GRID and IT at INCDTIM Cluj-Napoca Recent Progress and Prospects Ing. Farcas Felix NATIONAL...

Post on 30-Mar-2015

214 views 0 download

Tags:

Transcript of GRID and IT at INCDTIM Cluj-Napoca Recent Progress and Prospects Ing. Farcas Felix NATIONAL...

GRID and IT atGRID and IT atINCDTIM Cluj-NapocaINCDTIM Cluj-Napoca

Recent Progress and Recent Progress and ProspectsProspects

Ing. Farcas FelixIng. Farcas Felix

NATIONAL INSTITUTUL FOR RESEARCH AND DEVELOPMENT OF IZOTOPIC AND MOLECULAR TECHNOLOGY

HistoryHistory

20052005 20062006 20072007

Projekt IFIN GRID ATLAS

2 Servers Pentium 4 Dual procesor, Dual core, 3 Ghz, 4 GbRam,

Project IFIN for GRID ATLAS – 4 Servers Pentium 4 Dual procesor, Dual core, 3 Ghz, 8 GBRam,

N

E

X

T 2

0

0

7

Click Next

Present days – in INCDTIMPresent days – in INCDTIM

Link between main buildings at 1 Gbps Link between main buildings at 1 Gbps through a modern networking system through a modern networking system

based upon UTP Cat6 cable and FObased upon UTP Cat6 cable and FO

Cat6 UTP

Patch FO

Cisco Linksys 10/100/1000

2 server Pentium 4, 2 server Pentium 4, Processor 3 Ghz, 2 GBRam, HDD 150 GBProcessor 3 Ghz, 2 GBRam, HDD 150 GB

- a communication /web / mail server- a communication /web / mail server- a Database server- a Database server

SO Linux Centos

Switch Layer 3 Cisco 3750Switch Layer 3 Cisco 3750

Module 1 Gbps

Connection Module 1/10 Gbps

A link to the main RoEduNet Cluj – A link to the main RoEduNet Cluj – Napoca Napoca nodenode with a speed of with a speed of 1 Gbps1 Gbps

~ Dark Fiber ~~ Dark Fiber ~

Link activ in tests

Fibra optica single mode

Present – in GRIDPresent – in GRID

12 servers dual processor 12 servers dual processor dual coredual core

6 servers dual processor 6 servers dual processor quad corequad core

dual coredual core

quad quad corecore

2 Rack, 42U2 Rack, 42U

Model to be bought in the near future, till the end of the year

Rack in use without walls

UPS 5000 VaUPS 5000 Va

front view Back

view

Storage Area NetworkStorage Area NetworkCapacity 4 TBCapacity 4 TB

SAN

Server – Pentium 4, single processor 1.6 Gb, HDD 2x80 Gb

Future is looking brightFuture is looking bright

Projekt for a New WebsiteProjekt for a New Website

Finishing the Finishing the DatacenterDatacenter

15.11.2007

23.11.200726.11.200

7

Obtaining the certificates Obtaining the certificates for User, Host & RA – for User, Host & RA –

ManagerManager

Starting RO-ITIM-CJ Grid SiteStarting RO-ITIM-CJ Grid Site

New technology with the possibility to be used in GRID

in the very near future

• BLADE system

• Less power use

• Less space occupied

• Less management cost

• Virtualization

Blade TechnologyBlade Technology

Thank you for your time

Your question and comments will be very appreciated