HAZEL SITE PROGRESS PHOTOShazelproject.in/wp-content/themes/twentyfourteen/... · hazel site...

Post on 12-Sep-2020

2 views 0 download

Transcript of HAZEL SITE PROGRESS PHOTOShazelproject.in/wp-content/themes/twentyfourteen/... · hazel site...

MARCH 31 2019

HAZEL SITE PROGRESS PHOTOS

PROJECT MAIN ENTRY – SECURITY ROOM

CLUB HOUSE- FRONT ELEVATION

EXTERNAL – CLUB HOUSE

CLUB HOUSE-GYM,MULTI PURPOSE HALL

CLUB HOUSE- INDOOR GAMES

CLUB HOUSE - ACTIVITIES

HOUSEWARMING FUNCTION DANCE CLASS

TABLE TENNISDRAWING CLASS

CLUB HOUSE - ACTIVITIES

HOUSEWARMING FUNCTION TABLE TENNIS

TABLE TENNISCAROM BOARD

ROAD FROM MAIN ENTRY TO ‘B’ BLOCK

BLOCK ‘B’ NORTH SIDE ROAD

BLOCK ‘B’ SOUTH SIDE ROAD

TRANSFORMER

EXTERNAL WORKS – ROAD WORKS/DRAIN WORKS/FIRE HYDRANT

BLOCK E SOUTH SIDE BLOCK F SOUTH SIDE

EXTERNAL WORKS – ROAD WORKS/DRAIN WORKS/FIRE HYDRANT

IN BETWEEN BLOCK D&F BLOCK F EAST SIDE

Block C North Side Swimming pool

WORKS IN PROGRESS:-

compound wall cum storm water drain Completed in Block E ,block F south side and

block A & C north side . Block F north east corner balance 20rmt in progress

Service work Completed in Block E & Block F south& east

side and in-between block D&F. progress in block C north side

Road work Completed in block E& Block F south side ,

85% completed in between block D& F. block F east side 50% ready for rcc road and balance in progress for pcc

Fire fighting work completed block E and block F south side and

progress in block A & C north side .

Swimming pool Structure completed .RR to be submitted the

final service drawing to commence the waterproofing and tiling work.

BLOCK F NORTH EAST CORNER WORKS IN PROGRESS:

OSR LANDSCAPE WORKS