Gymnasium Suspended Floors

Post on 05-Dec-2014

823 views 0 download

description

 

Transcript of Gymnasium Suspended Floors

From the 54 page demolition

permit application

Labor Missionaries followed the plans

• Increasing evidence that the labor missionaries and their supervisors followed the plans will:

• Continue to unravel the various layers of deception and misinformation

• Provide Church auditors with a clearer view of methods and motives.

• Dispel the many enabling myths that have perpetuated this fraud over 15 years.

• Require Beca to reciprocate with plan details and pictures or retract

• Warrants a call to the CEO of Beca to voluntarily come forward and make things right.

What of the plan details?

• The 10 seismic claims do not reference any related plan details or pictures

• They are not specific to any particular location

• These unsubstantiated seismic assumptions have cast a wide net over the David O McKay Building, the Temple and the Fosters Roadchapel

• They have become the basis of all past, present and future decisions

• Including the already approved and planned $4 million expenditure on the Temple and Fosters Road chapel.

• One positive result of the decision to demolish the school is that these consulting companies will not enjoy their biggest pay day.

• The $60 million estimate to repair the David O McKay Building

Integrity

• These seismic claims are a summary of all of the reports over a 15 year time span.

• They are broad and sweeping with little to no plan details and pictures.

• The mounting evidence will expose the guilty parties to the light of day

• The seismic claims are not tied to any code issues.

• Statements such as “the walls are not connected to the foundations or the columns” are statements of assumed fact.

• Our evidence turns these facts to fiction

The labor missionaries followed the detailed plans and strongly tied the gymnasium floors to the foundations.