sealer/anti-graffiti/painting

20

Concrete flatwork – bids early 2021

21

Valve control building (exclude roof, electrical, and piping) – bids mid-2021

22

Standing seam metal roofand gutters – bids mid-2021

23

Misc. metals/canopies/railings – bids mid-2021 (2 contracts; supply and erect)

24

Guardrail – bids mid-2021

25

Permanent fence – bids mid-2021

26

Landscaping – bids mid-2021

27

26 KV line – material –bids mid-2021 (Elcon)

28

Misc. large equipment purchase– ongoing (Elcon)

29

Misc. onsite electrical work – lower tier subcontract – currently open (Elcon)

30

Divers – open (American Bridge)

31

On-ramp from Lake Washington Boulevard,land side demo – bids mid-2021 (American Bridge)

32

33

How to contact usDarling Nava is the central point of contact for all initial bidding for the project:

Email: darling@zanninc.comPhone: 813.947.8586

Questions & answers