How to build a Spaghetti Chart

Post on 10-Jun-2015

4.875 views 5 download

description

How to build a spaghetti chart to see and reduce waste.

Transcript of How to build a Spaghetti Chart

How to build a Spaghetti Chart

and facilitate waste reduction

Created by Tom Curtis 2011Blog: www.onimproving.blogspot.comPresentations: on www.slideshare.net/onimproving Email: ideamerchants@gmail.comTwitter: @onimproving

If you connected the steps of your

process would it look like this?

The How To

1

24

3

5

123 45

6 7

12

3 4

56

Doing Spaghetti Charts are like doing dot-to-dots.

it is.

1

Mark where your process starts.

1

Mark the next activity spot and connect.

2

4

31

Continue through the process.

2

57

6

The Review

4

31

Are there any steps that can be removed?

2

57

6

X

4

31

Are there any steps that can be reordered?

57

6

X2

4

31

Are there any steps that can be physically moved?

57 6

X2

31

Renumber steps and document the new process.

46 5

2

31

Compare Before and After

46 5

2

4

31

2

57

6