Former NAS Moffett Field

Hangar 1 Removal Action Update

Bryce Bartelma, PG

Navy BRAC PMO West

May 10, 2012

RAB Meeting

2

• Control release of PCBs from Hangar 1 in accordancewith EE/CA (July 2008) and Action Memorandum(December 2008)

Demolition of interior structures

Removal of contaminated siding

Application of weather-resistant coating to steel frame

Project Objective

3

Continued Monitoring andProtection Measures

• Increased biological activity

• Increased storm water and groundsurface protection during rainy season

• Navy and NASA air monitoring datademonstrates control of air emissions

4

Increased Biological Activity & Mitigation

• No Burrowing Owls

• Discourage IncipientNest Building byRavens and HouseFinches

• Brandt’s CormorantRescue

5

Increased Storm Water Management

Protection of Grassy Areas withHeavy Plastic Sheeting

Runoff Pumped to Holding Tanksand Treatment System

6

RAB Tour – March 14, 2012

7

Permanent Roof Access

• Roof Ridge Access for FAA Beacon and Holiday Star

• Mock-up Display for Navy and NASA Engineers

8

Progress – January 23

9

Progress – April 26

10

Mansard Panel Removal Completed

11

Zone 6 – Siding Removal

12

Palo Alto Perspective

13

Schedule

• Fieldwork in zones 1 – 3

Nearly Complete

• Fieldwork in zones 4 – 6

Ongoing

• Complete mezzanine andtouch-ups, confirmationsampling and demobilize

September 2012

• Submit After ActionCompletion Report

Winter 2012

14

Questions?

Point of Contact:

Scott Anderson

BRAC EnvironmentalCoordinator

(619) 532-0938

scott.d.anderson@navy.mil