Post on 20-Jan-2016
Half Moon Bay Drainage Maintenance
Agenda Item W14aApril 9, 2014
Appeal A-2-HMB-14-0004
Slide #1
Half Moon Bay Drainage MaintenanceSlide #2
Half Moon Bay Drainage Maintenance
Slide #3
Myrtle Street Bubble Up
Myrtle Street Bubble Up Showing Culvert Erosion
Half Moon Bay Drainage Maintenance
Slide #4
Area Drained by Wavecrest Road Drainage
Wavecrest RoadShowing Roadside Erosion
Half Moon Bay Drainage Maintenance
Slide #5
Magnolia Street DrainageWith Vegetation
Overgrowth
Magnolia StreetFlooding During Rain Event
Half Moon Bay Drainage Maintenance
Slide #6
Redondo Beach Road (East)Showing Sediment Fill at
Culvert
Redondo Beach Road (West)Vegetation Overgrowth Camouflaging Drainage
Half Moon Bay Drainage Maintenance
Slide #7
Poplar Road DrainageShowing Vegetation
Overgrowth
Railroad AvenueVegetation Overgrowth and
Sediment Filling Drainage