Heller Flexible Machining SystemPrivately Negotiated Sale Conducted by Gibbs Machinery Company

Pre-Fracture MachiningOperations 5 - 70

OPERATION 5/10-1

HELLER MCH 400 PC

Qualification Crank Bore/Pan

OPERATION 5/10-2

HELLER MCH 400 PC

Qualification Crank Bore/Pan

OPERATION 20/1A-1B

HELLER MCH 400 PC

Rough Cylinder Bores and Top Deck

OPERATION 20/2A-2B

HELLER MCH 400 PC

Rough Cylinder Bores and Top Deck

OPERATION 40/1A-1B

GROB BZ 800

Finish Pan Rail, Main Cap Bolt Holes

OPERATION 40/2A-2B

CINCINNATI HPC 800

Finish Pan Rail, Main Cap Bolt Holes

OPERATION 50/1A-1B

HELLER MCH 350 PC

Drill & Tap Mounting Holes Front, Rear, Sides

OPERATION 50/2A-2B

HELLER MCH 350 PC

Drill & Tap Mounting Holes Front, Rear, Sides

OPERATION 60

DURR ECOCLEAN WASHER

Pre-Cracker Wash

OPERATION 70

ALFING FRACTURE SYSTEM

Fracture Main Bearing Caps

Finish MachiningOperations 80 - 180

OPERATION 80.1

HELLER MCD 450 D

Piston Cooling

OPERATION 90.1

HELLER MCD 450 D

Cylinder Bore Roughing / Left Right Mounting Holes

OPERATION 90.2

HELLER MCD 450 D

Cylinder Bore Roughing / Left Right Mounting Holes

OPERATION 100

Durr EcoClean

Pre-Assembly Wash

OPERATION 110

Assembly System

Bearing Cap Install

OPERATION 120

HELLER TRS 4000

Crank Bore, Idler Bore FR/RR Dowels

OPERATION 130

MARPOSS

In-Line Gage

OPERATION 140

HELLER TRS 4000VS

Cylinder Bore/Head Deck Finish

OPERATION 150.1

HELLER MCH 400 D

Fuel Pump/Air Compressor Pad, Mount Holes

OPERATION 150.2

HELLER MCH 400 D

Fuel Pump/Air Compressor Pad, Mount Holes

OPERATION 160

DURR EcoCLEAN

Pre Wash

OPERATION 170

DURR EcoFLEX

Robot Deburr & Final Wash

OPERATION 180

Reinhart Industrial

Leak Test