Highlights fro TR

Post on 22-Feb-2016

38 views 0 download

Tags:

description

Highlights fro TR. Collaboration meeting CERN 12/11/2012. Experimental Setup. y. 2 views 4 covers per view 2 SRB read via VME. z. x. Jura. Saleve. View V. View U. = active regions. Beam Profile. The instrumented straws showed the radial beam profile . Entries per Channel. - PowerPoint PPT Presentation

Transcript of Highlights fro TR

Highlights fro TRCollaboration meetingCERN 12/11/2012

2

Experimental Setup

= active regions

View V

View U

Jura Saleve

z

y

x

- 2 views- 4 covers per view- 2 SRB read via VME

12/11/12

3

Beam ProfileThe instrumented straws showed the radial

beam profile En

tries

per

Cha

nnel

12/11/12

4

Entri

es p

er C

hann

el

Beam ProfileThe straws instrumented have shown the

radial beam profile

SRB 3 SRB 212/11/12

5

Beam ProfileThe straws instrumented have shown the

radial beam profile En

tries

per

Cha

nnel

SRB 3 SRB 2

Missing straws

12/11/12

6

Entri

es p

er C

hann

el

Beam ProfileThe straws instrumented have shown the

radial beam profile Dead channel

SRB 3 SRB 212/11/12

7

Burst StructureAnd burst time structure

Even

ts/3

33m

s

SOB EOB12/11/12

8

Bad Words and Data Contamination Data suffers of contamination due to lost of part of

data structure, some times this is recognizable and data can be used. But in a lot of cases this is not possible

Spill Time Structure

Even

ts/3

33m

s

12/11/12

9

Bad Words and Data Contamination Data suffers of contamination due to lost of part of

data structure, some times this is recognizable and data can be used. But in a lot of cases this is not possible

Beam Profile Structure

Entri

es p

er C

hann

el

12/11/12

10

Bad Words and Data Contamination With the threshold equalization we have seen a

strange behavior, not present channels start to populate when at least one channel increase beyond 40Hz

Entri

es p

er C

hann

el *

Spill

widt

h

12/11/12

11

Bad Words and Data Contamination With the threshold equalization we have seen a

strange behavior, not present channels start to populate when at leas one channel increase beyond 40Hz

Entri

es p

er C

hann

el *

Spill

widt

h

12/11/12

12

Bad Words and Data Contamination With the threshold equalization we have seen a

strange behavior, not present channels start to populate when at leas one channel increase beyond 40Hz

Entri

es p

er C

hann

el *

Spill

widt

h

12/11/12

13

Data SelectionReadout problems -> data selection

◦ Mismatch between the SRBs number of triggers

◦ “Bad Words”◦ Thresholds ok from run 388, 1.25V before

Analysis performed on run 368, taken in low intensity conditions (0.1 x1011 prontons on T10) for CEDAR alignment

Quality cuts applied to data contamination (<5 per mill)

12/11/12

14

Run 368300 out of ~600 bursts match triggers

quality cut (same number of triggers in the SRBs)

132 bursts out of 300 good for data analysis (contamination lower than 5 per mill )

12/11/12

15

Results

Time (ns)

The corrected CHOD time has been used to find the T0 for all channels.

12/11/12

16

Results (drift time all ch)Drift time measurement has been performed using the T0 from CHOD

Time (ns)12/11/12

17

Results (drift time ch 10)

Time (ns)

Drift time measurement has been performed using the T0 from CHOD

12/11/12

18

Results (wire distance ch 10)Wire distance measurement has been performed using the drift velocity curve measured during the test beam

Time (ns)12/11/12

19

Results (“assumed” drift velocity curve)

Drift Time (ns)

Wire

Dist

ance

(mm

)

12/11/12

20

The End

12/11/12

21

Run 368Good Data

12/11/12