May 19, 2020

GRINNELL COLLEGEHumanities & Social Studies Center

Owner and Design Team

➢ Grinnell College HSSC Project

Leadership Team:

➢ Anne Harris

➢ Jim Swartz

➢ Erik Simpson

➢ Keith Brouhle

➢ Rick Whitney

➢ Dave Robinson

➢ Larry Gleason

➢ Keith Archer

➢ Nancy Combs

➢ Christi Baker

➢ Jane Taylor

➢ EYP Architects

➢ Jennifer Amster

➢ Eric Kern

➢ Eric Petersen

➢ Alison Ledwith

➢ OPN Architects

➢ Bill Catrenich

➢ Pylar Eaton

McGough Project Team

➢ Dustin Schwake – Project Executive

➢ Ryan Drew– Senior Project Manager

➢ Jennifer Radniecki – Project Manager

➢ Alex Maass – Assistant Project Manager

➢ Amy Robinson – Lead Project Coordinator

➢ Chuck R. Carpenter – Senior Superintendent

➢ Greg Evans – Superintendent

➢ Jon Hansen – Laborer Foreman

Subcontractors

➢ 1st Interiors

➢ Advance Equipment Co.

➢ All-American Scaffold

➢ American Fence Co.

➢ American Structural Metals

➢ Architectural Wall Systems

➢ Baker Electric

➢ Baker Group

➢ Bartley Sales

➢ Blue Sky Cleaning

➢ Bolander

➢ C&C Demolition

➢ CGA

➢ D&N Fence

➢ DA Bunch

➢ Danny’s Construction

➢ Des Moines Marble

➢ Energy Control of Iowa

➢ Floors by Beckers

➢ Forman Ford

➢ Heartland Finishes

➢ J&M Roofing

➢ Johnson Specialty Sales

➢ KONE Elevator

➢ Larry’s Window Services

➢ Midwest Caulking

➢ Navetta

➢ PAC-VAN

➢ Pella Tree Service

➢ Peterson Contractors, Inc.

➢ Premier Edge

➢ Pro-Bel

➢ S&F Underground

➢ Seedorff Masonry

➢ Skold Companies

➢ Soil-Tek

➢ Summit Fire Protection

➢ Superior Painting

➢ Swanson & Youngdale

➢ Waldinger Mechanical

➢ Walsh Door & Security

➢ Western Specialty

➢ Wilkie Sanderson

➢ Wynn O. Jones

➢ Landscaping:

➢ Threshold pier lanterns are being set

and powered.

➢ Light poles outside of ARH and

Carnegie are installed and are in

process of being powered up.

➢ Black dirt is being spread and

backfilled against new sidewalk.

➢ Plantings to start week of 5/18/20,

dependent upon weather.

Current Highlights

➢ Carnegie:

➢ Punchlist corrections

➢ Furniture delivery and installation

➢ Behind Firewall:

➢ Punchlist corrections

➢ ARH:

➢MEP trim-out continues

➢ Installation of wood paneling and fins

in auditorium

➢ Terrazzo installation at corridors

➢ Paint touch-ups ongoing

Grinnell College main sign at Hwy 6 and Park Street

Threshold piers at Bucksbaum

Threshold piers and steppers between Goodnow and Steiner Hall

Threshold piers between Carnegie and Herrick Chapel

Backfill of black dirt and final grading nearing completion pending weather compliance, looking south towards Herrick Chapel

Backfill of black dirt and final grading nearing completion pending weather compliance, looking north towards Younker Hall

ARH 1st floor - Metal panels and doors set at atrium connection

ARH 1st floor - Wood ceiling installation

ARH 1st floor - Coffee Bar tile installed

ARH 2nd floor - Bridge connection, finishes installed

ARH 2nd floor looking south

ARH - Plumbing fixtures installed

ARH - Vanity set, fixtures installed

ARH - Carpet installed in individual rooms

ARH - Auditorium ceiling

ARH - Reading Room ceiling

ARH - Wood fin backup system

Carnegie basement furniture installation

Carnegie 1st floor office space

Carnegie 2nd floor hallway

Carnegie 2nd floor - Wall covering at ST401

Upcoming Highlights

➢ Carnegie:

➢ Furniture installation

➢ Punchlist corrections

➢ Behind Firewall:

➢ Punchlist corrections

➢ ARH:

➢MEP trim-out

➢Wood fin installation

➢ Terrazzo completion

➢ Paint touch-ups

➢ Landscaping:

➢Completing plantings Tile D west

➢Saw cutting and demolition of

intersection 8th Ave. and Park Street

➢Saw cutting and demolition of widened

crosswalks on 8th Ave. towards JRC