Hazard Mitigation Assistance

East Bay Municipal Engineers (EBME) 2

Hazard Mitigation

What is Hazard Mitigation?

Hazard mitigation is defined as any

sustained action taken to reduce or

eliminate long-term risk to human life

and property from a hazard event.

“Fixing things before they break again.”

East Bay Municipal Engineers (EBME) 3

Hazard Mitigation Assistance

DisasterSpecific

Annually Appropriated

East Bay Municipal Engineers (EBME) 4

E233 5.4

HMA Grants Program

• Pre-Disaster Mitigation (PDM)

• Flood Mitigation Assistance (FMA)

— Available annually, subject to

Congressional appropriations

— Nationally competitive

• Hazard Mitigation Grant Program (HMGP)

— Post-disaster grant available to a state

after a Presidential declaration

East Bay Municipal Engineers (EBME) 5

Federal & State Mitigation Roles

FEMA Mitigation Role

• Provides guidance and technical assistance to states and local

jurisdictions to successfully apply for and manage HMA grants

Cal OES Mitigation Role

• Applicant/Recipient/Grantee

• Soliciting project proposals from eligible subapplicants

• Assisting subapplicants with developing applications

• Reviewing applications for eligibility and completeness

• Submitting applications to FEMA

• Provide sub-award to subapplicants

• Comply with HMA program requirements

East Bay Municipal Engineers (EBME) 6

State Agencies

Tribal Governments

Local Governments / Communities

Private Non-Profit Organizations (PNPs)

Eligible Subapplicants

East Bay Municipal Engineers (EBME) 7

Hazard Mitigation Plan Requirement

Subapplicants

PDM & FMA - Must have a FEMA approved and Board

adopted Mitigation Plan by the application deadline

and at the time of award/obligation.

HMGP-Must have a FEMA approved and Board adopted

Mitigation Plan by the time of award/obligation.

East Bay Municipal Engineers (EBME) 8

Cost Share Requirements

Cost Share

Federal

shareUp to 75% Up to 75%

• Up to 75%

• 90% (Repetitive Loss)

• 100% (Severe Rep Loss)

Non-Federal

share

(Local Match)

At least 25% At least 25%

• At least 25%

• 10% (Repetitive Loss)

• 0% (Severe Rep Loss)

East Bay Municipal Engineers (EBME) 9

Eligible ActivitiesEligible Activities

1. Mitigation Projects

• Property Acquisition for Flood & Structure Demolition

• Property Acquisition for Flood & Structure Relocation

• Structure Elevation

• Mitigation Reconstruction

• Floodproofing

• Floodplain and Stream Restoration

• Localized Flood Risk Reduction Projects

• Soil Stabilization or Erosion Control

• Minor Flood Control

• Floodplain and Stream Restoration

East Bay Municipal Engineers (EBME) 10

Eligible Activities Continued

Eligible Activities

1. Mitigation Projects

• Drainage Improvements

• Flood Diversion and Storage

• Structural/Non-Structural Seismic Retrofit

• Wind Retrofits

• Wildfire Mitigation / Ignition Resistant Construction

• Generators

• Hurricane Safe Room Construction

• 5% Initiative Projects

2. Hazard Mitigation Planning

3. Management Costs

East Bay Municipal Engineers (EBME) 11

Ineligible Activities

Do not reduce the risk to people, structures, or infrastructure

Dependent on another phase of a project

Physical work that has occurred prior to award

Projects constructing new buildings or facilities

Address operation, deferred or future maintenance, repairs, or

replacement

Studies not directly related to design and implementation of a

proposed project

Preparedness measures and response equipment

Major structural projects – levees, dams, etc.

East Bay Municipal Engineers (EBME) 12

Mitigation Projects

Drainage ImprovementElevation

East Bay Municipal Engineers (EBME) 13

Flood Control Mitigation

Before After

East Bay Municipal Engineers (EBME) 14

Erosion Control Mitigation

East Bay Municipal Engineers (EBME) 15

Structural Seismic Retrofit

East Bay Municipal Engineers (EBME) 16

Landslide Mitigation

East Bay Municipal Engineers (EBME) 17

Wildfire Mitigation / Ignition Resistant

East Bay Municipal Engineers (EBME) 18

Innovative Mitigation Actions

East Bay Municipal Engineers (EBME) 19

Hazard Mitigation Grant Program (HMGP)

• Recent 404 Mitigation

• Currently available statewide HMGP funding = $120M

HMGP-DR-CA-4301 = $24M

HMGP-DR-CA-4305 = $16M

HMGP-DR-CA-4308 = $80M

• Project & Planning grants for all hazards of HM Plan

• Cost share 25% Local and 75% Federal

East Bay Municipal Engineers (EBME) 20

Pre-Disaster Mitigation (PDM)

• FY17 Congressional appropriation = $90M

• FY16 Congressional appropriation = $99M

• FY15 Congressional appropriation = $25M

• Project & Planning grants for all hazards of HM Plan

• Cost share 25% Local and 75% Federal

East Bay Municipal Engineers (EBME) 21

Flood Mitigation Assistance (FMA)

• FY17 Congressional appropriations =$160M

• FY16 Congressional appropriation = $199M

• FY15 Congressional appropriation = $90M

• FMA is part of the National Flood Insurance Program (NFIP)

• Program goal is to reduce losses to the NFIP

• Projects must be flood focused and benefit NFIP insured structures

• Focused on Severe Repetitive Loss (SRL) and Repetitive Loss (RL)

Structures

• Cost share 75% Federal share and 25% Local

• Cost share 90% Federal share for RL structures

• Cost share 100% Federal share for SRL structures

East Bay Municipal Engineers (EBME) 22

Subapplication Contents

Scope of Work

Schedule

Cost Estimate

Benefit-Cost Analysis (BCA)

& Documentation

Feasibility & Effectiveness

Documentation

Environmental & Historic

Preservation Documentation

East Bay Municipal Engineers (EBME) 23

HMA Program Guidance

February 27, 2015

East Bay Municipal Engineers (EBME) 24

ContactsCalifornia Governor’s Office of Emergency Services

HMGP Grants Division

HMGP@CalOES.ca.gov

Steven Larson

Pre-Disaster and Flood Mitigation Division

(916) 845-8136

steven.larson@caloes.ca.gov

Federal Emergency Management Agency

Mitigation Division, Hazard Mitigation Assistance Branch

Aaron Lim

(510) 627-7036

Aaron.lim@fema.dhs.gov

Notice of Intent (NOI) Form: http://www.caloes.ca.gov/cal-oes-divisions/recovery/disaster-mitigation-technical-

support/404-hazard-mitigation-grant-program

Note: Approved HMGP Plan NOI,s Full application are due January 1, 2018